Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Tustin, CA
Salary:
45
Posted:
June 03, 2014

Contact this candidate

Resume:

Ammar Al Rubaye

**** ********, ******, ** *****

714-***-****

acee7s@r.postjobfree.com

No work permit is required

PROFILE

Thirteen years of Project Management in Construction, including cost estimating, on-site construction supervision and

management, scheduling and planning, cost controls, implementing and monitoring quality control & safety programs, site

experience in major civil engineering projects.Construction and maintenance of bridges, roads works and associated

services, including surface drainage, pump station, substations and utilities. Multi-span, multi-cell box girder bridges,void

bridge cast-in-situ reinforced concrete post-tensioned pre-stressed bridges. Pre-cast reinforced concrete pre-stressed, pre-

tensioned/post-tensioned 'I' girder and box girder with cast in situ slab bridges .

PROFESSIONAL EXPERIENCE

Jacobs International Holdings Inc. U.A.E July2009 to February 2014

Abu Dhabi: Internal Roads and Infrastructure in Southeast Mainland (MBZ II City) Various Sectors.

• Assistant Resident Engineer working with multi-discipline engineering team, have internal and external clients and

interact with other inter-company departments, responsible for the construction of internal roads and services to various

Residential/commercial plots in southeast (MBZ City), the work included storm water, drainage street lighting sewerage,

telephone, electric power and other relevant civil works.

Abu Dhabi: Miscellaneous Works (East-West) Abu Dhabi Island (Road Connection, Parking and

Infrastructure for Executed).

• Assistant Resident Engineer working with multi-discipline engineering team, have internal and external clients and

interact with other inter-company departments, responsible for all roads for Abu Dhabi Island which required construction of

parking areas, traffic developments and all other roads and infrastructure works.

Abu Dhabi: Execution of Bridges to Serve the Labor City inMafraq Area the Interchange for (F2)

Labor City at Abu Dhabi –Al Ain Truck Road.

• Bridge Engineer wording technical specifications related to reinforced concrete foundations, steel structures, soil

investigations, roads and site development; evaluation and analysis of bid results the project consisted of construction of

bridges Type Void, two span, post tension,crossing Abu Dhabi Al Ain Track road, dual carriageway, two roundabout, 4

number of slips roads, acceleration and deceleration lanes on existing truck road and associated civil works.

Abu Dhabi: Maintenance and rehabilitation and Additional work for internal Roads and Bridges of

The Emirate of Abu Dhabi Mainland (North).

• Assistant Resident Engineer responsible for all Bridges and internal roads for Abu Dhabi North area which require

maintenance, construction of parking areas, traffic developments and all other roads and bridges works.

• In all above projects duties included the following:

Managed inspection staff, Planning and scheduling abilities, prepared corresponding letters, minutes of meeting. Liaise

with all concerned private and governmental departments, reviewing methods statement, design notes, shop drawings

and as built drawings, supervising the work to ensure works are done in accordance with Abu Dhabi Municipality

specifications and prepared technical reports.

CH2MHill, HalcrowInternational. UAE July 2007 to July

2009

Abu Dhabi: Shahama- Saadiyat Freeway. (AldarYas Island), Freeways, Roads and Bridges.

• Bridge Engineer responsible for all structural elements and highways of 16 Mile-long, twin, 5-lane, motorway grade,

and highway extensions across a series of islands approaching Abu Dhabi.Structural works included 12 road bridges, 4

vehicle underpasses, 6 river bridge crossings, LRT bridge, box culverts and other associated structural works.Bridges

werea mix of post tensioned concrete, pre-tensioned beam and slab and standard reinforced concrete. Main bridges are

multi-celled box girder with clear spans up to 245 Feet and overall spans of 490 Feet. The main area of highway

consisted of varied kinds of soil and mangrove area in which the georgic was used.

• Duties include managing and organizing inspection staff, planning and scheduling abilities, budget preparation and

management, supervising the works to ensure works are constructed in accordance with the contract documents,

Preparing minutes of meeting and correspondence letters, liaise with t hedesign office and reviewing method statements,

shop drawings, design notes as built drawings and requests for information.

CansultMaunsell / Aecom Consultant December 2006 to July 2007

Dubai: Truck Tunnel (Dubai International Financial Centre, (DIFC).

