[pic]
G SWAMYNATHAN
Email ID: accqoa@r.postjobfree.com
Ph No.: +91-954******* & +91-44-259***** in INDIA
Skype ID:
gurus1954
Seeking assignments in Project Management, Construction Management,
Erection and Commissioning with an organization of repute.
PROFESSIONAL SYNOPSIS
Nearly 36 years of experience in Project Planning, Construction Management,
Installation and Commissioning. Currently associated with Technical Sources
as Site Manager, Kingdom of Saudi Arabia. Adapt in planning, executing and
spearheading construction projects involving method engineering,
development and resource planning with a flair for adopting modern
construction methodologies. Have successfully handled erection &
commissioning of Bonded Nylon yarn plant, Fuel oil Boiler and connected
piping for Polymerization plant, Complete Spinning line for Spindraw
(Unitika), Complete spinning line for Spin draw (Reiter), Nylon Tyre Cord
Expansion & Equipments for Batch Poly etc. Deft in swiftly ramping up
projects with competent cross-functional skills and ensuring on time
deliverables. A keen communicator with honed problem solving and analytical
abilities.
CORE COMPETENCIES
Project Planning & Management
V Evaluating project, identifying and selecting sites, finalizing lease
agreements, and project cost/benefit analysis at project decision points.
V Planing and finalizing of requirements and specifications in consultation
with engineering and design consultants, collaborators and field
engineering coordinators.
V Anchoring on-site construction activities to ensure completion of project
within the time & cost parameters and effective resource utilization to
maximize the output.
V Liaising with external agencies, clients, architects & consultants on
determining technical specifications, approvals for smooth execution &
obtaining on-time clearances.
V Project monitoring and review of project schedule, ensuring cost control
within budget, planning for cash flow requirements etc.
Site & Construction Management/Resource Planning
V Supervising all construction activities including providing technical
inputs for methodologies of construction & coordination with site
management activities.
V Supervising a team of engineers for various types of job and resolving
bottlenecks.
V Liaising with local authorities for clearances and approvals.
Erection and Commissioning
V Handling erection & commissioning of various plant equipments to enhance
capacity.
V Designing layout for installation, erection & commissioning of machines
and equipment.
V Identifying specifications of various machines & equipment, resources;
negotiating with suppliers for cost effective and timely deliveries of
the same.
Quality Assurance
V Preparing and reviewing of Statements and Work Specific Quality Assurance
Plans.
V Ensuring that equipment/materials received are in accordance with the
quantity & quality.
V Technical scrutiny of drawings.
V Implementing QA / QC procedures, Total Quality Management principles and
checks. Conducting Audits to ensure adherence to Quality and Safety norms
across the entire course of project execution.
ACADEMIC HIGHLIGHTS
1976 Diploma in Mechanical Engineering from STATE BOARD OF TECHNICAL
EDUCATION TAMILNADU
CAREER HIGHLIGHTS
Technical Sources
Site Manager
Since August '12 to till date
Project: Sepcom
Sepcom is a Project for the Erection of 2240 MW Gas Turbine power & Saline
Water treatment project which consists of Gas Turbine, Generator, Bypass
stack, Lube oil systems, Water Injection skids, Compressor skids and
interconnection piping, Which consists of 7 units of all stages Supplied
Seimens Germany.
Responsibilities:
> Responsible in allocation of Work to Engineers and Sr Engineers and
monitoring work progression,Reporting and documentation on assignments
completed and was reporting to the project manager .
> Monitoring the progression and plan designing for 3 sites for different
clients .
A & P Paraskavades & Partners. LLC, Dubai (Subsidary of J & P (O) Ltd)
QA/QC Manager
Since Aug'06 to Jun'10
Project : Dubai Festival City, Dubai and Al Raha Beach Devalopment
Responsibilites:
> MEP works Development & Implementation of QA/QC Procedures and
Documentation of the same. Final Documentation of the Project and
submittal.
J & P (O) Ltd., Libya as QA/QC Manager
Jun'00 to Aug'06
Project: Oil Company in Faregh Oil Fields under National oil Corporation
(NOC) Libya.
