STUART ROBINETTE
EMAIL: acebzj@r.postjobfree.com PHONE: 678-***-****
**** ******* *****, *******, ** 30075
PROFILE
Experienced manager with project management skills in selling, estimating, and managing construction
projects. Background in commercial and military new construction and renovations. Ability to competitively
price and complete projects on schedule and within budget.
EXPERIENCE
Caddell Construction, Montgomery, AL March 2011 – Present
Quality Control Manager
• Manage submittals for each scope of work through approval process to meet all scheduled start dates
for projects, including Renovation of Building 75/2762 and BT Barracks Phase II
• Review and approve submittals, prepare activity hazard analysis for each scope of work with the
subcontractor’s assistance and hold the required preparatory, initial and follow up inspections for each
scope of work as required by the Corp of Engineers
• Create and manage the punch list process through completion
• Input required information and subcontractor’s daily reports into the QCS/RMS system to manage
projects and million dollar budgets
IL Fleming, Inc, Marietta, GA March 2009 – February 2011
General Manager
• Hired and coordinated the staffing on all of the design build Federal Projects, including an Armed
Forces Chaplaincy Center, which is a 2 Story Office Building with Auditorium
• Coordinated between partners and Corp of Engineers to ensure the design met the request for
proposal
• Managed weekly status meetings with partners to discuss progress on the projects
• Coordinated the timeliness and accuracy of each pay application
• Oversaw the RFP process with the designers and project managers to ensure inclusion of all costs
and associated time
Quality Control Manager
• Reviewed and approved all submittals, wrote and tracked all the required RFI’s, and prepared the
activity hazard analysis for each scope of work with the subcontractor’s assistance
• Hosted required preparatory, initial, and follow up inspections for each scope of work as required by
the Corp of Engineers
• Prepared and submitted the O & M Manuals and as builts
United Forming, Inc, Austell, GA August 2007 – October 2008
Project Manager
• Specialized in complete concrete portion of elevated slab projects, including supplying formwork,
reinforcing steel, concrete, all layout, excavation of the foundations, installation of the reinforcing steel,
placement and finishing of the concrete
Maintained labor reports weekly for each project, including a 6 story hospital addition, and a 13 story
•
hospital
Monitored the schedule to ensure that all completion dates were achieved
•
Performed cost analysis monthly for each project, input the results into CMIC, performed the buy out
•
for each project, and managed all vendors and subcontractors
Total Concrete Structures, Atlanta, GA November 2005 – July 2007
Project Manager
• Built the complete concrete portion of high rise buildings, including a 22 story (San Marco Place) and
35 story (The Vue) condominium, which were constructed with tunnel forms at a rate of one week per
floor on San Marco Place, and one and a half weeks per floor on The Vue
• Attended all scheduled meetings to ensure client satisfaction with the tunnel form cycle schedule
• Performed a weekly punch list review with the client to ensure the crew was completing punch items
in the required timeframe on each project, and documented all issues
Foundation Contractors, Inc, Kennesaw, GA January 2005 – October 2005
Project Manager
• Specialized in building tilt up warehouses throughout the southeastern United States for Home Depot,
including all concrete components of the projects
• Performed buy out for each tilt up project
• Estimated and submitted change order requests to the general contractor on all projects
• Managed extremely aggressive schedule and coordinated the delivery of materials on time without
any pieces missing or fabricated incorrectly
Hogan Construction Group, Norcross, GA April 2003 – December 2004
Project Manager
• Coordinated complex interior renovations, including a lobby renovation for the Atlanta Financial
Center, an interior renovation for Genuine Auto Parts, and renovations to various YMCA pools
throughout Metro Atlanta
• Communicated with clients and subcontractors weekly to ensure all scheduled completion dates were
met
• Ensured all material was delivered within the parameters of the schedule
• Assisted the estimating department during the selection of subcontractors before the bid, taking bids,
and working closely with them after each project was awarded
Winter Construction Company, Atlanta, GA October 2000 – March 2003
Project Manager
• Managed interior renovation projects, including Two Peachtree, Southern Telecom, Sprint POP
Addition, and Sprint Switch Chiller Upgrade
• Coordinated a four month schedule per floor during the Two Peachtree renovation and ensured all
material was delivered within the parameters of the schedule
Assisted the estimating department on numerous occasions on bid day, worked closely with the
•
estimating department after projects were awarded, and turned projects over to operations
department
EDUCATION
Florida International University
Bachelor of Science in Construction Management
CERTIFICATION
Certified Quality Control Manager for Projects with the Corps of Engineers
OSHA 30
CPR/First Aid