Umair Saleem Ghouri

Dubai, U.A.E

Cell: 052*******; Email: acd41o@r.postjobfree.com

BE Mechanical Project Engineer / Coordinator / Planning Engineer

Preferred Sectors: Oil & Gas / Project Management / EPC / Planning & Coordination / Fabrication and

Manufacturing

Synopsis: PEC Certified Professional Engineer, a ccomplished professional with 3.5 years of experience in Project

Management as a Project Engineer / Project Coordinator / Planning Engineer and in Petrochemical process plant as

Maintenance Engineer. Currently working as a Project Engineer/Planner/Coordinator with Descon Engineering Ltd –

Pakistan

Qualification

• Bachelor of Engineering in Mechanical, NED University of Engineering & Technology Karachi, Pakistan (Dec 2010)

Professional Skills:

Dealing skillfully with a diverse range of people including clients, third party, other engineering professionals.

Working as an EPC Consultant to mitigate the on going site works.

Follow up with the contractors and client.

Aligning the actual works with the project baseline schedule.

Generating LF plans and monthly progress report.

Planned v/s Actual gap analysis.

Progress monitoring of overall project.

Proactively forecasting the shortcomings and proposal of alternate plan to carry out the job.

To help Project manager/Site manager managing Site affairs,

Complying and implementing HSE requirements.

To ensure project deliverables in timely manner.

Carrying out allocated duties and adherence to quality inspection plan (QIP).

To evaluate and approve design changes in terms of As built drawings..

Scheduling work & providing appropriate plans for the available workfront.

SoftwareSkills : MS Excel, MS PowerPoint, MS Word, MS Project.

Career History

Experience Summary 3.5 years

Project Coordinator/Planning Engineer

26th Dec, 2011

to Project Management Department, EPC Business Area

Present Descon Integrated Projects Limited, Pakistan

Achievements

• It is certainly an honor for me to work on Pakistan’s first wind power project that turned out to be a success in the first go and

producing electricity.

• Since it was the first project of its kind so I worked well establishing new sets of jobs/procedures regarding erection, supervision,

material handling, site handling, codes and standard compliance, abiding by the HSE parameters that later became SOP on

company documents.

• Prepared the SOP that became part of Contract Document, Descon official QIP, documentation and manpower utilization plan.

• Due to the fact of having good communication and interpersonal skills with people from different ethnicity, I succeeded in setting up a

very productive work environment that helped site team meet the schedule deadlines well in time.

• Led my team in achieving timely contractual milestones like Mechanical Completion Certificates, Readiness for Synchronization and

WTG Readiness for Commissioning and raised the request to WAPDA for the Grid connection in order to commission the whole

interconnection facility and complex.

roje c t Des cri pti on

P

1. EPC works for FWEL I & FWEL II, 50+50 MW Wind Power Plant, Gharo

(Jan 2013 to date)

Client: Fauji Foundation Wind Energy Ltd.

Project Value: USD 210 Million

Position: Planning Engineer / Coordinator

Description: Scope of work includes Engineering, Procurement and Construction

2. EPC works for FFCEL 49.5 MW Wind Power Plant, Jhampir

(Dec 2011 – Jan 2013)

Client: Fauji Fertilizer Co. Energy Ltd.

Project Value: USD 133 Million

Position: Project Coordinator

Description: Scope of work includes Engineering, Procurement and Construction

Major Responsibilities

• Working as an EPC Consultant to improve the on going site works and follow up with the contractors and client.

• To develop understanding and importance of Contract document within team so as to timely accomplish schedule deadline.

• Working as a constructive and supporting element of the Project Management Team to achieve project milestones aligned with the

baseline schedule.

• To ensure project deliverables in timely manner, carry out allocated duties and adherence to quality inspection plan (QIP).

• To evaluate and approve design changes in terms of As built drawings.

• Working at Descon Manufacturing workshop on Wind Tower fabrication job.

• The method statement is used to control the operation and to ensure that all concerned are aware of the hazards associated with the

work and the safety.

• Compiling the progress status for all wind towers comprising all minute details of on going work on shop floor, which helps in

synchronizing with the project baseline schedule, planned v/s actual gap analysis, invoicing against works performed,

monitoring the overall project progress status, dynamic coordination with client and top management and expediting,

settling down the routine discrepancies, and the work front available to start new activity on priority.

