William Wall
Oil & Energy Professional 480-***-****
PO Box 101
Wanette OK. 74878
accoqp@r.postjobfree.com
Summary
Experienced in directing all aspects of project operations, administration,
budgeting and equipment install. Results-oriented leader with a proven
track record of taking problematic situations and turning them around to a
positive outcome for the client. Excellent technical and analytical skills,
organized
with strong attention to detail and proven ability to deliver ahead of
schedule. Analyzes problem, identifies solution and implements changes
needed now to resolve the issue at hand.
TECHNICAL CERTIFICATIONS & LICENSES
PMP TRAINING COMPLETE
IEEE Power Society,,
AZ Lic.# C-11,AZ Lic.# L-11,AZ Lic.# KB-01,
CA Lic, Electrical Contractors License
WA Master Electrician Lic
Microsoft MCSE
AVO Cert. Breaker Maintenance and Calibration
AVO Cert. Protective Relay Maintenance Generation
ACCOMPLISHMENTS
Hanford Terminal Project Drawings Review (Hanford CA)
Barrick Goldmine Project Drawings Review (Elko NV)
Wynnewood Refinery SRU upgrades and ATS unit install
Utah Kennecott Copper Mine Upgrades to Concentrator
Brazil CEITEC S.A semiconductors Design Verification
Potomac River Generating Station IC&E work
5 Unit outages, 3 Major Overhauls on 108 MW Units
ESP upgrades to controls to increase reliability and efficiency
Decommissioned old Stationary Battery Systems
Installed state of the art UPS equipment for NERC compliance
Initiated improvements to Plant compressed air systems
CEMS shelter air needs Saved Company Over $2M in time & materials.
Intel Chandler AZ Fab 32 First Open Ballroom
Cleanroom Tool Install $300 (Million)
Intel Chandler AZ. Fab 12 I&C General Foreman overseeing 50 men
ASU Supper Bowl XXX Sound System on time and within budget
State Farm Data Center on time and under Budget
ASU Center and North Site Dorms Fire Systems
Arco Refinery Demineralizer Skid on time and under budget
Texaco Data Highway Communications Fiber Optics Cable and interface
Mobil Refinery,Gulftronics Seperator Skid, Neworking, Lan,Wan setup
Bioside Skid for chemical injection pumps, tests, and startup. On time and
under budget
Specialties
Design Verification
Contract administration
Planning & Scheduling
QA/QC inspector
Start up & Commissioning
Designer & Retrofits
LSS inspector
Construction coordinator
Maintenance reliability
Risk management
Procurement
Instrumentation & Controls
Electrical specialist
Information systems
Unix, Linux
Windows 3.1,95,98,NT 4.0
Windows 2000 AS,WS
TCP/IP, FTP
Windows Vista, Windows 7
Cisco and Kleever Router protocols
Experience
Electrical Engineer at Engineering Resources Inc
April 2012- Present
Finished current assignment working for TKS in Wynnewood Refinery Oklahoma
New plant addition of ATS plant completed. Retrofit on SRU unit and
interface with new ATS plant completed. New additions include but are not
limited to the following
New Siemens 7 series DCS for both ATS and SRU Units
New UPS system to support all of the above
The replacement of the Most Matrix PLC system in SRU while maintaining
operation of equipment in SRU.
Complete installation of new ATS unit from the ground up
Fiber Optics runs from one end of plant to the other
All Stack emission monitors for EPA
Current Assignment Calsbad NM.
Hanford Terminal and Barrick Goldmine Project, Review Drawings and
Installation Details for both of them.
Presently working with PG&E for the New Primary Service Metering Section
for the Hanford Terminal Project. The Hanford Terminal Project consists of
building a infrastructure to support medium voltage distribution over a 42
acre facility and a tank farm terminal capable of Rail unloading and
loading and Truck Loading and unloading for phase 1. Phase 1 was just put
online 11/21/13 with full power distribution to the facility. Phase 2 will
incorporate the building of a process unit capable of making KTS product.
