MEZR MURAD
Current Address: **** **** **** **., *******, TX, 75042, USA
Tel: 214-***-****
E-mail: aceane@r.postjobfree.com
OBJECTIVE:
I have 10 years of experience as a civil
engineer in planning, designing, bidding and implementation
of civil plans in construction of buildings, Roads,
hydraulic structures, solid waste transfer stations, waste
water treatment plants, concrete paving, security projects
and etc. Also 8 years of international and local sales and
financial management, customer services. Seeking a position
to enhance my skills and develop with the organization.
SUMMERY:
I am a hard-working man and work in a smart way
at the same time. I have a long and various experiences.
And this always enable me to make successful plans and
reach my goals with less expenses and efforts, that failure
is not in my not my dictionary at all. On the other hand, I
am so friendly and co-operative when I work as a team.
Also, I am very serious in my performance and I consider
the time so much. Sometimes I can briefly describe myself
in the work in few words " I have an engineer's brain, a
soldier's strength and a patience of monk".
WORK AL-SAFA COMPANY constructions and contracts MOSUL, NINEVEH,
IRAQ
EXPERIENCE Site Engineer June 1, 2000- Oct. 31, 2002
Duties and responsibilities:
. Studying each project at the onset and draft an outline
of items which may need attention
. One of my first duties was studying the work plan
submitted by the contactor and suggesting any
modifications to the supervisor Engineer.
. Supervising the works on site in accordance with the
contract requirements and using the template and
procedure established by government.
. Supervising the works in accordance with the drawings,
technical specifications and bills of quantities
. Ensuring the correct implementation of the works
according to technical specifications, to designs and
quality of materials
. Preparing list of materials for which the procedures for
acceptance will be done
. Preparing list of tests that may be required and
following these tests to be carried out and approved.
. Checking and testing of completed works before a
contractor covers them.
. Checking and ensuring that the site is arranged as per
the site management plan and that all measures are taken
for site safety and the safety of the third parties in
the vicinity of the site.
. Ensuring that health and safety measures are adopted and
followed to the full extent and prepare weekly report.
. Suggesting and instructing additional safety measures if
needed.
. Studying and verifying quantities of works done and
provide a report to contractor.
. Providing an assessment of any variation to contractor
for approval
. Assist in the preparation of provisional acceptance and
snag list.
. Maintain a filing system for all site memos and
instructions, measured quantities of work and materials
on site, reports and other documents and correspondence
pertaining to the construction activities
. Coordinating the site meetings with the Contractor.
AL-MAHER GROUP constructions and trading MOSUL,
NINEVEH, IRAQ
Projects Manager Nov. 15, 2002- Aug. 31, 2005
http://www.almaher-iraq.com
Duties and responsibilities:
. Managing the tasks is performed to the fullest of the
efficiency.
. Planning out an organizational structure to bring out
ease and flow in the tasks.
. Suggesting new policies and modifications in order to
reform the nature of work.
. Developing good relations with my colleagues and
motivate them to do well by appreciating their good
performances.
. Participating in meetings, discussions, project site
visits, workshops and hearings.
. Preparing bids and proposals for the prospective clients
to expand business operations.
. Provide full information to the accounts departments and
auditors and assist them in case of difficulty.
. Determining the resources required for the purpose of
production.
. Preparing status reports and presenting them to the
higher managing authorities for scrutinizing.
. Delivering the performance with better success rates.
. Keeping in touch with the clients who have assigned the
project to my company and make them aware of the status
of the work finished.
. Leading my team and bring out the best in them.
. Responsible for developing a good dialog and
communication with the team member for the success of
the project.
. Estimating activities of project bids then perform the
job perfectly depend on the bid and perfect
specifications.
. Establishing easy communication between the employees
and the higher authority.
. Solving problems for my team members.
. Team building, which is defined by success.
. Accomplishing project objectives and the outcome
(success) of the projects.
