AZFAR RAZA
Resume for : FLOORMAN
Objective
Floorman a crew member whose primary work station is on the rig floor; work
includes tripping
pipe (use of slips, tongs and elevators), making connections while drilling;
assisting the
Derrickman; monitoring the shakers which includes mud weight, viscosity and
controlling sand
content while drilling.
Personal Details
Father's Name: Ghulam Raza
Date of Birth: 09-04-1992
Religion Islam
Nationality: Pakistani
Language: English, Urdu
Marital Status: Single
CNIC # 37201-2829914-9
Passport # HN 9899141 (Exp: 10 Dec, 2018)
Contact Details
Address: Village & Post Office Mobile:
Karsal, Tehsil & Distt E-Mail: +92-312-*******
Chakwal. +92-572******
(Pakistan) accsh2@r.postjobfree.com
Work Experience
Organization Designation
Duration
Working with KCA Deutag FLOORMAN 11th Feb 2012 to till now.
Drilling Co (Pakistan)
Worked with POL Pakistan ROUSTABOUT 27th June 2011 to 10th Feb 2012
Oilfield Ltd
Qualification
Intermediate (FSC)
Matriculation
Safety Training & Modules
H2S Safety Training
Fire Fighting Safety
First Aid Safety Training
Work at Height
Rigging & Slinging
Computer Skills:
I have basic computer knowledge
Ms Dos
Ms Windows
Networking
Microsoft Office
Working Skills
I joined Drilling Field in June 2011 to till date. Worked on mechanical,
electrical VFD, SCR Rigs like work over medium, heavy & ultra heavy Rigs.
Worked on workover devited, horizontal & vertical wells in different Oil &
Gas fields.
ST-80 Iron Roughneck 80,00ft /ibs up to 8 OD
Draw works (National, Bomco)
Mud pumps (National, Bomco)
Travelling Block, (National 300,500 ton, Amercan 275,500)
Operation on various pipes handling equipment while making pipe connections,
tripping, testing, etc.
During periods when the drill string is on bottom drilling, assists in
preparing additional drill pipe, collars, or special tools to be run into
the hole. Also at this time, rig floor equipment is examined and serviced.
Tools, equipment and supplies are obtained and made ready for the next phase
of the operation.
Prior to completing the well, the drilling crew is responsible for
retrieving the drill steam and BOP equipment such that the well can be
plugged and abandoned or completed. All equipment is to be returned to its
proper storage location and made ready for us again or replaced if damaged.