• Structural site engineer for 1.5 Mile trucks and services tunnel over two floors, 1st floor with hollow core and cast in

situ slab used for trucks, 2nd with pre-tensioned beams and cast in situ slab used for utilities. Some large spans used

post- tensioned,andin situ concrete.

• Duties included managing the inspector’s staff, supervise all activities, piling, roofs, walls, slabs, post tensioning,

grouting, electrical and finishing works, reviewed shop drawings, method statement, confirmed the works as specified,

checked design notes, responded for information and coordinated with design team.

Parsons / De Leuw Cather Overseas Ltd. Transportation Group June 2004 to December 2006

Dubai: R800/2 Ras AL Khor crossing.

• Site Engineer/Inspector responsible for all structural work on site. The project included 12 box girder bridge (one unit

max span 210 Feet), post tensioned 2 underpasses 0.5 Mile and 2 pedestrian bridges.

• Duties included:Reviewed shop drawings, method statement and as built drawings, supervise all activities, piling,

substructures, post tensioned, grouting, decorative concrete works, electrical and finishing works.

Parsons / De Leuw Cather Overseas Ltd. Transportation Group.

Dubai: Interchange (5) Sheikh ZayedRoad,UAE Dubai Emirates Hills.

• Site Engineer/Inspector:Working in the construction of major interchange with 18 bridges, RCC box girder post

tensioned and retaining walls with extensive ramps and expansion joints.

• Duties included: Reviewed shop drawings, method statement and as built drawings. Supervised all activities,

piling, substructures,superstructures, post tensioned, grouting, decorative concrete works, electrical and finishing

works.

Parsons International, Iraq, Baghdad,

Iraq: BHE, Buildings Health and Education

• Field Engineer for building primary healthcare centre/Baghdad, work included reviewing contractor technical

submittals.

• Duties included:Reviewed drawings, coordinated with contractor engineers asneeded, ensured reviewed drawings are

available to all parties, coordinated with Contract Supervisors to assured the required technical submittals are obtained

from contractors. Participated in final inspection and prepared “punch lists”. Participated in the preparation of technical

features of field change requests and change orders. Supervised quantity take-offs. Monitored contractor inspection

program and quality control program, reviewed and monitored contractor as-built drawings. Prepared daily reports to

the project manager, reviewed all construction material testing, and evaluated testing results. Implemented zero accident

philosophy, ensured the project ES & H policy, and approved contractors safety plans are complied with.

Al FORAT General Construction Company. May 2002 to October 2004

Iraq, Baghdad _ Babylon high way, Rehabilitation, widening and maintenance

• Site Engineer, workedon the construction of 17 Mile main road and 7 Mile internal roads. Works included dual

carriageway of two layers asphalt, electric work protection of many existing services, project included ‘4’ roundabouts

and all other related work.

• Basra Airport Road (Rehabilitation and Maintenance).

• Iraq, Baghdad: Internal roads in UR City

• Site Engineer responsible for the construction of the internal roads and all utility works including pedestrian

underpasses and pedestrian bridges.

• Duties included: Supervision of the design works for the roads works. Supervision of the road works at site. Prepared

the program of works for roads projects and all necessary shop drawings.

• Jordan, Amman Sales Engineer, Al-Ashab Trading Company.

October 2000 to May 2002

• Sales Engineer in Baghdad office. Work included identifying, evaluating, and recommending

prospective new work in Iraqi market, developed strategy and directed the preparation of

proposals and presentations to win new business. Coordinated with main office in formulating

strategy and participated in proposal preparation and negotiations with customer to ensure

company objectives are met. Established and maintained customer relationships. Maintained

continuing professional contacts with customer and industry personnel.

CITIZENSHIP STATUS

US Permanent Resident

EDUCATION

BSc

Baghdad, 1999.

Civil Engineering/University of Technology

Post Graduate,

Baghdad, 2000.

Roads and Bridges Engineering

PMP(Cambridge Institute) Dubai 2013

PROFESSIONAL DEVELOPMENT

Technology skills: AUTO CAD, MICROSOFT OFFICE, SAAD III, SAP and PROKON.

Languages: Arabic and English



Contact this candidate