ROBERT COULTER
*** ******** ****** ********* *** Merritt Island Florida 32953 Phone: 321-***-****
accr45@r.postjobfree.com
SUMMARY: I am a seasoned service and installation technician and I am seeking a position with your company that will
demand from me that I use my experience and skills learned to bring out the best in performance and productivity. I am
dedicated to maximizing workflow and quality through motivation and a strong positive attitude.
SKILLS –ABILITIES: Strong mechanical aptitude, excellent communication skills, Electrical testing knowledge, Residential and
commercial construction, fixtures installation, field installation expert, photovoltaic systems.
EDUCATION: U.S. Army Fort Bragg North Carolina ITT Technical Institute
Maitland Florida
Primary Leadership Development course 1990 Electronics engineering course study
1996
WORK HISTORY:
Florida Bow Thrusters (service and install technician electrical and hydraulic systems) February 2013 – January 2014
The job required about 75% travel throughout North America. We traveled as two man teams servicing and installing our product line. The work
was very specialized because we had to retro fit the systems. As team lead I was issued a company credit card. I was responsible with keeping
expense reports, time sheets, material usage and vehicle logs. These were sent to the home office weekly. Our product line included but was not
limited to bow and stern thrusters, swim platforms, and gyro stabilizer systems.
Zachry Industrial Holdings (pipefitter) January 2012 – November 2012
My primary duties were to follow prints for balance of plans to build pipe systems for condenser platform. We worked in three man teams
consisting of myself a combination welder and a helper. Since this was a government funded project particular attention was paid to safety and
qualifying was essential. As the job came to a close our crew stayed on till the end and made repairs to the entire plant
ROBERT COULTER
Manchester Copper Tubing (production supervisor and systems maintenance) May 2008 – November 2011
Responsibilities included ensuring that we sent only acceptable tubing out the door. Tubing was taken off the line and measured at the wall for a
particular thickness using micrometers, discarding material for recycle back into the system that did not meet the standard. The equipment required
a lot of adjustment and the pace was very fast during production. I also oversaw the preparation and packing of the finished product and made it
ready for shipping. This was primarily a research and development project however much of what we produced was sold. During down time I was
part of a three man team that performed maintenance and rebuilds on the equipment under close supervision of the lead engineer.
Maronda Homes Builders (service and installation electrician) June 2004 – May 2008
Hired as a service and on call electrician my duties included servicing newly occupied homes as calls came in as well as inspections of rough and
trimmed out homes during these fazes of building. Later I was asked if I wanted the position as an install electrician and I accepted that job as it
would increase my income substantially through a piece rate pay program.