Finished Terminal portion of project on time and $200,000.00 under budget.
Responsible for all Electrical design layout and installs.
Electrical Field Service Engineer at LARON Inc.
July 2011- March 2012
Working in Controls and Switchgear Division
Apache Nitrogen Electrical and Instrumentation Design for Ammonium Nitrate
silo Truck loading systems, Complete from power pole to silo.
Salt Lake Utah Kennecott Utah Copper Corp. Responsible for managing
Project for improvements to Concentrator. Flotation Secondary Cleaner
Samplers. Additions made to Delta V included the additional wiring and
interfacing of 5 new EJB's, 10 new samplers, and 5 new diverters.
All new I/O modules, power supply, and associated internal interface wiring
To the new terminal blocks. Loops were tuned with the use Delta Tune and
the use of 180 ohm terminators. Loop verification and buyoffs with the
client were my responsibility. Dry runs were made on all systems before
commissioning.
Electrical Superintendent at Lotusworks
March 2011- May 2011
Design Verification in Brazil for CEITEC S.A semiconductors
Electrical and Fire Protection Systems for Base build and Tool Install
Generation of punch list items to be corrected prior to commissioning and
verification of item corrections. Interface with both client and vendors to
bring
closure to outstanding issues.
ICE Maint Supervisor at Mirant
December 2008 -July 2010 (1 year 7 months)
.Managed staff of 12 technicians, ensured a competent and motivated staff
by administrating a timely training and qualification program, conducting
candid Performance Appraisals and providing leadership to ensure quality
work and a highly motivated work force.
.Contributed to an effective safety program by promoting a safety conscious
attitude on the part of all employees, ensuring that safe work practices
are followed, and that a safe and clean work environment is maintained.1940
days without a Lost Time Accident
.Planned, schedule maintenance activities (Preventive, Predictive,
Corrective and Outage) in Primavera, Microsoft Project and managed
electrical, instrumentation, relays, and breakers thru 13.8kv, transformers
thru 230kv, and controls maintenance backlogs with Maximo. Maintained NERC
And FERC and CIP Compliace. New stationary battery backup system with state
of the art digital reporting.
.Coordinated the electrical, instrumentation and controls outage activities
In Primavera including tagging, testing, upgrading, modifications, and
restoration.
.Provided coordination between the Electric and Controls (E&C) Shop and all
other resource areas of the plant, such as Operations, Procurement,
Planning, Fuel & Ash, Combustion Turbine and
contractor support groups.
Project Coordinator (W.W.Enterprises)
February 2008-November 2008
Handled Lighting Installation and Retrofits on 8 story remodel.
Project Coordinator (Intel Corp) Contract Work at Applied Mechanical
June 2006 -January 2008 (1 year 8 months)
.Directed the install of Substation additions and Remote switching installs
from utilities
.Coordinated all trades and contractors to ensure quality installation on
time and within budget.
.Maintained standards set by Intel for buyoffs on all phases of tools
installed.
.Oversaw LSS systems, install responsible for QA/QC of install performed by
various contractors.
.Pre-Inspection of NFPA & NEC code compliance, testing and verification of
system functions, buyoff's with city and governing authorities.
Electrical Foreman-Contract Work at Wilson Electric
October 2005 -June 2006 (9 months)
.Job site: Arizona State University -Mcallister Village; Responsible for
all phase two construction.
.Laid Out installation of electrical work including setup and install of
main switchgear and subsystems, Incoming Feeders to Main Feeder
Transformers, and Feeders from Secondary Side
.Directed test work and buyoffs before energizing equipment.
.Laid out underground installation for main cafeteria, including sub panels
and equipment feeds.
Electrical Superintendent-Contract Work at Elco Electric Inc.
October 2004 -October 2005 (1 year 1 month)
. Managed all phases of Electrical work including all inspections.
. Installed Electrical power systems in: 42 Subway sandwich stores, Simply
Artrageous of Mesa/Chandler
. Retrofit Food Court installs in Nogales & Prescott .
