Robert Bostick
Independence Blvd.
Charlotte,N.C. 28205
Phone-704-
E-mail -
acedsi@r.postjobfree.com
****- ******* ***/**** ********
Charlotte,N.C. 1-Assist press operators
2- Stacker : stack all inserts on
pallets
3- Insert operator when needed
2012-2013 Con-star International ( Plastic Bottles
)
Charlotte,N.C. Material Handler
1- Check all stock in warehouse
2- Stock all machines with
preforms and labels
3-Re leave all operators on
machines for all breaks
4- RF-scan all inventory
5- Empty all trash and gay-lords
2011-2012
Charlotte,N.C.
Custom Polymers (Plastic-
Recycle)
Recondition tech.
1- Prep all plastic tubes
2- Place tubes on re-winder to
remove old film
3- Use cleaning solution to remove
excess glue
4- Place tube in box for shipping
2008-2010 Trim Systems (Truck Headliners)
States ville,N.C. Water Jet Operator
1- Check order sheet for part type
2-find setting in program
manual,Set in computer
start robot.
3-Take part hot glue pre hole base
board to headliner
to screw mount speaker parts
4- Pack/label part for shipping
2007 -2008 Flex/Sol (Plastic Bags)
Statesville,N.C.
Winder Operator
1-Assist blower operator threading
winder machine
2-Set-up my area for orders
3-Start machine up,Pull my rolls
off winder,stack on
pallets,label for shipping.
93- 2003 Accuma Corp. (Plastic)
Statesville,N.C.
Injection Molding Machine Operator
Mold Change Tech
1- Start up machine
2- Check parts for quality
3- Keep up with all production
sheets
4- Inform supervisor of any
problems,Make adjustment ifneeded
5- Pack parts on pallet for
shipping
Mold change tech.
1- Check with operator to see when
orders done
2- Clamp mold shut,kill power
3- Shut off all pumps,water,valves
4- Place eye in top of molds,Go get
overhead crane
5- Lower chains,Pull up slack.
Loosen all clamps
6- start pump,open mold,Move crane
right and left a few times
till ring breaks lose
7- Pull mold free and up/out, Now
ready for next mold
Dream Job
During my six years in the navy I worked in the
main engine room.
My job was to operate every pump/valve in the
engine room and I did
School and on the job training.
1- I had two pump I had to do (PMS) maintenance 60/90
days
500GPM-1200GPM
2- I worked and fixed gate/ globe/butterfly/check
valves
3- ran our first valve shop. Fix/sand blast
recondition and store all valve
for reuse
4-Pumps-remove pump housing,remove bearings,check
shaft,impeller blades
replace gasket reassemble pump,Test pump for
pressure,Put back in operation
Education
John F. Kennedy H.S. Bronx, New York
N.Y.
Pulson Plastic class Accuma Corp.
Valve/Pump-Repair/Maintenance School U.S.Navy