DUNSTAN FREDERICK, PE

*** ***** ***** **.

Sugar Land, TX 77478

832-***-**** (Cell)

1

* ********* : Position as Project or Senior Electrical Engineer.

EDUCATION

University of Phoenix, Masters in Business Administration (MBA) - 2004

Pratt institute, Brooklyn NY, Bachelor in Electrical Engineering (BEE) -

1981

NYCCC, Brooklyn NY, Associate in Electrical Technology (AAS) - 1979

1 LICENSES/REGISTRATIONS

Professional Engineer (PE) Texas (#64495)

SPECIALIZED TRAINING

General Protective Device Coordination (TTG) Risk

Management Seminar

National Electrical Code (NEC)

Management Effectiveness training

Electrical Power Distribution System Analysis Project

Engineering Training

Overhead lines

Project Scheduling (Sure track)

Electrical Design Execution

National Fire Protection (NFPA)

Variable Frequency Drive

Nuclear Power Plant System training (Ebasco)

ETAP Power systems (OTI)

EDSA Design Training

Battery and Charger Seminar

UPS/Inverter (Plant engineering Consultants)

SKM Power System

EXPERIENCE SUMMARY

Provided many years of service in Electrical Engineering with ten years in

supervision; supervised small groups, all inclusive, engineers, designers

and Cad operators. Responsibilities associated with positions held were

that of electrical engineering, design, management, schedules, preparation

of project(s) budget, estimates, electrical standards, department

procedures, design and technical review/approval, project review, system

studies, client/corporate interfaces, construction interface, installation

and Start up support. Experience includes electrical designs up to and

including 230KV systems, power circuit analysis, protective devices,

calculations, safety reviews and design verification; Scopes of work

preparation, system descriptions, vendor bid evaluations for the

procurement of equipment. Prepared equipment specifications, construction

installation specifications and bid packages for subcontract work. Foreign

assignment experience (Alcoa- Surinam & Jamaica).

PROFESSIONAL EXPERIENCE:

09/2009 to Washington River Protection Solutions (WRPS for Department

of Energy)

12/2013 Washington State, WA

. Project Engineer

Currently, Supporting freeze protection (heat tracing)

activities in Retrieval and Closure, C-tank farm area. Provided

design to localize and monitor the heat tracing circuits and

thermocouples.

Responsible for providing technical engineering support and

oversight on the SST tank farm project(s) for all tank farm

areas. This included interface during design and construction

activities while cognizant of project cost, scope, and

schedule. Redesigned the electrical distribution systems

(twelve -12 tank farms) for efficiency and cost effectiveness

by deleting equipment that were no longer functional /

unnecessary and redesigning the system to minimize maintenance

cost.

Prepared preliminary design and procured a new Power Operation

Center (POC) with new electrical distribution equipment,

required for the transfer of waste to the Waste Treatment Plant

(WTP)

07/95 to Aker Solutions (Oil/Gas/Chemical Industry-14 yrs)

03/2009 Houston, TX /Greenville, SC Offices.

. Electrical lead/Department Lead:

Aker Kvaerner Plant Services Group (AKPSG) - Electrical and

Instrumentation Department Manager for small projects (e.g.

Clients: Lucite, ER Carpenter, Bigler LP, Lyondell, DuPont etc.)

. Senior Electrical Engineer:

Power Plant Proposals - Provided engineering support,

specifications and estimates for multiple international (IEC)

and domestic projects. Development of conceptual one-lines and

bid packages for budgetary pricing, and overall estimating

support.

. Assigned to the JBEK alliance to provide engineering support to

DuPont projects at Sabine River Site in Orange, Texas. Duties

include electrical studies, Relay settings, estimates,

schedules, equipment requisitions and the review of design

documents to assure concurrence with DuPont and National

engineering standards.

. Assigned to Alcoa making intermittent visits to Alcoa Bauxite

facility in Jamaica supporting field activities and bringing

work back to the Houston office.

. Assigned to South America (Suriname) as Design Manager on the

Alliance between Aker Kvaerner and Alcoa. The assignment

involved modifications and updating of Alcoa Bauxite facility in

an effort to make the system more cost effective. Supervised

engineers and designer in modification of the electrical

distribution system. by extending the distribution system to

Afobaka, adding new switches to the switch yard and upgrading

the communication system (e.g. equipment/repeaters) linking it

back to the main control room in Paramaribo City.

. Petronas and Union Carbide (Malaysia): The project will cause

an increase in production of ethane/propane. Contribution was

in the preparation of the bid package. Participated in the

preparation of the scope of work and design criteria. Wrote

specification for the 132 kV gas insulated switchgear, assisted

in the preparation of the single lines, provided preliminary

calculations for short circuit (utilizing ETAP and EDSA

programs) so that equipment can be selected.. Systems were

based on IEC, 50 cycles and voltages were 132, 11, 3.45 and

0.433 kV.

