Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Caledonia, IL
Posted:
June 12, 2014

Contact this candidate

Resume:

David Kirschner

502-***-****

Email acejic@r.postjobfree.com

**** ****** **.

Louisville, KY 40219

Plant Engineer – Howorth Company

Louisville Kentucky

Plant Engineer – Quality Assurance - Systems Maintenance

Plant Engineer

Lead from the intersection of technology development, analytical design in providing high level

strategic understanding, formulation, of detailed analysis within operational scope. By further

demonstrating cutting edge breakthrough within software/plant engineering operations, by

providing strong leadership, for superior technology systems, with stout resounding solutions, to

commitment to excellence.

Highly qualified project/plant engineer with more than 10 years of progressive experience in

analysis, design, setup, implementation, maintenance, repair, and replacement of complex

manufacturing equipment, facilities, and support systems. Possess exceptional, team building

and leadership skills, interpersonal relations, negotiation, written and verbal communication

abilities. Full lifecycle project management experience, demonstrated proposal/contract

development, strategic planning, and cost benefit analysis capabilities. Possesses understanding

of Six Sigma and ISO Internal Auditor Processes.

Stout consistent track record; of esprit de corps of continued success, providing state of the art

technology focusing on, methodology, bottom line Research, with resounding technical data

analysis in a lead consistent peak performance and organizational success.

CAREER ACCOMPLISHMENTS

Extreme Programming (XP)

Java

SQL

Navision

Adobe Dream Weaver

Systems Analysis and Design

Microsoft Visio

SQL Server Management

Help Desk tier 1

Dynamic Systems Development Method (DSDM)

Microsoft Professional (MP)

Feature Development Driven (FDD)

MECHANICAL TECHNICAL EXPERIENCE

Cisco operating systems, Sun Micro Systems, Fiber Optics Secure Data Communications, Oracle, Design,

Presto Robotic Automation, Lantach Stretch Wrappers, Wayne Case Erectors, Thiele Robotic Automation,

Microsoft Project, CAD, CAD LT, Windows Vista, Power Point, Blue Print Reading on CAD Designs,

Macrobiotics, SAP and MRP. Expert knowledge Allen Bradley PLC systems, Wonder ware. Experience

with MOCs, PSSRs, PHAs, PSM and ISO audits Stand up/Set down fork trucks “Raymond” – “Hyster” –

“Clark” – “Linde” Hydraulic, Pneumatics, Electrical trouble shooting, Commissioning of machines

“Robotic”, TOX punch-die tables for specific customer requirements, Conveyor system’s mile system

implementation, start-up, process improvement, quality metrics, 2 phase – 3 Phase electrical trouble

shooting, Equipment set up implementation, lean process metrics, Warehouse operations improvement

quality.

PROFESSIONAL EXPERIENCE

2011 to 2014 Project Engineer/Manager Howorth Co. Louisville KY.

Plant Engineer (2011 to Present)

Project Manager (2000 to 2011)

Establishing and creating Oracle database design infrastructure with concentration was software

application domains. My department implemented and created barriers to software engineering

issues with strong implementation with analytical outcome. From genomic research core and

technical algorithms of applying these technical challenges for which now remain in theory and

practice.

Organizational Development & Leadership

• Led implementation and generating concise analytical mathematical significance within the

technical software engineering realm, achieving global performance of ethics standards utilizing

many percent of staff in the quality of performance metrics of spearheading this significant

achievement through strong contribution of the team generated and implemented Project

Management/Plant Engineer policies.

Plant Engineer in implementation of Customer based equipment throughout the Howorth

Company, supporting GE Facility’s, in facing the ever growing changes in global market

regulations, Design/Innovations.

Six Sigma compliant improvement internal processes within General Electric in producing a

stout team, that reduced 48 hour cycle time by 90% of current General Electric Appliance Park

AP6; manufacturing practices process, quality metrics, in supporting General Electric Appliance

Park metrics, design, to final product.

Technology Leadership & Advancement

SharePoint Portal Server Deployment Upgrade/Integration Unix/Linux

Active Directory Upgrades Operating Systems

Cost Reduction/Cost Avoidance Program Maintainability of Fork Truck fleet (16)

2014 Green Energy Stewardship Award reduced the plants electrical operational

expense by 75%

Organizational Leadership. Built resounding leadership team, strategy, culture and business model,

that positioned company as the industry leader throughout the division of General Electric Appliance

Park, based on sales volume and market share throughout key segments. Re-branded company to position

for high-yield growth and global market dominance.

Military: Served as Special Operations Officer for United States Navy 13 years, decorated veteran

EDUCATION

B.S.I.T, Computer Information Systems, “Software Engineer” Colorado Technical University

Colorado Springs, CO 2017

acejic@r.postjobfree.com



Contact this candidate