Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Rock Springs, WY, 82901
Posted:
April 15, 2014

Contact this candidate

Resume:

Kyle C. Da Rif **** Clyman Dr.; Rock Springs, WY *2901

307-***-****; acdo8n@r.postjobfree.com

Objective

Full time employment as an Electrical Engineer, preferably with focus toward software or hardware

systems development or maintenance. Willing to travel or relocate for employment.

Education

BS in Electrical Engineering; graduated December 2013

University of Wyoming, Laramie, WY

Passed Fundamentals of Engineering exam; October 2013

Skills

Experience building desktop computers

Troubleshoot computer problems that consist of both hardware and software issues

Coding experience in C++, C#, Verilog, Assembly, and MATLAB

Strong understanding of Microsoft based programs including Excel, Word, PowerPoint

Knowledge of Control Systems Theory, Transmission Lines, 3-Phase power systems, and Motors

Ability to construct electronic systems utilizing more basic components such as resistors, diodes,

and amplifiers

Know how to utilize testing equipment including Oscilloscopes, Logic Analyzers, Multimeters, and

LABview

Strong Math aptitude

Engineering Project:

Senior Design: Sept 2012 – Apr 2013

• Designed a Frequency Dependent Audio Visualizer. A Frequency Dependent Audio Visualizer

receives an input audio signal, filters the frequency information of the signal into a set number of

bands. The frequency information is separated into these bands, by analog filters. These bands

were associated with octave frequencies to easily separate the audio signal between low and high

frequencies. The filtered frequency information is then output to LED arrays for each band. The

LEDs in each array will then light up whenever the input signal contains frequency information

that falls within the bandwidth of the filter that the array is attached to.

Engineering Shadowing Experience:

FMC Project and Maintenance Engineers, FMC Corporation, Green River, WY: June 2013

• Shadowed the Project Engineers to establish how they developed new projects and how they

managed dealings with the workers that would be using their projects

• Shadowed the Maintenance Engineers observing locations relevant to my technical background.

During this time I observed techniques for managing repairs/replacement of broken equipment, the

steps to follow when replacing equipment and general interaction with workers in the field.

OCI Engineers, OCI Wyoming, Green River, WY: August 2010

• Followed Engineers through general areas of the surface mining area to view how they

conducted their daily work

Previous Employment:

OCI Surface Summer Hire, OCI Wyoming, Green River, WY: Summer 2010

General cleanup around the plant including operation of mobile equipment, painting, manual labor,

and cleaning of bag houses around the plant. Additional sanitation assignment included the upkeep

of change-houses and engineering facility. Gained experience with the following equipment:

Super-Sucker, Water Truck, and Skid loader.

References:

Available if needed



Contact this candidate