Von M. Brickhouse
**** ****** ****** #**** * ouston, TX 77007 Cell: 760-***-**** acefh6@r.postjobfree.com
Objective
Seeking a challenging engineering position where I can contribute to organizational goals and further
develop my technical and professional skills
Education and Professional Development
• Bachelor of Science, Chemical Engineering, May 2011; University of Texas at Austin
• Received certificate of achievement in designing and implementing a process safety
management program course and awarded 1.4 CEUs
• Trained to OSHA’s Hazardous Waste and Emergency Response Hazardous Materials
Technician Level
• Successful completion of Industrial Safety Training Council’s Basic Plus Orientation course
• Successful completion of OSHA 30-Hour General Industry Safety and Health course.
• Certified in Standard First Aid/CPR and AED
P rofessional Knowledge, Skills, and Abilities
• Knowledgeable in industrial hygiene and health & safety regulations and practices
• Experienced in IFS, FracPro, Polymath and Aspen Plus User Interface
• Knowledgeable in PI H istorian, Materials Library, MATLAB, Simulink, AutoCAD, and JMP
• Competent in I MPACT incident management application
• Proficient in Windows and Mac OS X operating systems
• Skilled in M icrosoft Word, PowerPoint, Visio, Outlook, and Excel
• Proficient knowledge of various accounting and document management software
• Effective communication skills and able to work as a valuable member of a team
Plant Engineer, Total Refining & Petrochemicals USA, I nc. - Houston, Texas (Oct. 2012 –
Current)
•Implements and prepares necessary documentation for projects ranging from 20k-250k for safety
i mprovements, cost reduction, and overall process efficiency
• Provides t raining on plant upgrades, new procedures, and MOC’s
• Site manager of Mechanical Integrity and Management of Change (MOC) PSM elements
•Serves a lead role on site Loss Control committee by reviewing I MPACT incidents, participating
i n ISO and PSM audits, and promoting PSM practices
• Administers piping, storage tank, and pressure vessel programs to ensure the reliability and
i ntegrity of the plant
• Conducted two PHAs on secondary reactor and drying bed nodes, included coordinating action
i tems to reduce r isk and improve plant safety
• Developed and implemented MSS system for pressure vessel and storage tank inspections and
p ump maintenance
•Mechanical design and review of process installations. Consults with outside experts, as needed
• Elicits and secures competitive construction bids from outside contractors
• Plans and organizes workload and assignments of facility Maintenance Mechanics
• Maintains
and updates plant P& IDs, plant layout, and equipment drawings
• Oversees
work of outside contractors on site and completes contractor safety evaluations
• Manages
maintenance materials and critical spare parts
• Developed
and now maintain plant equipment specifications and plant assets files (electronic and hard
copies)
• Coordinates
t he installation and t iming of capital projects
• Maintains
p roject and equipment files for capital projects
• Creates,
revises and updates procedures and work instructions related to equipment repair, maintenance,
L OTO, t roubleshooting, etc.
• Controls
p rocess equipment archive files and data
• Implements
and maintains a Management of Change P rogram per 29 CFR 1910.119 Process Safety
M anagement of Highly Hazardous Chemicals
• Develops
and implements the Preventive Maintenance Program to meet OSHA’s PSM requirements
• Back-up
responsibility to the Plant Manager
• Provides
assistance to the maintenance department, including t roubleshooting, repair and problem-solving
Associate Technical Professional, Halliburton Energy Services–Williston, North Dakota ( Jan.
2012– Oct. 2012)
Production Enhancement Product Service Line
• Controlled entire f luid system for each job using basic engineering knowledge and chemistry
p rinciples
• Developed spreadsheet to t rack chemical usage to ensure proper recipe and decrease waste
• Performed real time adjustments to the operation as required to optimize results, meet
a lternative customer expectations, and respond to unanticipated well conditions or changes
d uring the operation
• Monitored and maintained I NSITE program, including well data and frac variables (i.e viscosity,
p roppant type, and f luid properties)
• Promoted safety awareness and environmental consciousness while complying with all applicable
safety and environmental procedures and regulations
• Proactively completed well site audits
• Prepared, organized, and verified all materials and equipment needed for job
• Managed frac team on location to efficiently complete multi-million dollar jobs
• Delivered pre-job quality control of stimulation f luids and end-of-job reports to the client
• Provided operational expertise to clients in a professional manner
T echnical T raining Program, Halliburton Energy Services– Brighton, Colorado (May 2012)
Production Enhancement 201
•Successfully completed technical course, expanding production enhancement skills as well as
health & safety knowledge
•Gained knowledge related to i mproving f luid properties, reducing friction in the well, and
t roubleshooting common problems
•Gained knowledge related to making jobs more cost effective
•Completed project on a well study and presented findings to local team of senior production
enhancement engineers