Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Fontana, CA
Posted:
July 29, 2014

Contact this candidate

Resume:

Remon A. Habib, PE

**** ***** ******, ******* ** 92336

Tel: 908-***-****

Email: ace5l9@r.postjobfree.com

Objective:

Lead opportunity in bridge design, analysis, or construction support where I can utilize my

background and work on challenging assignments.

Education:

2001

Bachelor of Science, Civil and Environmental Engineering, Dean’s List Student

Rutgers School of Engineering, 1997-2001

2011

Master of Science, Civil Engineering

Rutgers Graduate School of New Brunswick, 2010-2011

Co-op:

Engineering Fellowship at the Port Authority of NY and NJ, 2000

Licensure:

Professional Engineer: NY, NJ

CA PE (Seismic exam passed, pending Surveying exam, Fall ’14)

Expertise:

• Outstanding technical and design background in the bridge and transportation industry.

• Excellent technical writing skills.

• Strong Task and People management experience.

• Sound knowledge in Structural Analysis.

• Solid design code interpretation (ASD/LRFD).

• Proficient in scheduling and document management technology.

Design Code Experience:

• AASHTO Standard Specifications, 17th edition.

• AASHTO LRFD Bridge Design Specifications, 6th edition 2012.

• ASCE 7-10 Minimum Design Loads for Buildings and Other Structures.

• AISC Steel Construction Manual, 13th edition.

• IBC International Building Code, 2009.

• PCI Design Handbook, 6th Edition.

Software and Technology:

• PRIMAVERA (P3) scheduling software.

• Document Control software (Bentley Projectwise, Autodesk Vault, Constructware, Sharepoint)

• Extensive Experience with MATHCAD and MATLAB in Engineering Applications.

• Structural Analysis Software (SEAISAB, ADINA, MDX, RC-PIER, CONSPAN, SAP 2000, GT

STRUDL, STAAD PRO, L-Pile, Virtis, CFS).

• Extensive drafting experience with Microstation(V8i) and AutoCAD.

Professional Engagement:

May 2012-April 2014

A Project Manager at IH Consulting Engineers, Princeton, NJ

• Project Manager on design delivery Programs and Construction support services.

Projects:

Page 1 of 3

Project manager leading IH Engineers’ design and construction support team as part of a

complex deck replacement project at Major Deegan Expressway Rehabilitation, NYSDOT,

design team led by AECOM NY.

Technical expert representing IH Engineers’ design team working on economical design of

a Shared Use Pathway (SUP) at the redesigned Bayonne Bridge – Raising of Main Span

Roadway and Approach Structures, PANYNJ. Design team led by HDR, NY.

Project Manager on Route 37 Rehabilitation – Mathis Bridge Redecking, NJDOT. Design

and specification lead working with Parsons Brinckerhoff NJ and Hardesty and Hanover

NY to prepare design package for movable bridge and approaches at Mathis Bridge over

Barnegat Bay.

General Roles:

Evaluate engineering and drafting staffing needs.

Develop staff through training and leadership during the course of a project.

April 2004-September 2011

A Principal Engineer at Ammann &Whitney, New York, NY

Project: Reconstruction of Claremont Ave Bridge over Metro North Railroad – NYC DOT

Position: Project Manager

Tasks:

• Project Lead and Client point of Contact on all construction support issues.

• Lead project staff during Shop drawing review and RFI response process.

• Attended monthly progress meetings with Contractor and Client

Project: Painting Steel Repairs and Suspender Rope Replacement at Throgs Neck Bridge

Estimated Construction Cost: $80M

Position: Project Engineer

Tasks:

• Developed a nonlinear finite element model (ADINA) to obtain current and jacking forces during rope

replacement operations.

• Developed steel repair designs for deteriorated stringers, floorbeams, and bracing members.

• Performed numerous load rating assignments to assess current Bridge capacity as well as due to an additional

lane of traffic.

Project: Widening of the Bronx Plaza Spans at Triborough Bridge

Estimated construction cost: $450M

Position: Project Engineer

Tasks:

• Attended progress meetings.

• Developed complex geometry calculations using multiple baselines and developed camber and haunch tables

for a large number of steel members.

• Carried out LFD design calculations for tangent and curved stringers (MDX design software) as well as

develop and detail superstructure drawings.

• Designed and detailed superstructure slab, armored expansion joints and approach slabs.

• Performed seismic evaluation calculations of existing and proposed piers using SEISAB.

• Performed LFD design calculations of concrete piers using RC-PIER.

• Carried out several design calculations for bridge bearings.

• Contributed to specification writing on the project.

Project: Widening of Ward’s Island Viaduct at Triborough Bridge (DESIGN and CSS)

Estimated Construction Cost: $250M

Position: Project Engineer

Tasks:

• Attended monthly progress meetings with client, contractor, and resident staff.

• Contributed to RFI and NCR resolutions

• Reviewed steel shop-drawings (stringers, girders, floorbeams, brackets)

• Reviewed precast concrete panel shop-drawings.

• Reviewed concrete mix designs and materials submitted by contractor.

Page 2 of 3

• Designed and detailed superstructure slab, stringers, and floorbeams.

• Designed and detailed bridge bearings.

• Reviewed concrete pier designs

• Developed geometry calculations and tables.

• Carried out Load Rating assignments.

Project: New Britain – Hartford Bus-way Bridges and Retaining Walls, Connecticut DOT

Estimated Construction Cost: $140M

Position: Senior Designer

Tasks:

• Prepared LRFD design of eleven retaining walls structures along Bus-way.

• Developed structural details for retaining walls.

• Performed design checks for superstructure design of Trout Brook Bridge and New Britain Bridge over New

Britain-Hartford Busway.

Project: Structural Assessment for Tydings Memorial Bridge and Hatem Bridge, Maryland Transportation

Authority

Independent Assessment

Position: Senior Designer

Tasks:

• Developed linear models of various bridge structures to obtain controlling stresses of several construction

stages during a deck replacement project.

• Analyzed and improved construction sequence to reduce stresses during construction on vulnerable members.

• Prepared technical reports summarizing findings, repair recommendations.

March 2002-April 2004

Bridge Engineer at Weidlinger Associates, New York, NY

Experience:

• Performed ASD design Calculations and specifications preparation for Verrazano Narrows Bridge Drainage

Modification.

• Performed ASD/LFD design calculations for dehumidification steel enclosure and developed re-anchoring

details for corroded cable strands at the RFK (Triborough) Bridge.

• Carried out design calculations and prepared design details for superstructure replacement of Replacement of

65th Place Bridge over BQE.

• Executed an In-depth inspection for fascia girders and end diaphragms at Tappan Zee Bridge. And developed

repair details.

MAY 2001 – March 2002

Entry Level Staff Engineer at F.R. Harris, Iselin, NJ

Experience:

• Carried out preliminary seismic calculations and GTSTRUDL modeling for retrofit assessment of ROUTE

139 viaduct (NJDOT)

• Conducted Shop drawing review for several highway bridges for NJDOT projects.

• Performed several quantity take-off calculations and engineer’s estimates.

Page 3 of 3



Contact this candidate