RAMIL P. EDULZORA
No.*** B. Bgy.Saim-sim Calamba Laguna
Mobile No. (63-091*-*******/092*-*******
Email Add:acct2e@r.postjobfree.com
OBJECTIVE:
To a part of a company that promote Professional development and provides
Challenging career and opportunities.
To gain working experience in a company that develops skills and ability.
To share my knowledge, talents and skills to the company I work.
SKILLS ABILITY and QUALIFICATION:
Implementation of work and schedule.
General building wiring installation.
Estimate Electrical work as per plan and Design.
Knowledge in Motor control/troubleshooting
Knowledge in Fabrication and welding works.
Trouble shooting electrical Wiring low voltage and high voltage
knowledge in voice/data
knowledge in fire alarm and paging systems
Knowledge in electrical code (PEC)
LICENSE:
License No. 0030250-RME Registered Master Electrician (PRC)
License No. 011********* class 1 building wiring electrician (TESDA)
License No. 30250-3RM Associate Member of (IIEE)
License No. 25-09-044060 (LTO)
P.T.R No. 4597620 (Professional Tax Receipt)
TRAINING SEMINARS ATTENDED:
O.J.T: Pacific Cement Inc. Surigao del Norte : ( MN institute of Technology)
1stClass building wiring electrician : (TESDA)
Refrigeration and Air conditioning technician : (Baptist Mission Philippines)
Computer technician : (Electron Training Center)
3rd Class building Painter : (TESDA)
WORK EXPERIENCE:
I have been working for 15.0 year(s)
Position : Electrical Foreman
Duration: Nov. 1, 2012 up to jan 24, 2014
Company: Eco work inc.under Daruma Construction Corporation.
@ Lima Technology Center and Fcie firt cavite industrial state
Project /Client : Furukawa Automotive Systems/ Mitsuba Philippines
Department: Electrical construction
Position: Senior Building Technician
Duration: April 15,2011-April 15, 2012
Company: Property Maintenance and Gardens Inc.
Km 19 2nd floor tobacco bldg. Ortigas Ave. Pasig City
Project/Client: @Ascendas/Rbf Development Corporation
Department: Engineering tech.
Position: Senior Building Technician
Duration: Nov. 05,2006-April 15,2011
Company: Riscor Engineering and Consultancy.
Quirino Hiway Novaliches Quezon City
Project/Client: Ascendas/Rbf Development Corporation
@Carmelray Industrial Park II Calamba Laguna
Department: Engineering tech.
Position: Electrical Foreman
Duration: Jan 25,2003- Sept.03,2006
Company: FDL Construction Corporation
No. 2 Dizon St. Sangangdaan Caloocan City
Project/Client:@Residentialsbuilding, Commercial and Ware houses
Department: Electrical construction.
Position: Building Electrician (A)
Duration: August 15,1999-Nov. 17,2002
Company: Romago Inc.
No. 36 Cordillera St. Cor Road 1 Mandaluyong City
Project/Client: @ NESTLE PHIL. RCBC Tower and MRT 3
Department: Electrical construction.
Position: Electrical Technician
Duration: May to July 1999
Company: E&L Gentec Ent. Co.
No. 357 Dr. Jose Fernandez St. Mandaluyong City
Project/Client: Phil-am Life Tower
Department: Electrical and voice/Data.
Position: Building Electrician
Duration: April 20, 1998-Oct. 10,1998
Company: OBADC/object builder for Asia and dev. Corp.
Aranga st. Bry. San. Antonio Makati City
Department Electrical Construction.
JOB DESCRIPTION:
BUILDING MAINTENANCE
Proper wearing of (PPE) personal protective equipment before work start.
Daily program of work/Activities for every electrician/ technician
Preventive Maintenance all building Facilities and Equipment low and medium voltage.
Repair and maintain all defective and running Machinery
Motor Controls installation and troubleshooting
Troubleshoot equipment faults and carry out preventive and/or corrective action
Daily checking of all building facilities and equipment.
Monthly checking Generator Fuel/Oil and cleaning of filter.
Monthly re-tightening Lighting and Power panels
Annual re- tightening of Main Distribution Panel (MDP,LVSG HVSG and INSULATION TEST)
Apply correct work method’s and procedures to ensure reliability for safe operation
Ensure all work processes comply with quality, Environmental safety
I perform all duties responsibilities with knowledge and safety
GENERAL BUILDING WIRING INSTALLATION:
Proper wearing of (PPE) personal protective equipment before work start
Work implementation and job assignment of worker
Daily work/Activities for every Lead man and electrician.
Roughing in Lighting and Power and Auxiliary.
Roughing in of Cable Tray and support/hanger.
Roughing in pipe laying Main Feeder Lines and circuits Over Head and Under Ground.
Roughing in PRIMARY LINE/ SERVICE ENTRANCE/SERVICE LINE Over Head and Under
Ground.
Roughing ECB LVSG low voltage switch gear MDP, PP,LP,NEMA 1/NEMA 3R/NEMA 4X etc.
Cable Pulling Auxiliary Lighting, Power and Main Distribution Panel.
Termination of EACB Enclosure Air circuit breaker and LVSG and branch circuit.
Termination of Main Distribution and Branch circuit.
Lighting Fixtures installation and decorated lamp.
Electrical Devices and auxiliary installation.
Commissioning and Testing.
Ensure to all Electrical work and Installation comply with standard.
I perform all my duties and responsibilities with knowledge and safety.
OTHER SKILLS:
Carpentry work
Masonry work
Welding work
Plumbing work
Auto electrical work
Ref and Aircon Technician
Computer Technician
Repair Power tools
Repair small Appliance
EDUCATIONAL ATTENMENT :
VOCATIONAL : 1997-1998- MN- Institute of Technology Surigao
City
SECONDARY : 1994-1997 Surigao delNorte national high school
ELEMENTARY : 1981-1986 Oroc Elementary school Surigao City
PERSONAL DATA :
Birth Date : August 9, 1974
Birth Place : Bayugan Agusan Del Norte
Age : 38
Gender : Male
Civil Status : Married
Height : 5’4
Weight : 116 lbs.
Nationality : Filipino
I hereby certify that the above information are true and correct to the best of my
Knowledge and belief.
RAMIL P.
EDULZORA
APPLICANT