. G.E. Plastics - Bay St. Louis, Mississippi: Provided the

material requisitions and reviewed the system studies for the

SMA and Finishing Projects.

11/90 to Bechtel Savannah River, Inc. (SRS)

07/95 North Augusta, SC

. Electrical Group Lead Engineer: Responsible for calculations,

specifications and engineering estimates; coordinated individual

activities with other groups including equipment suppliers and

construction activities. Provided technical direction and

assigned work to engineers and designers. Reviewed design

documents for compliance with site requirements and assured that

all deliverables met technical adequacy, quality and functional

performance.

04/90 to G.D. Barry & Associates

11/90 (Contracted to Savannah River Site, SC)

North Augusta, SC

. Senior Electrical Engineer: Assigned to the Engineering and

Projects Design Group to support project turnovers. Verified

and updated equipment schematics and prepared Class IE cable

specifications. Reviewed subcontractors' designs and vendors'

documentation to assure activities conducted were in compliance

with SRS directives, policies, standards and procedures.

Project: SRS - Reactors

11/89 to American Engineering and TEC Associates, Inc. (AETA)

04/90 (Contracted to T.U. Electric, Texas)

Santa Ana Heights, CA

. Senior Electrical Engineer: Appointed to T.U. Electric's Vendor

Technical Review Team (February 1990), NRC Commitment in support

of pre-fuel load.

Project: Comanche Peak Steam Electric Station, Unit 1 - Glen

Rose, Texas

09/89 to Bechtel North American Power Corp.

11/89 (Contracted to the Browns Ferry Nuclear Project)

Athens, AL

. Senior Electrical Engineer: Provided modification to auxiliary

power systems which included short circuits and voltage drop

calculations; breakers, fuses and relay coordination studies,

updating power panel schedules and developing engineering

documents to support design implementation.

Project: Browns Ferry Nuclear Project - Athens, Alabama

11/86 to Stone & Webster Engineering Corp.

11/89 (Assigned to Comanche Peak, Texas)

New York, NY

. Electrical Engineer: Responsible for the medium and low voltage

systems (6.9 kV - 125V), control room lighting (Appendix "R"),

the fire pump house electrical distribution system and other

systems modifications. Such designs that required the rewiring

(i.e. external/internal) of control panels, and power

distribution panels with respect to safety and non-safety

requirements as they related to electrical isolation/separation.

Project: Comanche Peak Steam Electric Station, Unit 1 (Glen

Rose, Texas - Nuclear)

04/81 to Ebasco Service Inc. World Trade Center

11/86 New York, NY

. Electrical Engineer: Responsibilities included various design

tasks in power system and I&C.

. Project: Assigned to Texas Utilities, Comanche Peak (1985-1986)

At Comanche Peak, electrical engineer responsible for preparing

material lists/field requisitions, one line, three line, wiring

and connection diagrams, panel layout and cable schedules.

Additional assignments involved the interfacing and coordinating

with various disciplines regarding general review of equipment

"as received" vs. A/E drawings so as to resolve variances that

will be dispositioned as nonconformances. Subsequent

responsibility was to prepare field purchase requisitions for

equipment and spare parts.

. Project: Florida Power & Light Company - Juno Beach, Florida

St. Lucie Unit 2 and Turkey Point (1984-1985)

Assigned duties were to determine quality assurance requirements

for electrical equipment/spare parts. Evaluated and specified

non-safety equipment for procurement. (Commercial Dedication)

. Project: Washington Public Power Supply System: WPPS-3-1240 MW

(1982-1984)

The electrical engineer responsible for field verification of

equipment and to resolve cable termination and electrical

penetration problems. Other assignments involved overhead power

transmission line, sag and tension calculations and updating the

electrical one-line.

. Project: Florida Power & Light (890) MW/Carolina Power & Light

(900 MW)/ Louisiana Power & Light (1165 MN)/Ebasco Home Office -

New York, NY

(1981-1982)

Responsibilities encompassed electrical liaison between the

client, site and vendors, and resolving the day-to-day

electrical problems encountered during plant construction.

Assigned duties were the interpretation of electrical drawings,

the verification of engineering approved tolerances and the

documentation of all electrical field changes. In-house

experience included the update of the power distribution and

motor data sheets and the preparation of calculations (short

circuit, voltage drop, tray overload, etc

ORGANIZATIONS: Institute of Electrical and Electronics Engineers

1983

Texas Society of Professional Engineers

1988

The National Council of Examiners for Engineering &

Surveying 1992

SPECIAL

CLEARANCES: Security Clearance (Ref. Savannah River Site, Aiken,

S.C) 1990-1995.

Handford DOE Site: 2009-Present

References: Bobby Gray(WRPS): 509-438-

2199/Bruce Faubert(AKER):: 801-***-****(916-986-4616)

Gil Ong: 687-***-****



Contact this candidate