Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Cagliari, Sardinia, Italy
Salary:
100000
Posted:
April 01, 2014

Contact this candidate

Resume:

RESUME

ALESSANDRO PODDA

Personal cell phone: (US) +1-716-***-****

Personal cell phone: (ITA) +39-392-*******

Email: acdf92@r.postjobfree.com

OBJECTIVES:

Secure a position that will utilize my vast knowledge and experience obtained over a

decade of intense work, in the areas of civil and environmental engineering.

Work in a multidisciplinary environment that will allow me to utilize my existing skill set as

designer, manager, and construction supervisor on hydraulics and transportation

infrastructures while continuing to expand my knowledge in areas where I'm less

acquainted.

EDUCATION:

1995-2001 Master’s Degree in Civil Engineering, University of Cagliari (ITALY)

Advisors: Prof. Giovanni Sechi – Prof.ssa Paola Zuddas

2002 Qualification for safety coordination for project design and execution,

University of Cagliari (ITALY)

2011 Professional Engineering Certification, Italian Engineering Association (ITALY)

PROFESSIONAL EXPERIENCE:

December 2013 – present Project manager for the Government Public works aimed for the Design

and construction of “Reduction of hydrogeological risk in the great area of several

towns including 500000 inhabitants (Italy)” (€. 9,500,000.00).

July 2002 – December 2013 Project manager and construction supervisor at Sardegna Ingegneria

S.c.r.l, a consulting firm operating in the sector of civil and environmental

engineering. The main activities carried out with this firm are summarized below.

Research and Planning

• 2002-2003: Co-author of “Environment plan for Sardinia district according of the Italian Law n.

36/94”;

• 2003: Co-author of “Directional plan of Sardinia district for water resources utilization (Italian Law

n. 183/89)”;

• 2003: Business analysis for the identification of 14 infrastructures in the water supply systems of

the island of Sardinia funded by the European Union.

Design and Construction Management (Main projects Main projects as a Project Manager and

a Construction Supervisor)

Water and environmental engineering

• 2013-2010: Design and construction of “Flood protection canal of the city of Sarroch (Italy)” (€.

700,000.00)

• 2013-2002: Design, construction, management and safety coordination for the design and the

execution of “Construction of separate sewer and wastewater reutilization systems (including

wastewater treatment plant and pump station) of several towns in Italy” (€. 39,741,500.00), with

separation of sewer and storm waters including the identification of unauthorized connections.

• 2013-2002: Design, construction, management and safety coordination for the design and the

execution of “Construction of water distribution network of several towns in Italy” (€.

41,239,744.00), with substitution of obsolete cement-asbestos pipelines.

• 2013-2008: Design and construction of “Reduction of hydrogeological risk in the city of

Villagrande (Italy)” (€. 4,914,000.00), aimed at reducing the flooding and landslide risk in the

mountainous town of Villagrande.

• 2012-2003: Design, construction and safety coordination for the design of “Connection pipeline of

Tirso-Flumendosa Campidano (Italy) water supply system” (€. 35,248,000.00), aimed at

increasing the elasticity of the water supply system of the South of Sardinia, especially during

drought conditions.

Page 1 - Resume of

PODDA, Alessandro

• 2004: Design, construction, management and safety coordination for the design and the execution

of “Upgrading of the sewerage and waste water system and wastewater treatment plant and pump

station of the city of Laconi (Italy)” (€. 5,670,000.00)

• 2004-2002: Construction and Management of “Water leak detection and upgrading of the water

supply network of the city of Sinnai (Italy)” (€. 620,000.00)

• 2003: Design, construction, management and safety coordination for the design and the execution

of “Upgrading of the sewerage and waste water system of the city of Trinità d’Agultu (Italy)” (€.

10,315,000.00)

• 2002: Design of “Complementary works for upgrading the Monte Exi dam with the goal of

reutilizing the waste water of the city of Iglesias (Italy) for irrigation purposes” (€. 5,786,300.00),

including complex pipeline laying in the mountainous landscape and consequent need to use

mines for the realization of underground passages.

Methane-gas field engineering

• 2013-2006: Design, construction, management and safety coordination for the design and the

execution of “Construction and management of methane-gas pipeline network of the Sardinian

district (Italy)” (€. 309,151,793.00), aimed at transporting and distributing in Sardinia methane

from Algeria (Africa) via a submarine gas pipeline.

• 2013-2012: Design, and safety coordination for the design of “Completion works of methane-gas

network of several towns (Italy)” (€. 2,066,905.00)

Transportation engineering

• 2013-2002: Design, construction and safety coordination for the design of “Construction of

connecting road network between several towns (Italy)” (€. 5,965,000.00)

• 2009-2006: Design, construction, management and safety coordination for the design and the

execution of “Safety improvement intervention of Provincial road nr. 2 between the city of Barbusi

and the city of Portovesme (Italy)” (€. 2,200,000.00)

• 2008-2006: Design, construction and safety coordination for the design of “Safety improvement

intervention of Provincial road nr .2 between the city of Carbonia (Italy) and the city of

Villamassargia (Italy)” (€. 2,300,000.00)

• 2003-2002: Design and safety coordination for the design of “Construction of “Is Pontis Paris” split

(Italy)” (€. 11,175,000.00), with consequent reduction of intense traffic in the Capital of the

Sardinia region.

Building engineering

• 2013-2010: Design and construction of “Construction of multilevel garage in Trinità d’Agultu town

(Italy)” (€. 5,561,722.00)

• 2012-2008: Design, management and safety coordination for the design and the execution of

“Expansion and rehabilitation of Nuxis (Italy) intermediate school building” (€. 344,400.00)

• 2013-2010: Design, construction, management and safety coordination for the execution of

“Shore protection works of Santa Teresa Harbor (Italy)” (€. 1,091,430.00)

Communication engineering

• 2013-2011: Design, construction, management and safety coordination for the design and the

execution of “Construction and management of wideband network of Sardinia district (Italy)” (€.

8,988,000.00), with introduction in the territory of a new data transmission system and

management of community relations related to it.

MEMBERSHIP:

January 2003 – Present Engineering Association of Sardinia region (Italy)

LANGUAGE SKILLS:

English (fluent), French (intermediate), Spanish (intermediate), Italian (Mother tongue)

COMPUTER SKILLS:

Microsoft Office, AutoCad, Civil 3D, Leonardo, Cplex, Lindo, EqualFlow, Mosaico, Primus, Matlab,

Hec-Ras.

ADDITIONAL INFORMATION:

Boating and sailing, Basketball tournament (playmaker), Soccer tournament (midfielder),

Treasurer of charity institution and of cultural association

Page 2 - Resume of

PODDA, Alessandro



Contact this candidate