• The preparation of the weekly program containing works timeline with an indication of the resources needed to accomplish.

• Fully awareness of subcontractors contracts to know their limits.

2

• Extensive coordination with the Project Management team, client’s representatives at site, Owner’s Engineers and German

contractor (WTG supplier) to streamline forthcoming issues.

Fabrication of Wind Towers

CODE / Standards Awareness

ASME Section V, VIII, IX, B31.1 & B31.3, API 650, API 653

• To look after the fabrication of Wind Tower, Fit up and welding of shell courses as per drawing, procedures and technical

specifications.

• To quantify and measure the progress of the work in %.

• To produce daily and weekly activity plan.

• Able to make recommendations to superiors where improvements in quality or project effectiveness may be made.

• Coordinate with production department to ensure timely completion of project.

• Ensuring implementation of project quality inspection plan (QIP)

• To prepare variance report, monitoring and controlling of project and progress status well in time.

• To conduct final visual & dimensional inspection of wind towers.

• Taking care of issuance of welding electrodes, sub arc flux for welding processes like MAG, SAW and SMAW.

• To randomly supervise the Fit up of internal sockets of platforms, ladders, cable trays, attachment points etc.

• Detailed coordination and progress monitoring to head office in (WPS, PQR, Fit up, Welding, Dimensions, DPT, VT, UT, RT, Testing,

Blasting, painting, internals installation and dispatch of tower sections.

Site Experience

• Diligent supervision of all the on site Mechanical works if all mechanical activities have been executed as per dwg.

• Hands on experience on Wind Turbine Generator coupling & alignment using fixture laser device.

• Attended the training session titled ‘Safety/rescue climbing training over the Wind Turbines’ along with its certification.

• Carried out the Erection of Wind Turbines.

• Participated dynamically in completion of Punch List of Wind Turbines.

• Able to communicate fluently and clearly in English with clients, site foremen regarding technical matters.

• To maintain a healthy effective coordination between all disciplines and departments (Civil, Mechanical and E&I)

• Coordinate with Quality control, shop supervisor, third party and the Client for testing as per approved QIP.

• Worked on 132kV switchyard in order to inspect assembling, torquing, alignment and leveling of the structures such as CT, VT, Surge

Arrestors, Line Traps, Hy Pact Switchgear Assembly, Gantry, Two Power Transformers each of 50MVA and for Shunt Compensation

Area (Capacitor Bank).

Maintenance Engineer

26th Jan, 2011

to Mechanical & Utilities Department

18th Dec, 2011 NOVATEX Limited, Pakistan

Responsibilities

• Worked on a shutdown of Plant Polycondensation I. Hands on experience on maintenance of different gear boxes, pumps and other

shutdown jobs as per SOP.

• Condition Monitoring for Predictive Maintenance of all rotary equipments of two main plants Polycondensation I & II having 350 & 600

tons/day capacity using MicroVib P & Vibration Pen. Rotary equipment includes Pumps, Gearboxes, Agitators, Blowers &

Crystallizers.

• To follow up the daily scheduled jobs and activities using maintenance software MOGAN.

• To review a BOQ of material against system drawings prior to the project for cost analysis including the project evaluation and

execution.

• Cost Estimation of new Project

• Verification/checking of Bills raised by the contractors.

• Construction of a new fabrication workshop for miscellaneous welding/fabrication works.

• Steel structure/platform for new Molding Machine (Injection & Blowing) imported from Japan. All the material procurement like Piping,

Fittings, Valves, Heat Exchangers, Cooling Tower, HP Compressor, Pumps.

• Development of Daily & Weekly progress monitoring system (Quantity & % age wise)

nterns hi p (June 2009 July 2009)

I

PAKISTAN INTERNATIONAL AIR LINE (PIA)

• Maintenance in an engine overhaul shop.

• Submission of Internship report at the end of the tenure

Academic Attainment

2010 BE Mechanical NED University of Engineering & Technology, Karachi 1st Division

Short Courses

• MS Office

• MS Project 2010

• Pro E wildfire 2.0

Personal Details

• Marital Status: Married

• Date of Birth: 27th August, 1988

• PEC Regst. no: Mech/24455