ALBASHIQ GROUP constructions and trading
MOSUL, NINEVEH, IRAQ
Projects Manager Apr. 15, 2006- Sep. 10, 2011
http://www.albashiqbird.com
Duties and responsibilities:
. Estimating activities of project bids then performing
the job perfectly depend on the bid and perfect
specifications.
. Defining the projects objective and developing plans to
accomplish the objectives
. Work in order to define the specific objective of the
projects.
. Including members of the project team in the plan
development phase.
. Organizing function for involves identifying and
securing necessary resources, determining tasks that
must be completed, assigning the tasks, delegating
authority, and motivating team members to work together
on the project
. Determining what tasks must be completed.
. Motivating members of the project team to work together
in order to complete the goal.
. Tracking progress and comparing it with planned progress
. Solve problems and get the project back on track.
. Responsible for guiding employees in achieving the goals
and ambitions of the company.
. Ensuring that all processes and practices are working in
a proper manner.
. Discussing with other members of the top management and
devise any specific goals, which are to be accomplished
within a certain time period.
. Overseeing all processes and pay minute attention to
monthly or quarterly functioning of each individual
practices.
. Doing well experience and efficiency for handling the
operations of individual practices in a company.
. Training, guiding and assisting the newly hired process
employees, regarding handling daily processes and
employee performance.
. Conducting presentations to the higher management
pertaining to business, marketing, and advertising
strategies, and all other necessary aspects of the
company processes.
. Communicating with clients and attracting new projects
to the company for execution and finalization.
. Ensuring that every individual department is giving
their best possible outputs, and recommending and
devising any new policies that are likely to prove
beneficial to the goodwill of the company.
. Conducting quarterly, semiannual and yearly general
meetings for presenting the profits, gains and
achievements of the company.
FMH, ZRS AUTO SALES GARLAND, TX, USA
Sales Manager Dec. 10, 2011- May 2014
. Determining annual unit and gross-profit plans by
implementing marketing strategies and analyzing trends
and results.
. Establishing sales objectives by forecasting and
developing annual sales quotas for regions and
territories; projecting expected sales volume and profit
for existing and new products.
. Implementing sales programs by developing field sales
action plans.
. Maintaining sales volume, product mix, and selling price
by keeping current with supply and demand, changing
trends, economic indicators, and competitors.
. Establishing and adjusting selling prices by monitoring
car costs, competition, and supply and demand.
. Contributing to team efforts by accomplishing related
results as needed.
. Manage the international sales
. Collecting payments, follow with customers, customer
services.
PROJECTS &
SALES ACTIVITIE
I worked for more than 40 contracts with Iraqi Government,
IRD, USACE and US army as a Site Engineer / Consultant
engineer / Projects manager between the period 2000-2011.
SOME PROJECTS:
W917BE-06-C-0062 USACE/GRD Health Dept.-Eng.
Building Expansion 2006-2008
W917BE-06-C-0045 USACE/GRD Al Mahalabya Paved
Road 2006-2007
W917BE-06-C-0056 USACE/GRD Rabee'a paved
road 2006-2007
W917BE-06-C-0071 USACE/GRD Sewer lines
and breaks 2006-2007
W917BE-06-C-0043 USACE/GRD Sewer lines
in al-akhaa and al-zahraa 2006-2007
W917BE-06-P-0051 USACE/GRD Ninavah
valves hardning project 2006-2007
W917BE-07-C-0096 USACE/GRD Towers
project - phase 11 2007-2008
W917BE-08-C-0050 USACE/GRD Old Mosul
Courthouse Security Upgrade 2008-2009
W917BE-08-C-0094 USACE/GRD Pave road in
Kerfkeer -Brazey 2008-2009
W91GFB-08-M-2066 US ARMY Mechanics tools
2008
W917BE-08-C-0082 USACE/GRD Pave Roads in
Mihd Compound 2008-2009
W917BE-08-C-0076 USACE/GRD Al Rasheedya Road
paving 2008-2009
W917BE-08-C-0078 USACE/GRD Pave roads in
Serishka 2008-2009
MRC 09-98 US ARMY/MRC Dawassa sewer
line construction 2010
MRC 09-43 US ARMY/MRC Old Mosul
Courthouse / receive the old building
W917BE-09-Z-0002 USACE/GRD Porsche Road
Paving 2008-2009
W5K9ZM-11-X-0001 USACE/GRD Yarmook SWTS
2010-2011
I worked as a manger for Local and international sales
activities with FMH/ZRS Auto sales, during the period of
Dec. 2011 to May 2014, I was able to sell a huge number of
cars.
