Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Brampton, ON, Canada
Posted:
May 22, 2014

Contact this candidate

Resume:

MOHEB M. GUIRGUIS – P. ENG.

**- ********** ********, ******** * Mail : acd81k@r.postjobfree.com

L6X-0M9, Ontario / CANADA Tel : 905-***-****

WORK EXPERIENCE

MALFAR Mechanical INC. Wood bridge, ON (Oct 2013 till Now)

Senior Project Engineer

• Prepared Project Installation details, Schedules of Material, verification of design concept for:--

[ Lorne Park- water Treatment Plant–HALTON Municipality, Mississauga / ON ].

GRG Building Consulting Engineers Toronto / ON Jan 2013 to March 2013 )

Senior Project Engineer

• Prepared 12 - “ BCA” Building Condition Assessment Report & “ 12” Five Year Summary Table

Template for Halton –Municipality Buildings, Oakville / ON

DCL Engineering Consultant Brampton/ON-- ( Nov. 2012 to Dec 2012)

Senior Project Engineer

• Prepared 4 - “BCA” Building Condition Assessment Reports

[ London Ontario & North York Buildings / ON]

John R. Hamalainen Engineering Ltd., Sudbury / ON July 2007 to June2012)

Senior Project Engineer

• Prepared design work for HVAC, Plumbing, Fire protection systems, Process systems, Mining heating and

ventilating systems, energy management studies for: residential, commercial, institutional, industrial buildings.

• Prepared the design of HVAC system to two health care facilities to meet the National Standard of Canada

and the special requirements for HVAC systems in health care facilities.

[ CAN / CSA-Z317.2-01 updated no-1 in February 2003], Projects No 2428 & 2438.

• Prepared Ventilation systems for underground mining tunnels.

Duties and Accomplishments for HVAC and Control Systems:

• Prepared the design work for Heating systems by using :--

HYDRONIC heating systems including [ H.W. Boilers, Steam boilers, Condensate type boilers

[ High / Medium Efficiency types], S&R hot water pipes, Zone Control valves, hot water Radiators,

thermostats, electric heating radiators or Infra-red gas fired radiant heaters or

glycol heating system with heat exchanger, electric heating coils and thermostats etc.

• Prepared heat gain/loss calculation, selection of equipment, equipment layout plans, duct distribution layouts

c/w : sizes, silencers, Volume control dampers, Dust control symbols, VAV terminal boxes with by -pass duct, wall

mounted steam humidifiers, selection of air outlets, coordinating A/C layout with the architect reflected ceiling plan

and lighting fixtures layout.

• Prepared general specification, specific specification, schedule of equipment to Roof top package units, Indoor

AHU’S with air cooled condensing units, exhaust fans, duct insulation steam humidifiers, flexible metal ducts,

galvanized air duct, VAV terminal boxes with DDC controls, supply ceiling /floor air outlets and return air outlets.

• Prepared HVAC installation detail layouts for :Duct work, steam humidifier, air Intake economizer, deep seal

drain connection, condensing units, indoor AHU’S, roof top package units, roof curb, split units hook-up.

• Prepared Ventilation layout for wash rooms, kitchen, janitor room, laundry and dust control system..

• Prepared scope of work for the third party / testing and commissioning team.

• Prepared the required documents / required guarantee certificates for one year free maintenance, heat

exchangers, boilers –etc.

• Prepared the close-out documents to be supplied by the main contractor upon completing the testing and

commissioning procedures and handing over the project to client as” As built drawings, TSSA & CSA

Duties and Accomplishments for Plumbing Work ( Drainage/Sewer, Hot/Cold Water Distribution Systems)

• Prepared drainage and domestic water layouts.

• Prepared the specification and installation details for drainage and domestic water systems.

• Prepared Calculation, selection of equipments, schedules of equipments, sequence of operation and scope

of plumbing work.

• Assist with Mechanical equipment packages from preparation of technical specifications to bid evaluation

t hrough to installation of boiler system equipment.

• Coordination with various stakeholders including other disciplines, project management team, construction

management team and vendors to facilitate smooth f low of information.

• Responsible for system design and development of boiler systems.

• Prepare optimization studies.

• Design plant wide condensate return system.

I nput to building layout and auxiliary systems; participation in design reviews

• Application of North American codes, regulations and standards.

H&R Property Management Ltd. Toronto/ON Jan. 2006 to June2007)

Apartment Building Superintendent in( Condominium complex)

• Maintenance Activities: Troubleshoot and perform minor repairs on plumbing systems, Troubleshoot and perform minor repairs

on appliances, Perform routine maintenance jobs and repairs, Work with minimal supervision.

• Contact contractors for major repairs and maintenance of the Complex.

Lansdowne Property Management Toronto/ON Feb2005 to Dec 2005)

Apartment Building Superintendent in(Apartment High Rise Building )

• Maintenance Activities: Troubleshoot and perform minor repairs on plumbing systems, Troubleshoot and perform minor repairs

on appliances, Perform routine maintenance jobs and repairs, Work with minimal supervision.

• Contact contractors for major repairs and maintenance of the High Rise Building.

Education / Licences Toronto/ON ( 2003 to 2005)

• HRAI Skill Academy (HVAC Heat Loss/ Gain Calculations and Air System Design Course).

• Humber College, Toronto (HVAC Design Course for Small to Medium Residential Homes).

• PEO License as P.ENG.