. Walked job, made modification to drawings necessary to implement new
power installs.
. Made modifications necessary to drawings so install would meet code
requirements.
Electrical Foreman-Contract Work at Wilson Electric
July 2003 -October 2004 (1 year 4 months)
Over see construction of new Madison Jail Facility in Phoenix, installation
included all make-up air
units on all five levels and penthouse. Duties included, take-offs from
drawings, all material orders, all lay-out and install of conduit systems
to and from lower to upper levels. Responsible for buy-offs
Phoenix City inspectors. Also responsible for start-up and commissioning of
all make-up air units.
Responsible for design changes,
Electrical Foreman-Contract Work at Hernandez Companies
December 2002 -July 2003 (8 months)
Responsible for overseeing all field work being scheduled and in progress.
Quality Assurance Inspector for all work done by electricians on all jobs.
Job tracking, implementing changes as needed to assure customer
satisfaction and code requirement for city inspections. Pull permits for
all work need and do buyoffs before city inspections. Walk jobs, make
material lists and see to the needs of the crews performing the work in the
field.
IT Technician -Contract Work at Natural Data
September 2002 -December 2002 (4 months)
Assisted in Win2k rollout an APS Deer Valley and Paridise Valley
Facilities. Included, but not limited to the following: User backup using
filsave, ghosting in both mulitcast unicast, and restoration of files and
settings, customer followup and service in Surpise facility.
Decommissioning of old boxes for domation to students. Decommissioning
involved killing ntfs partions verifying
operation of pc's and fdisk.
Sole Proprietor-Contact Work at W.W.Enterprises
February 2002 -September 2002 (8 months)
Entrepreneurial endeavor including consulting and production in the fields
of both computer and electrical industries, Computer Systems/Electrical
Work both involving Installation/Repair, Construction, consultation and
design/implementation.
. Proposed, bid, worked, launched projects and oversaw ventures from
commencement to completion, maintained inventory/ supplies, hired and
maintained competent work force, maintained payroll, bookkeeping tax
records, etc. Met and exceeded proposal schedules and deadlines,
keeping costs to a minimum saving both client and company unnecessary
expenditures hence/thus realizing quality as well as solid value. Adhering
to the/keeping within the original bid cost as much as possible.
Life Safety Systems Foreman-Contract Work at Kortman Electric, Inc.
2001 -2002 (1 year)
Arizona State University, Design Layout, Installation, and trouble shooting
of fire & life safety systems for both North and Center Dorms on ASU Campus
Electrical Contractor W.W.Enterprises
Jan 1999 to Jan 2001
Sole Proprietor Contract work in Residential, Commercial, and Industrial
Projects.
Job Foreman-Contact Work at Lafferty Electric
December 1997 -December 1998 (1 year 1 month)
Scheduled workers per job requirements, materials, orders, tool up for all
manpower, safety onsite
per OSHA.
. Met and coordinated construction with all sub-contractors, bringing in
job under deadline.
. Brought project to completion prior to deadline.
I&C General Foreman at Wilson Electric
December 1994 -December 1997 (3 years 1 month)
Coordinated efforts with Holder Construction and State Farm in the
construction of the State Farm Data Center. From the cradle to the grave,
site survey, all underground duct banks and pad concrete pours. All
Generator sets and Controls, Main Switchgear and backup power systems,
Coordinated efforts with TDC and INTEL in construction and installation on
levels 2, 4 and 5 in the
Fab 12 Building.
Scheduled personnel hours as well as project time spans and forecasting
completion dates with emphasis on cost reduction, meeting specifications
and deadlines while maintaining quality workmanship, and safety in the
workplace. Managed inventory and materials as well as ordering and keeping
materials needed for the job on hand and available.
Supervised and oversaw construction from beginning phases to completion and
assured duties would be performed in an efficient timely and professional
manner. Deciphered company drawings and engineered own Asbuilts and redline
drawings. Determined, procured and consistentiy reviewed manpower
requirements to assure maximum work performance while bearing in mind
budget restrictions. Met and exceeded schedule dates for turnover to Intel
complete.