Responsibilities:
> Functioned as QA/QC Engineer and handled documentation for Civil
mechanical, electrical & instrumentation in erection & Commissioning of
Gas oil separation plant for Waha Oil Company in Faregh Oil Fields under
National oil Corporation (NOC) Libya.
> Functioned as QA/QC Engineer for Electrical & Instrumentation and was
involved in
o Installation & commissioning of OHTL lines of 66kv & 33 KV for
Crude Oil Wells.
o Substation installation & Commissioning of GOSP for Repsol Oil
Operation at Ubari under National Oil Corporation (NOC) Libya with
J&P (O) Ltd.
> Documented the GOSP installation & Commissioning.
Shriram Fibres Ltd., Chennai (Presently SRF LTD)
Jun'82 to Dec'99
Project Engineer
> Joined the company as supervisor and rose to the position of
project engineer
Notable Accomplishments
> Distinction of being involved in erection and commissioning of
o Bonded Nylon yarn plant.
o Fuel oil Boiler and connected piping for Polymerisation
plant.
o Complete Spinning line for Spindraw (Unitika).
o Complete spinning line for Spindraw (Reiter).
o Nylon Tyre Cord Expansion.
o Equipments for Batch Poly.
> Handled erection of
o Equipment in Polymerisation and Monomer Recovery Plant.
o Equipments of Spinning.
o 2000 KVA DG sets - 2 Nos.
o 180 TR Centrifugal Compressor - 2 Nos.
o Reciprocating Compressor - 2 Nos.
o Complete Nitrogen plant.
o Transformer & other equipment of 110 KV substation.
o Equipment piping for complete Effluent Treating Plant.
o Equipment for Automatic Lactum charging unit.
o Draw twisters, Twisters & Looms including Shuttle-less loom.
o Complete Fire Protection system for plant.
o Erection and commissioning of 350 TR Ammonia screw compressor
for A/C plant
o Installation and commissioning of HVAC system for our
Administrative Office.
> Instrumental in managing equipments and piping for steam conservation of
Monomer Recovery Plant
> Distinction of being deputed to
o Germany for dismantling and packing of 40m/min Dipping Plant
including structural - Twisters Looms at Germany.
o Dubai for the
. Erection and Commissioning of Dipping Plant and complete
with structural, sheeting and Dip preparation plant at
Dubai.
. Design, fabrication, erection and commissioning of cord
butt winders with variable speed.
> Played a key role in complete modification of 36 m/min Dipping plant at
Manali, INDIA including Design Fabrication and Erection of a Pull Roll
stand to suit Goodyear Specifications.
PREVIOUS EXPERIENCE
Apr'82 to May'82 Engineering Construction Corporation Ltd (L&T) Erection &
commissioning of 5 mw Gas Turbine for Eastern Coal Fields, Asansol, West
Bengal as Supervisor
Aug'77 to Apr'82 Engineering Construction Corporation Limited (L&T) for
Erection and Commissioning of Pulp and Paper at Nagaland Pulp & Paper Co.
Ltd., as Supervisor
Feb'77 to Aug'77 Engineering Construction Corporation Limited
(L&T) for Erection and Commissioning of Nitric Acid Plant at RCF Bombay as
Supervisor
Jul'76 to Jan'77 Pressteels & Fabrication (P) Ltd., in Reactor
Piping of Madras Atomic Power Project, Kalpakkam, Tamil Nadu as Supervisor
IT SKILLS
Worked as Co-ordinator for implementation of Oracle System for purchasing
and work order systems.
Course in Oracle 7.1 with Developer 2000 in 1999.
PERSONAL DETAILS
Date of Birth: 19th August 1955.
Passport Number: L3793865. Valid till Sep' 2023
Address: F-5 Grihalakshmi Apartments, 472, T H Road, Chennai 600 081. INDIA
Permanent Address: F 5 Grihalakshmi Apartments, 472, T H Road, Chennai 600
081. INDIA
REFERENCES
Name: Mr. Ramesh Kumar Quantity Surveyor
Ph No.: +971*-*******, Mobile +971*********
Address: Al Futtiam Group Real Estate, Dubai