EDUCATION Mosul University
Mosul, Nineveh, Iraq US Equivalent,
Bachelor of Science in Irrigation & Drainage Engineering, Civil
Engineering,
June 29, 1997
Average mark is (65.08%)
Rank is 4th out of 16 students
Mosul University
Mosul, Nineveh, Iraq US Equivalent,
Master of Science in Irrigation & Drainage Engineering, Civil Engineering,
Nov. 20, 1999
Average mark is (82.25%)
Rank as very good degree
Collin College
Plano, TX, USA
Continues Education, ESL CLASSES
2011-2012
Passed for all calsses
Richland College
Richardson, TX, USA
Some credit classes to be qualify
for Texas engineering license 2014, Current study
RELEVANT Graduate Courses:
COURSES Mathematics Optimization
English Language 1
English Language 2
Artificial intelligence Pumps and wells
Advance irrigation 1
Advance irrigation 2 Advance drainage
Management of farm irrigation water
Undergraduate Courses:
Mathematics Engineering Mechanics
Engineering Drawing
Comp. Programming Engineering Geology
Engineering statistic Surveying
Fluid mechanic
Structural Dynamics
Soil science Soil reclamation
Strength of materials
Water quality and pollution Engineering Mathematics
Theory of structures
Soil mechanic Applied hydraulic
Princ. Of irrigation
Engineering hydrology Drainage engineering
Irrigation structures design
Irr.&drain. Network design Farm Irr. Systems
Dams engineering
Engineering Economics Specifications and
estimations Water resources engineering
Test of Materials & Buildings Concrete design
Princ. Of foundation structures
Evaluation and management of irrigation systems
SKILLS Operating Systems: Windows, Mac OS X
Software: Microsoft Office, AutoCAD, Photoshop, PDF
professional
Languages: Very Good in English, Fluent in Arabic.
ACTIVITIES & HONORS
. Iraqi union for Engineers Member 1998-present
. Iraqi businessmen center, 2003-present
. Kurdistan importers and exporters union 2009- present
. Traders union, Kurdistan 2009-present
PROFESSIONAL ACTIVITIES & AWARDS
. Certificate of Appreciation, USACE, GRD, GRN, 2007,
Contractor
. Certificate of Appreciation, USACE, GRD, GRN, 2008,
Contractor
. Certificate of Appreciation, US ARMY, 2010, Senior
Project Engineer
. Certificate of Appreciation, US ARMY, 2010, Project
Manager
. Certificate of Appreciation, USACE, GRD, GRN, 2011,
General Manager
PUBLICATIONS & WORKING PAPERS
. Mezr G. M. Murad, Dr. Nawal Jajo "Simulation model for
irrigation uniformity under center pivot sprinkler
irrigation systems " 1999.
11 Mezr G. M. Murad, Dr. Bahzad M. Ali "Hydraulic Design of Spillways"
1997.
CONFERENCE PRESENTATIONS
. Iraqi rivers and international law for water
distribution, Oct. 9, 1997, Mosul University, Iraq.
. Using center pivot irrigation systems, Mar. 18, 1998,
Mosul University, Iraq.
. Engineering management, principles and benefits, May 2,
1999, Mosul University, Iraq.
. Water harvesting in Iraq, Nov. 15, 2010, Mosul
University, Iraq.