ASU -Sun Devil Stadium -Tempe, AZ: Project: Superbowl XXX Sound System
General Foreman
Coordinated efforts with D.L. WITHERS and ASU involving the complete
renovation and installation of new sound system designed for use in
Superbowl, XXX. Determined and scheduled work force needs as well as phases
of work. Procured and maintained job materials with regard to cost and
budget Oversaw and supervised construction in all phases from commencement
to completion. Produced Asbuilts and redline drawings.
Met and exceeded all goals for scheduled completion for turnover to ASU for
FIESTA BOWL and SUPERBOWL xxx.
General Foreman
Assisted Craig Cederstrom taking over lighting, fire alarm systems and
security networks for building's 580 and 531.Mcdonnel Douglas Helicopter
Plant
Capital Projects & Startup Foreman at Seco Indutries (Mobil Oil & Texaco)
April 1994 -November 1994 (8 months)
Upgraded existing 2300v switchgear, interface dc controls for MCC,
interfaced on board DCS Honeywell TDC-3000 systems Made necessary hot
cutovers on new instrumentation, Hi-pot and terminated 2300v cables.
Perform startup and commissioning of new systems & assist Mobil Oil in
debugging of existing loops.
At Texaco clientele location was responsible for all underground conduit
grounding, switch-rack installation and 2300volt switchgear tie in and
terminations.
Turnaround Electrician (Powerine Oil Co.) Contract Work
(Atlas Resources)
January 1994 -February 1994 (2 months)
Provided and installed temporary power to critical loads coming from
substation J. Shutdown and PM of main breakers on high side of
transformers. Routine inspection, testing, maintenance and repair of all
secondary MCC systems.
Electrical & Startup Foreman at Instrument Specialist Company (Arco Oil
Co.) Contract Work
July 1993 -January 1994 (7 months)
Oversaw new construction projects from the ground up.
Installed LAN network including five substations for telecommunications
interface from telephone to fiber optic multi/conductor cables.
Installed all necessary power and telephone cable, underground and overhead
conduit installation, test and startup.
GULFTRONICS SEPARATOR SKID from the ground up including startup and
commissioning.
Developed BIOSIDE SKID, installed new chemical injection pumps, and
performed testing and startup procedures performed complete installation of
Sulfur Tank Upgrades, emergency shutdowns, bypasses and venting to
atmosphere.
Computer Designer, Builder, and Repair Technician at W.W.Enterprises
April 1993 -July 1993 (4 months)
. Computer troubleshooting abilities down to board-level. Hardware
interface diagnostics skills include preparation ranging from new
installation to earlier model system repairs and upgrades.
Have working knowledge of installation and configuration of Fiber Optics
cables and relay stations. Interfaced with fiber optics cables to computer
peripherals, hardware application. Basic/rudimentary
knowledge of splicing. Qualifications include ten years hands-on design and
construction of complete computer systems; software installation and
troubleshooting including configuration on
installation, software conflicts and debugging. Efficient in systems using
Windows 3.1, 95, 98 as well as possessing extensive knowledge of Windows NT
4.0 and Windows 2000 AS and Windows NT 2000 WS (Workstation) UNIX and LINUX
. TCP/IP,FTP Protocols,as well as Netware and Cisco Network configurations
and installs.
QA/QC Inspector (Mobil Oil Co.) at American Instruments -Contract Work
April 1992 -April 1993 (1 year 1 month)
Proofed engineer-submitted blueprints and made corrections accordingly
prior to construction of wiring of equipment. Performed field checks for
proper installation and code requirements and specifications as well as
loop checking and verification of all wiring for proper terminations and
operation. Document changes made and redline drawings for engineers as-
builts, Verified calibration reports submitted by the instrumentation
department Buy off loop and commission it into service; function test loop
back to control console for proper operation. Submit final reports to
client for final buy off. Maintained work performance files at client
disposal for reference.
