Michael Miller
Olathe, Ks *****
Cell: 913-***-****
accv9s@r.postjobfree.com
Fifteen year plus experience with Civil Industrial large earth excavating projects; Civil Infrastructure;
Telecommunications; Private Sector Projects; Army Corps.; Heavy Highway public; Concrete Paving; Asphalt
Paving; Wet Underground Utilities; Gas, Electrical, and major infrastructure projects.
Specialties:
• Bid2Win
• Carlson Takeoff and Carlson Civil
• AGTEK
Personal Tributes:
• Self Starter
• Great Communicator
• Knowledge of methods
• A Passion for Civil Excavation
• Management of others
Experience:
General Contractor Contract Work
SR. Project Manager / Sr. Estimator
2008 – Present
• Working as a Senior Civil Project Manager for a variety of GC clients.
• Implemented Bid2Win Estimating Program – Mies Construction
• Water Lines 8” DIP to 54” DIP
• DOT Highway, Concrete paving - $15M to $250M
• Army Corps – General Contractors Earth dams to levees
Larkin Excavating, 4 yrs
Sr. Project Manager
2004 - 2008
• Negotiated change orders
• Interact daily with owners owner representatives
• design build, Water Treatment Excavation
• Large project experience, Large dirt excavation, paving and grading projects
• Primavera P-6, CarlsonSW, AGTEK, proficient with Bid2Win, knowledge of HCSS.
CD Webb Construction, 20 plus yrs
Chief Estimator / Project Manager / Superintendent
1972 - 2004
• Responsible for estimating and bidding projects of site utilities and civil excavation
• Proficient with Bid2Win, & Build2Win Estimating Program, HCSS and Carlson SW Civil, Takeoff, Hydro
software, Agtek software
• Utilities include Storm Sewer - Sanitary Sewer - Water Lines – Gas Lines – Underground power lines
• GPS units staking projects - Trimble and Carlson SW programs
Projects:
Name/ Location / Type of project, (structure, scope of work, etc.)
• $10m to $55m Water Mains, Transmission Mains 6” to 54”, Outfall Structures, Pump Station, DIP pipe, PVC
pipe, Steel pipe ect… as Estimator
• $10m to $25m Excavation for Water Treatment Plant, Estimator
• $65m Site Development 500 acre site Black Paving, Concrete curb, Concrete sidewalks, Utilities ( Storm, Box
Culverts Precast and poured in place, Sanitary, Water Lines, Gas Lines, Communication Lines)
• Multiple Commercial Site development $25m to $100m
• Dams, Levees, Earth Dams for the Corps of Engr. Estimator and Project Manager
DOT Interchange I-75-I-70 $165m, Concrete Surfacing, Utilities, Estimator and Project Managing
• DOT I-75 & Bridges $133m Concrete Surfacing, Utilities, Estimator and Project Managing
• DOT I-70 & Bridges $80m Concrete Surfacing with Utilities, Estimator and Project Managing
• Estimator $15m to $30m
• I-70 and I-75 Inter Change 1 Grading, Bridges & Concrete Surfacing and Project Manager
Estimator $52m
• I-75 Interchange 2 Grading, Bridges & Concrete Surfacing and Project Manager
Estimator $46m
• I-70 Grading & Concrete Surfacing, Utilities and Project Manager
Estimator $58m
• I- 35 Grading, Bridges & Concrete Surfacing and Project Manager
Estimator $45m
• I-470 Grading, Bridges & Concrete Surfacing and Project Manager
Estimator $46m
• I -71 Grading, Bridges & Concrete Surfacing and Project Manager
Estimator $65m
• I-465 Grading, Bridges & Surfacing and Project Manager
Estimator $40m
• Site Development Ft Riley Grading, Asphalt Paving & Utilities and Project Manager
Estimator $29m
• I-65 Grading, Bridges & Surfacing Project Manager
Estimator $41m
• Wall-Mart Distribution Center Mass Excavation Site Grading, Site Utilities and Project Manager
• Foundation Excavation Project Manager
• Estimator $42m to $75m Landfill cells, Landfill closer Excavation for new cells, Synthetic liner, Clay liner,
Landfill cover, Estimator and Project Manager
• Estimator $35m Utilities Storm Sewer, Box Culverts Precast, Sanitary Storm and Water Line
Skills & Expertise
Bid2Win, HCSS, CarlsonSW Civil Auto Cad 3D, P6, Agtek, grading, contract negotiation, plans, construction, concrete
estimating, pre-construction, construction management, change orders, value engineering, project bidding, project
estimation, concrete pavements, asphalt pavement, subcontracting, contractors, constructability, earthworks, site
development.
Attended: The Ohio State University for Construction Management, project control and development, site planning,
building design, construction methods, construction materials, value analysis, cost estimating, scheduling, contract
administration, building codes and standards, inspection procedures, as well as electives in engineering and architectural
sciences, mathematics, statistics, and computer science. I had previous worked in the field as a Superintendent and a
General Superintendent. I have directed over 150 personal in the field and coordinate heavy equipment, with the
coordination of subcontractors. I also have taken estimating and project management courses from Construc tion
I nstitute I have over 100 hours each of t raining.