• B.Sc. in Mechanical Engineering, Ain Shams University, Cairo, Egypt

INTERNATIONAL WORK EXPERIENCE

Dhabi Contracting Co. Abu Dhabi, UAE (2001-2002)

Projects Manager

• Supervised installation of mechanical work for projects: Abu Dhabi industrial city and Abu Dhabi wedding hall.

Al Hamed Contracting & Development Co. Abu Dhabi, UAE (2000-2001)

Head of Mechanical Design Division

• Verified design works/ design conditions for HVAC system,

• Prepared workshop drawing, coordination drawing, builders working drawing, material submittals for each service

to consultant approval.

Diar Consult. Abu Dhabi/ Dubai, UAE (1999-2000)

Senior Mechanical Engineer

• Resident engineer for Project/ Golf Course Club. Checking and reviewing material submittals, workshop drawing,

program of installation work.

• Supervised installation work for HVAC system, plumbing, fire protection, external sewer /foul drainage work.

Architectural Engineering Consultant Abu Dhabi, UAE (1990-1999)

Head of Mechanical Division

• Prepared design work of HVAC, Plumbing, Fire protection, including heat load calculations, design of -

Ducting lines, chilled water piping, sizing of cooling chillers / pumps, chiller yard, controls, pump stations

schematic diagrams for piping / controls, sequence of operation, design sketches, detail drawings etc.

• Supervised installation, testing & commissioning and handing over projects to clients.

Page -2-

Education

• B.Sc. in Mechanical Engineering, Ain Shams University, Cairo, Egypt

Professional Licences and Memberships

• Professional Engineering License, Cairo, EGYPT 1985)

• Professional Engineering License-“PEO”/ON, CANADA-- (2008)

Experience:

• 16 years in Cairo ( Egypt) and in Abu Dhabi (UAE)

• 03 Years In Sudbury, ON/ CANADA

Executed Projects In Sudbury, ON /CANADA:--

• Two health care facilities in Kapuskasing and Angle hart /ON

• Two Laboratories in Northern College / Timmins, ON

• Several Residential, Commercial, Institutional and

Industrial Projects in Ontario.( As per attached list)

Skills, Responsibilities and Experience :

• Able to plan, manage time and targets.

• Able to identify and suggest new ideas to get the job done creatively in proper performance.

• Able to communicate issues concisely and to coordinate with other disciplines and projects requirements.

• Enjoy a fast paced environment, proven ability to handle multiple projects independently and

meet quick deadlines.

• Excellent spoken and written skills.

• Supportive, flexible, cooperative and initiative.

• Responsible to set goals /priorities, understand and contribute to any project requirements.

• Responsible to coordinate mechanical work with other services.

Accomplishments:

• Design of mechanical systems /work to meet / comply with O.B.C., CSA, ASHRAE, NFPA,

ASME, Energy saving Standards and Green environment requirements,

Benefits:

• Contribution to any organization goals.

Details of Duties for HVAC, Plumbing, Storm water and Fire systems

• Performed heat loss / gain calculation by Carrier E-20 software program.

• Selected suitable type of HVAC and Control system for each Project / Application.

• Prepared selection of equipments c/w: model no’s, parameters, technical characteristic data and options-etc.

• Prepared design sketches for:--

o Mechanical rooms, duct routing/sizes, chilled water piping routing /sizing, equipment arrangement/location

c/w: size/weights of equipments Showing : distances, clearances, axis, center lines, concrete bases, chillers,

boilers, pumps connections, installation details, pipe supports/hangers, chilled water and /or hot water

pumps c/w:

valves, strainers, flexible connections, reducers, gauges, thermometers, automatic air vents, anti-vibration

mountings, insulation details for duct, pipe and equipment. connection details for:--

AHU’S / FCU’S, Rooftop Package Units, steam humidifiers, deep seal U-traps, hot water heaters, sump,

In-line and end suction pumps.

o Ventilation systems for wash/utility rooms c/w selection of exhaust fans and exhaust air louvers, duct

routing/sizes---etc.

o Connections details for:--

AHU’S / FCU’S, Rooftop Package Units, steam humidifiers, deep seal U-traps, hot water heaters, sump,

In-line and end suction pumps.

o Drainage system c/w piping lines, slopes, sizes, manholes etc

o Domestic cold and hot water pipe lines c/w sizes, controls –etc.

• Prepared schedule of equipments, design conditions, sequence of operation, scope of work for each service.

• Prepared piping, duct and control schematic diagrams

• Prepared design detail sketches for internal/external sewer, domestic water, storm water and fire protection

systems c/w: pipe sizes/routing, slopes, levels, axis, clearances, location and connections of fire hose reel

cabinets, fire extinguishers, valves, nozzles, pipe connection details etc.

Page -3-

Continue:

• Prepared selection and specification of sanitary fixtures.

• Prepared testing and commissioning procedures for each mechanical system.

• Supervised installation work, testing and commissioning work of each system.

• Checked/ Reviewed material submittals, workshop/ coordination drawings, builders working drawings and

program of installation work.

• Checked/ Reviewed projects close-out documents, as built drawings, operation and maintenance manuals,

testing and commissioning reports/ readings, CSA and TSSA certificates.

Contact Information:

Moheb M. Guirguis – B.S.M.E. - P.ENG.

TEL : 905-***-**** Mail : 25 Dehaviland Crescent

E-MAIL : acd81k@r.postjobfree.com Brampton / ON / L6X-0M9

Page -4-



Contact this candidate