Electrical Specialist (Mobil Oil & Texaco Oil) Contract Work at Instrument
Specialist Company
February 1991 -April 1992 (1 year 3 months)
Troubleshoot all new installations for proper operation prior to startup.
Rectified errors and redline drawing mistakes by engineering department.
Made modifications to control schemes possessing specialized knowledge of
switch gears. Supervised installation of underground duct bank consisting
of six three-inch conduits which run a distance of thirty-two hundred feet.
Assisted in the feeding of wires through conduit. Conducted final tests of
cable before term. Installed new 4160v switchgear and Hi-pot new buss prior
to tie in. Hi-pot all cables prior to termination. Rewired existing control
scheme to customer requirements and tested controls for proper operation.
Configured new PLC controllers for main shipping pumps as well as wiring
and testing all field devices in main shipper program. Dry ran PLC logic
for proper sequence of all interlocks before actual startup.
Check alarm sequence in main control house for proper operation.
Programmed main switchgear overloads using lQl000 technology.
Setup and tested CT's for proper phasing and pump motor for rotation.
Commissioned new shipping pumps.
Sole Proprietor-Contact Work at W.W.Enterprises
May 1990 -February 1991 (10 months)
Electrical Construction, Residential, Comercial,and Industrial
Electrical Foreman-Contract Work (Arco & Mobil Oil) at Southwest Veco
August 1987 -May 1990 (2 years 10 months)
Plant and Refinery Electrical Foreman, responsible for maintenance, new
construction and refinery revamps. 15 employees were under my supervision.
Responsible for the demolition of outmoded equipment in alkylation unit and
oversaw installation of new equipment conduit and wire in alkylation unit
and conducted testing and startup of the new equipment
Revamped crude unit #1, including modification of existing switchgear.
Installed new motors and control circuit and performed diagnostics and
startup procedures for local and remote operations.
Plant and Refinery Electricial Foreman at Edgington Oil Co.
August 1984 -August 1987 (3 years 1 month)
As contracted to Edgington Oil was responsible for refineries at Edgington
Oil Co. and maintenance of Long Beach facility and Signal Hill facility.
Handled all electrical maintenance and construction including all 4160v
switchgear and motors to I000HP reduced voltage as well as all 480v
controls motors and transformers. Maintenance scope also consisted of UPS
systems from Lor-Tec and Exide series 1000-Skva. Responsible for backup
generator and emergency lighting as well as that of boiler controls (6
total)
and all loading and shipping pumps.
Electrical Foreman-Contract Work (Xerox Corp) at Western Industrial
August 1983 -August 1984 (1 year 1 month)
Provided design, installation and renovation of all machinery and/or
fixtures as well as major renovations. Calculated power requirements for
computer installations. Assessed and made necessary renovations to assure
proper operation requirements were met. Provided maintenance for high
voltage control.
Electrical Foreman (Southern California Edison) at Electrical Systems
Testing
October 1980 -August 1983 (2 years 11 months)
Duties included:
Electrical renovations, construction and maintenance work performed mainly
on Southern California Edison plants. 4160V switchgear installation and
modifications to existing controllers and 480v air breakers. Calibration
and testing of all the above equipment. Worked on various electrical
renovation/construction projects including power plant overhaul, repair
and calibration. Projects at local oil companies, and renovation and
construction projects at utility plants and other heavy industrial plants.
Involved with the overhaul 4kv, 480v circuit breakers, switchgear, and
motors. Installed conduit up to 6", and installed and terminated cables up
to 4kv. Made revisions to existing protective relaying and control schemes,
completed required tests after modifications and corrections to blueprints
and drawings.
Education
Lamberhurst University
BSEE, Electrical Engineering, 2001 -2005
Collins College
Associates, Personal Computer/Network Technology, 2001 -2003
University of Phoenix
MCSE, Microsoft Certified Training, 2000 -2000
DEVRY INSTITUTE OF TECHNOLOGY
ELECTRONICS, 1977 -1979
Interests
Rebuild and Design Computers and Software
Car and Truck Restoration
Travel