Post Job Free

Resume

Sign in

floorman

Location:
United States
Posted:
February 22, 2014

Contact this candidate

Resume:

AZFAR RAZA

Resume for : FLOORMAN

Objective

Floorman a crew member whose primary work station is on the rig floor; work

includes tripping

pipe (use of slips, tongs and elevators), making connections while drilling;

assisting the

Derrickman; monitoring the shakers which includes mud weight, viscosity and

controlling sand

content while drilling.

Personal Details

Father's Name: Ghulam Raza

Date of Birth: 09-04-1992

Religion Islam

Nationality: Pakistani

Language: English, Urdu

Marital Status: Single

CNIC # 37201-2829914-9

Passport # HN 9899141 (Exp: 10 Dec, 2018)

Contact Details

Address: Village & Post Office Mobile:

Karsal, Tehsil & Distt E-Mail: +92-312-*******

Chakwal. +92-572******

(Pakistan) accsh2@r.postjobfree.com

Work Experience

Organization Designation

Duration

Working with KCA Deutag FLOORMAN 11th Feb 2012 to till now.

Drilling Co (Pakistan)

Worked with POL Pakistan ROUSTABOUT 27th June 2011 to 10th Feb 2012

Oilfield Ltd

Qualification

Intermediate (FSC)

Matriculation

Safety Training & Modules

H2S Safety Training

Fire Fighting Safety

First Aid Safety Training

Work at Height

Rigging & Slinging

Computer Skills:

I have basic computer knowledge

Ms Dos

Ms Windows

Networking

Microsoft Office

Working Skills

I joined Drilling Field in June 2011 to till date. Worked on mechanical,

electrical VFD, SCR Rigs like work over medium, heavy & ultra heavy Rigs.

Worked on workover devited, horizontal & vertical wells in different Oil &

Gas fields.

ST-80 Iron Roughneck 80,00ft /ibs up to 8 OD

Draw works (National, Bomco)

Mud pumps (National, Bomco)

Travelling Block, (National 300,500 ton, Amercan 275,500)

Operation on various pipes handling equipment while making pipe connections,

tripping, testing, etc.

During periods when the drill string is on bottom drilling, assists in

preparing additional drill pipe, collars, or special tools to be run into

the hole. Also at this time, rig floor equipment is examined and serviced.

Tools, equipment and supplies are obtained and made ready for the next phase

of the operation.

Prior to completing the well, the drilling crew is responsible for

retrieving the drill steam and BOP equipment such that the well can be

plugged and abandoned or completed. All equipment is to be returned to its

proper storage location and made ready for us again or replaced if damaged.



Contact this candidate