Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Seville, AL, Spain
Posted:
April 03, 2014

Contact this candidate

Resume:

Personal information

First name / Surname: Date of birth:

Gender:

Nationality:

Status: Address: Mobil: E-mail: Skype:

Work Experience

Sergio GUZMÁN RUIZ August 3rd, 1970

Male

Spanish

Married, 3 children

C/Manuel Casana, no 15, 5o C, 41005, Seville, Spain +34-609-***-***

acdho4@r.postjobfree.com

fguzmanpuerto

Curriculum Vitae

11-2009 – present Unemployed. Main activities:

• Improvement of English language. Learning of German language.

• 02-2014 – present. Training in quality assurance. Meupe (Seville- Spain). Construction and

equipment for R&D center of new cutting processes.

08-2009 – 11-2012 Project Coordinator at Abeima – Abengoa.

• BVA Project (Befesa Sulfur Recovery). Plant production of sulfuric acid. Project "turnkey"

amounting to 73M €. Steam turbine 45 bar. Power at generator terminals: 11500 kW at 6 kV.

• Technical coordination of the scope of the technologist (Ballestra) with the engineering

(Idom): amount of reach: 37M €. Language regular communication: English.

• Questioner integrative engineering (Idom).

• Support procurement phase.

• Monitoring and mechanical activation area and architectural supplies.

• Technical assistance under Construction and Commissioning.

• Tracking auctions and guarantee points.

• Support for legalization of Plant and Project Manager.

• Prompt support work HSA.

• Achievement(1):Replacing the concrete foundation slab of asphalt layer with antacid arid

(bassalt), assumed an economic saving of half a million euros.

• Achievement(2): Legalization of the turbine. The lack of this management caused daily

losses of 200,000 euros. Finally I was assigned to this task and was met with success.

08-2008 – 08-2009 Project Engineer at Befesa Agua- Abengoa.

• Structural design engineer. Department of civil engineering: calculation of concrete

structures and metal.

• Air conditioning and ventilation calculations (HVAC).

• Project coordination of water treatment plants; Management of engineering projects

(Retortillo, Raven Rock, Vargas, Cenajo ETAP).

• Achievement: Implantation of ventilation system instead of air conditioning for cooling of

electrical equipment. Represented a saving of 90% of investment and 80% in operation.

02-2007 – 08-2008 Structure Superintendent at Dragados Offshore.

• Adriatic LNG Project. 60 M€. For Exxon Mobile (EEUU). Main contractor; Aker Kvaerner

(Norway).

• Brief description; The structure is equipped with berthing and mooring systems forunloading LNG and can accommodate LNG carrier vessels with capacities up to 152,000m3 of LNG. The terminal receives only two or three tankers a week and transfers LNG into the two special tanks. The platform then regasifies the LNG as a controlled process. Utility systems such as power generators (4 gas turbines) and 8,000t of process equipment for LNG regasification.

• Management of teams for the construction of a reinforced concrete offshore platform. Weekly meetings attendance with suppliers. Weekly meetings attendance with the customer. Outsourced work monitoring.

• Mechanical Completion. Documental completion of all systems. Check records and punch list of all disciplines, which are mechanical equipment, structure, electrical, instrumentation and piping.

• Achievement: Changing the welding process using magnetic bases for the supports of the portable gas extraction nozzles. It was a time saving of 60% and an increase in efficiency up to 90%.

12-2005 – 02-2007 Project Inspector at Bureau Veritas.

• Inspection of building structures and facilities.

• Reports of structural stability. Technical assistance work.

07-2004– 12-2005 Project coordinator at Planho Consulting.

• Design of air conditioning systems in buildings.

• Facilities of medium and low voltage, RBT (Spanish regulations) and NEC (National

Electrical Code).

03-2003 – 06-2004 Project coordinator at Auxinde.

• HVAC design.

• Design of frame for the test station assembly 10000 for the C-295 military aircraft in San

Pablo (Seville) EADS.

04-2001 – 12-2002 Intermediate Command at Izar Shipyard.

• Brief description; Ship Murillo ́s length is 180, 5 meters. Thus ro capacity is 2,000 meters.

In contrast to passenger capacity is 550 passengers, which has 400 berths, distributed in 124

cabins.

• Production-construction.

• Inspection of welded joints, production rates performance.

• Teams management.

• Welding process carried out; manual welding with electrodes, TIG welding, arc welding

with gas protection, submerged arc welding, cored welding, air arc cutting.plasma arc

cutting, oxy-fuel flame cutting.

• Achievement: Implementation of a security procedure of the machines (according to

RD1215 Spanish legislation) to legalize the old shipyard machinery.

01-2000– 01-2001 Product Line Coordinator at Delphi Automotive Systems. General Motors.

• Tooling design.

• Production department.

• Achievement: Elimination of checking thicknesses step after painted according to the

quality control test procedure for dampers. It always gave error because it did not considerthe thickness of the paint layer. Resulting in savings of time over 10% and annual savings of one million euros.

Education: University studies

06-2013 QC Mechanical Inspections at Aerocad. 300 hours.

03-2008 Observation & Intervention Safety Workshop, taught by Aker Kvaerner CO,

lasting 150 hours, in March 2008.

09-2006 Foundations engineer. Foundations and Technical Building Code, taught by the

school of Industrial Engineers. Eastern Andalusia. Almería. Duration 80 hours. 09-2004 Master Studies of Workplace Risks Prevention at Ceforem– Cádiz, Spain. Lasting

900 hours.Major: Safety.

05-2004 HVAC designer. Course by autonomous equipment, conducted by the Universities

of Seville and Cadiz. Duration 135 hours.

06-2002 Master Studies of Mechanical Engineering at University of Seville.

• Metals & Metals Processing. Fluid Dynamics. Weldding. Electrical Power & Machines. HVAC.

Language skills

• Spanish: Mother tonge.

• English: Advanced (C1).

• German: Basic knowledge (A2).

Computer skills and competences

Programming skills Office applications

Management programs CAD 3D

Calculation programs Publishing

C.

MS Office(Word, Excel, PowerPoint,Access), MS Project, OpenOffice.

SAP, Presto.

Catia V5, SolidWorks,Unigraphics, Autodesk Robot Millenium, Autocad 2012.

SAP 2000, Ansys advanced level, Cypecad Carrier Energy Efficiency.

Publishing House CEP (10/12/2001-18/10/2002). Author of publications for oppositions Publications

"oppositions text, exam SAS plumbers" 26/05/02. Editorial CEP

"oppositions text, exam ISCS technical maintenance" 20/05/02. Edit.CEP

"oppositions text, exam SAS carpenters" 05/23/02. Editorial CEP "Questionnaire oppositions national police" 8/4/03. Editorial CEP "Questionnaire oppositions policeman" 24/09/03. Editorial CEP

Other Details

Title Keiko-nin 1990 martial arts. Sports competitions (1/1/1987-6/6/1994) Driving license B1.



Contact this candidate