Post Job Free

Resume

Sign in

Mechanical Project Manager

Location:
Marblehead, MA
Posted:
July 22, 2014

Contact this candidate

Resume:

Daniel G. Swanson

ace2e7@r.postjobfree.com

** ******** ***

Marblehead, MA 01945

(781) 405 – 4144

Professional Summary:

Talented professional with experience in mechanical design, project coordination, and BIM in the construction

industry. At this time I am looking for work in the Boston, MA area to move closer to family.

Education:

• The University of Mississippi

o Bachelors of Science in Mechanical Engineering

Experience:

1. Kraemer Design Services May 12’ – Present

a. BIM Project Manager May 13’ – Present

• Regulate and manage the completion of the 3D model for the D1X fab base build and progressive build

projects at Intel’s Ronler Acres campus in Hillsboro, OR. Responsibilities include: CAD standards

enforcement, clash resolution and adjudication, RFI management, space reservation, and ensuring the

coordination between the A/E and the GC.

b. Project Coordinator May 13’ – Present

• Manage and coordinate special projects at the Intel Ronler Acres campus in Hillsboro, OR from conception

to completion. Responsibilities include: Scope development, writing and submitting proposals, cost

estimation, sub-contractor management and coordination, submittal review, RFI response, scheduling, and

customer interface.

c. Mechanical Designer May 13’ – Present

• Produce mechanical designs for special projects at Intel’s Ronler Acres campus in Hillsboro, OR.

• Support mechanical design for tool install and base build projects at Intel’s Chandler and Ocotillo, AZ

campus’.

• Produced SLRP report including a 2 and 5 year look ahead for the mechanical facilities for CH4 at Intel’s

Chandler, AZ campus to be used for a facilities upgrades, and cost analysis.

• Areas of experience include; process gas systems, process water systems, process vacuum systems, bulk

chemical delivery, waste systems, process exhaust systems, HVAC, residential water systems, and energy

conservation pertaining to heat recovery and free cooling.

d. Intel Chandler Campus - CH1 Database Update Jan 13’ – May 13’

• Updated the CH1 PFD’s and plan views utilizing laser scanning technology for field verification, and as-

built models for quality control.

• Developed process flow diagrams for all mechanical and process systems within the scope of the project

based upon the updated plan view drawings, existing base build packages, location specific design packages,

and field verifications.

e. Team Lead - F22 3D as-built model. May 12’ – Jan 13’

• Managed a 6 person production team.

• Coordinated, and compiled all team member work into weekly deliverables utilizing Leica Cyclone,

AutoCAD, and Navisworks.

• Throughout the production process, using the concept of continuous improvement and lean thinking,

developed and implemented internal procedures for quality control and efficiency.

• Developed the procedure for bay to bay coordination and alignment during the final QA effort.

2. HSA Engineers and Scientists May 11’ – Aug 11’

a. Structural Intern.

• Assisted Professional Engineers with structural evaluations on both commercial and residential

properties. Responsibilities included mapping each structure, documenting damage, performing floor

level surveys, and compiling reports.

Skills:

• Computer programs: • Professional Skills:

o Microsoft Office o Team leadership

o Pipe Flo o Customer Interface

o AutoCAD o Mechanical drafting

o Navisworks o Proposal writing

o Leica Cyclone o Cost estimation

o PTC Creo Elements o Project Coordination

o Pro/E Wildfire o Semiconductor process systems

o Pro/MECHANICA o Lean principles knowledge

o Six sigma knowledge

References:

• References provided upon request.



Contact this candidate