Post Job Free

Resume

Sign in

Manager Engineer

Location:
Irwin, PA, 15642
Posted:
March 03, 2014

Contact this candidate

Resume:

David Pandullo

***** **** **. ***** **********, PA 15642

724-***-****

accxkj@r.postjobfree.com

To Obtain a Position within an organization that

Objective: will utilize my diverse skills to maximum mutual

benefit while providing opportunity for

advancement.

Summary:

Proficient Electrical Engineer / Production

Supervisor and Facilities Manager with over 5

years Environment Health and Safety Experience.

30+ years of PLC, Robotic (Programming and EOAT

Design), HMI interfacing to new and existing

Experience: equipment, Bronze Foundry Molding, High Speed

Ceramic and Glass Pressing, Glass and Ceramic

Facility Extrusion, Plastic Molding, Machine Automation and

Manager Project Management experience. Knowledge of

considerable aspects of Electrical Engineering,

Manufacturing, Pneumatic / Hydraulic Circuitry and

Mechanical Conception regarding Tooling/ Ergonomic

processes. Professional, flexible, creative, and

service-oriented. Offering a unique combination of

creativity and analytical skill with the ability to

create cost-effective solutions.

Morgan Technical Ceramics, GBC Materials

Latrobe, PA 5 years

Managed, directed and coordinated the design,

maintenance, and alteration of equipment,

machinery, building and grounds. Established and

maintained policies and procedures to ensure

compliance with federal, state and local health,

safety and environmental programs.

Key responsibilities included:

? Plan, budget and schedule facility modifications

including cost estimates, bid sheets, layouts and

contracts.

? Manage, direct and inspect construction and

installation progress to ensure compliance with

established standards and specifications.

? Suggest and implement automation and upgrades to

increase throughput of production.

? Test and troubleshoot newly installed machinery

and ensure fulfillment of contract specifications

and proper and safe operation.

? Suggest changes in working conditions and usage

of equipment to increase efficiency of workforce.

? Develop, maintain, promote and ensure compliance

with facility and equipment preventative

maintenance program and safety program.

? Direct maintenance and repair of facility and

coordinate scheduling.

Ceramic Press Room Supervisor (Responsibility added

in conjunction with Facilities Manager duties)

Provide support/ direction for Ceramic Press Room

employees to enable them to follow their schedule

of machines to operate.

Following up with QA department on issues that are

impacting through put and determining what steps to

follow to resolve issues.

Worked with Production Manager to determine the

best methods to follow in order to get the proper

dies setup and ready to run in the timeliest

fashion.

Worked with Machine Shop to streamline Tool Repair

or Tool Replacement timing.

EHS Representative (Responsibility added in

conjunction with Facilities Manager duties)

Duties to be preformed as required by: OSHA, Morgan

Corporate, or ISO procedures.

Filling out and filing necessary forms in

investigating an Incident and determining what can

be done to prevent a re-occurrence.

Act as main liaison with regulatory bodies during

inspections.

Investigate all industrial accidents.

Drive health and safety improvements as EH&S

coordinator

Maintain OSHA logs and fulfill other

Environmental/Safety requirements.

Accomplishments:

? Rebuilt 3 Glass Kilns for $15K each in house

rather than having outside vendor do for $85 K

each.

? Resigned existing Grinders and build 2 Wet cut

saws used primarily in Extrusion process for $12K

each rather than purchasing a Dicing saw for $150K.

? Implemented Program change in Wet Cut saws to

"Mirror Image" Notching of product to reduce

manpower required as part of the Inline Process.

? Worked with OEM to determine best practice on

the rebuilding of their pressing equipment.

Developed Predictive Rebuild of equipment based on

weeks of service in production.

Further refined Predictive Rebuild by determining

what components needed to be replaced based on

weeks of service. The equipment would be fully

rebuilt only after 78 weeks of service. There

would be partial rebuilds that occurred 26 and 52

weeks of service. The replacement components were

setup in "Kits" that would be used based on the

number of weeks of service.

Initiated the fabrication of components, by Machine

Shop, necessary for Repair of equipment or to be

used as part of Production Process rather than use

OEM supplied components at significant savings

while maintaining OEM Specs and Quality.

? Directed outside vendor on design criteria of

Bulk Weighing system that was accurate to within

5 pounds on an 1800 pound batch, increasing

the quality of final mix.

Senior Controls Sensus Metering Inc.

Engineer Uniontown, PA 20 years

Programming of all test and assembly Equipment

including all PLC's, Robots, HMI displays

Specifying and implementation of all safeties

required on equipment.

Specifying and Implementation of Fire Alarm System.

Design and build of Vertical injection Molding

Machine controls.

Investigated, purchased, and installed Security /

Door access system.

Improved operation of existing testing / assembly

equipment to improve up time while reducing labor

cost.

Controls

Engineer AC Spark Plug General Motors Corp.

Flint, MI 7 years

Programming of test and assembly Equipment

including PLC's, Robots, HMI displays

Improve operation of existing testing / assembly

equipment to improve up time while reducing labor

cost.

Education Penn State University Middletown, PA

B.S. Electrical Engineering 1981

Westmoreland County Community College Youngwood,

PA

A.A.S. Electrical Engineering 1979

References are available on request.

References



Contact this candidate