Post Job Free

Resume

Sign in

Engineer Customer Service

Location:
United States
Posted:
July 28, 2014

Contact this candidate

Resume:

Jeffrey A. Montgomery

*** ********* ******* *****

Lexington, KY 40511

937-***-****

QUALIFICATIONS:

Lean Six Sigma Green Belt

AS9100 Internal Auditor

IPC-A-610 CIS

Tier 1 Supplier Representative

ISO-9001 Internal Auditor

Lean Manufacturing

QS Knowledgeable

Microsoft Excel

Microsoft Word

Microsoft Power Point

Optical comparator

Cordax

Micrometers

Calipers

Blue print reading / GD&T

Side Loader

Fork lift

Teach and motivate

Ability to learn fast

Customer Service

Organizational, detail oriented

Team leader

Team player

Problem solving skills

Problem analysis

Trouble shooting

Management & Supervisory skills

EDUCATION:

Master of Divinity, 1991, Asbury Theological Seminary, Wilmore, KY

Bachelor of Arts, 1987, Malone University, Canton, OH

Diploma, 1983, Ridgedale High School, Morral, OH

LICENSES & CERTIFICATES:

Lean Six Sigma Green Belt

IPC-A-610 CIS

AS9100 Certified Internal Auditor

ISO 9001, 2000 Certified Internal Auditor

Certified Visual Weld Inspector

Basic, Advanced, and Short Run SPC

Five Principles of Problem Solving

Total Quality Management

Total Quality Advantage for Management

Quality Circle Facilitator

Pastoral License

EMPLOYMENT:

Global Sustained Quality (PeopleLink), Georgetown, KY August 2012 to present

*Quality Senior Inspector

1. Work TMMK RI to determine what sorts need to be done, started or continued.

2. Write up work instructions for sort.

3. Confirm sort is correctly done through audits.

4. Help RI to identify root cause.

5. Correlate hours and all necessary information to communicate with first shift

6. Make sure hours to job are correct.

Ceradyne, Inc.; a 3M company, Lexington, KY November 2011 to June 2014

* Quality Engineer/Manager

1. Involved with daily production meetings.

2. Knowledge of all quality tools and requirements.

3. Helped start a Problem Solving Team.

4. Approved sales orders as needed.

5. Helped determine root cause and corrective actions for in house issues as well as customer complaints.

6. In charge of ISO 9001:2008 systems as Management Representative.

7. Conducted ISO 9001:2008 Internal Audits and Production Process audits as required.

8. Helped to coordinate inspection of product between two facilities.

L-3 Communication, Fuzing and Ordnance, Cincinnati, OH August 2008 to April 2011

• Quality Engineer

1. Responsible for monthly quality paperwork to accompany product shipments - dealt directly with customer as needed.

2. Involved with weekly program team meetings

3. Knowledge of all quality tools and requirements

4. Used control plans to improve process

5. Confirm product ready for customer inspection.

6. Worked with other QE’s on other projects.

7. Coordinated team together to discuss quality issues.

8. Worked with design teams on new projects.

9. Conducted AS9100 Internal Audits as required.

10. Work on ESD team to help reduce risks to product.

DRS Mobile Environmental Services, Cincinnati, OH July 2007- March 2008

• Quality Engineer / Project Engineer

1. Responsible for confirming on time on projects - dealt directly with customer on Integrated Master Schedule.

2. Held and involved with weekly project meetings

3. Knowledge of all quality tools and requirements

4. Used control plans to improve process

5. Confirm product ready for customer inspection.

6. Liaison between customer and design engineer.

7. Responsible for shelter program.

8. Work with customer to understand quality requirements

9. Backed up Quality Inspectors as needed.

10. Worked with other QE’s on other projects.

Millennium Metals Inc., Franklin, OH September 2006- July 2007

• Quality Control Manager

1. Rewrote Quality Manual.

2. Set up Supplier Improvement Plan.

3. Began ISO compliance program.

4. Learn all the plants jobs in order to help write the manual.

Stanley Electric U.S. Co., Inc., London, OH, June 1999-February 2006

• Quality Control Staff / Project Engineer

1. Drop manufactured bulb cost by 22%

2. Approved new Suppliers that reduced costs and down time on equipment

3. Headed project team that reduced mold change time average from 1 hours to 20 minutes.

4. Headed up 4 other project teams that were able to reduce costs or help improve product or assembly time.

5. Created many GO/NO GO gauges for supplier as well as in house product that reduced assembly down time.

6. Implemented SPC for over 40 plastic mold machines for over 200 parts.

7. Implemented Quality Standard for parts so all shifts were exactly aware of each quality standard.

8. Implement part fit checks to avoid assembly down time.

9. Implemented Lean manufacturing, 3 days of stock to day stock.

10. Maintained Integrated Master Schedule for parts and all parties concerned.

TMX Copper and Brass Sales, Dayton, Ohio September 1995-February 1999

• Quality Control/Assurance Manager; Cut Metal Coordinator; Shipping; Sales

1. Set up Quality program to reduce rejects, did not have any for over three months (prior record was eight days).

2. During same period: order count went up, pounds of metal shipped went up and scrap was reduced.

3. Set up in house gauge check program.

4. Trained all in house for ISO audit and trained others at other branches.

5. During ISO certification, had no non-conformities



Contact this candidate