Alan Kapalka
Margate, Florida 33063
Contact Information: Tel: 954-***-**** Email: accjka@r.postjobfree.com
Mr. Kapalka is a skilled senior manager looking to secure a position as an
Executive or Senior Manager that would challenge my skills and experience
in helping an organization provide a service that will make a contribution
in a better life for others.
He has successfully completed engineering/construction services projects
whose gross value totaled upward to $80 million dollars and assisted in
projects over $2 billion dollars for all types of contracts such as fixed
price, time and materials, cost plus, cost fixed fee,
incentive/disincentive, design-build and other variations. Frequently
thinking out of the box to resolve issues, his responsibilities include all
matters pertaining to the project and its successful execution in
accordance with the contract to include worker's health and safety,
quality, quantities, schedule and business financial goals. The dedicated
mentoring of his team allowed for increased growth of team spirit and
performance to achieve project goals with reduced stress and burnout.
Client satisfaction, quality performance, safety, financial accountability,
and successful time management has allowed him to achieve good client
relationships and the attainment of projected gross revenue without
infringing on safety or quality of the deliverables.
He is highly computer literate in project controls and financial analysis
where he strives to minimize risk to mitigate potential claims. Over the
years his accomplishments encompassed versatility in multiple areas of
business including Heavy Industries (Power), Information Systems,
Environmental, Water, Transportation, and other Facilities.
Complementing the program/project management skills are a high level of
Quality Assurance management of ISO 9001 Quality Management Systems on a
state and national level.
Skills Profile
Project Management/Construction Management at Risk/Value Engineering - PMI
PMBOK
Contract Management - EPC, fixed price, time and materials, cost plus, cost
fixed fee, and design- Project build including supervision of Union
Personnel
Project Controls - Primavera (P6, Contract Management, Contractor), &
Microsoft Project
Enterprise Resource Planning - SAP (CRM, HRM), JD Edwards, Deltek, Oracle
Relational Database Design and Management - Oracle, Access
Asset Management
Emergency Management - FEMA ICS-100 (IS-00100.b) Introduction to Incident
Management System
Quality Assurance - ISO 9001 Quality Management Systems
Geographic Information Systems Design and Application
Security Systems - Low Voltage CCTV & Access Control
Basic knowledge of networks, data rooms, air-blown fiber, and design of
websites
Qualified Stormwater Management Inspector - Florida Department of
Environmental Protection
Finite Element Analysis, Piping Stress Analysis and Structural Support
Design - Autopipe, Caesar II, GT Strudl
Construction Engineering and Fabrication of Piping and Related Components
Radiation Safety, RSO
Computer Graphic Applications - MicroStation and AutoCAD, Scanning and
Image Processing
Microsoft Office Professional (Word, Excel, PowerPoint, Access), Visio
EXPERIENCE
Quality Assurance
. As Quality Manager achieved ISO 9001 certification for the Florida &
Georgia Offices of AECOM through quality training and Internal Audit
management. Oversight, corrective action, and enhanced update training of
the quality program ensured that the offices remained compliant.
. As the acting Regions Quality Assurance Manager for the Libyan House &
Infrastructure Program in Tripoli, Libya prominent relationships were
groomed within the Libyan government to successfully managed client
expectations to streamline the quality and approval process to increase
productivity and quality. Guided the foundation of their quality program
for a 24 km multi-lane thoroughfare with several interchanges to connect
to other major roads in the area.
Energy Generating Facilities - Design & Construction Domestic & Abroad
* In the US, accomplished the successful Project Management (EPC) for power
& process piping and equipment in accordance with ASME B31.1, B31.3, NDE,
AWS, and AISC. Supervised the manufacture of piping support components to
include forgings, punching, cutting, fabrication, welding, coatings, and
assembly. The successful execution of new construction (gross revenues
exceeding $2B dollars assisting) and outage enhancement projects at over
twenty-five electrical generating (power plant) facilities resulted in
increased electrical generating capacity, upgraded service, increased
reliability, and safety throughout the life cycle process of the
facilities. Client satisfaction resulted in repeat business and an
increase in gross revenues. Examples of services provided included total
project management, marketing, estimating, scheduling (Primavera),
design, construction, and inspection at the various facilities in
accordance with existing standards and procedures.
* Successfully administrated the localization contract for the manufacture
of components and design calculations for power piping systems in Seoul,
Korea in support of the country's electrical generating production
efforts. Indirect benefits resulted in the enhancing of relationships
between various cultures and personalities to work toward a common goal
and objective. 50 Korean Engineers achieved competent training and
experience by my efforts in the areas of piping analysis and structural
design.
Facilities Management & Planning - Energy Generating & Transportation
Facilities
* Effectively designed a facility management plan for the Puerto Rico
Electric Power Authority's (PREPA) Palo Seco plant, identifying all site
real estate and use under present and future conditions. Through the
client satisfaction generated with the preparation of this plan, its
successful completion culminated in it being the facility management
model for all of PREPA sites throughout the island and thereby increasing
our client backlog and gross revenues.
* Developed a facility management database for a SCADA system at Louisiana
Power and Light to allow for documentation and tracking of inventory,
components, and subcomponents to enhance customer service.
* Supervised and designed a construction planning schedule for the Metro-
Dade Aviation Department in Florida, for Concourse A at Miami
International Airport.
Information Systems
* Technical support of Aconex document management system making
recommendations for project work flows and user considerations.
* Technical support and applications development to successfully implement
GIS files for Barnstable, Massachusetts, and Dover, New Hampshire
allowing shared data access to municipal departments. Shared data
included coverage's for wells, surface water sources, groundwater
sources, contaminants, and major and minor roads. (MicroStation)
* Technical support to expedite the supplement of a geo-data file to manage
areas throughout the state for potential new water sources at the
Massachusetts Water Resources Authority was completed. By achieving this
task it maximizes the use of survey information gathered during
environmental assessments also increasing analysis and
productivity.(ESRI)
* Database development of an asset management system for Louisiana Power &
Light to allow for documentation and tracking of inventory, components,
and subcomponents to enhance customer service for their supervisory
control and data acquisition (SCADA) system including software
validation. (Oracle)
* Working knowledge of network hardware installations including Bicsi
requirements for data rooms, air-blown fiber installations, and basic
design knowledge of websites including languages such as html and php.
Stormwater Drainage Improvements - Roadway Reconstruction Hazard Mitigation
Design & Construction
* Effectively administered total program management for the design and
construction of 400 street drainage improvements to include street
resurfacing, street reconstruction, stormwater drainage improvements, and
the design and dredging of nine miles of secondary canals throughout
Miami-Dade County, Florida. Successfully managed all contracts associated
with the work, which was completed using $80 million in FEMA funding,
including surveying, geotechnical, design, construction, and inspection.
Over 50 companies held contracts that were administered in the execution
of the work. The projects were meticulously organized to ensure no
downtime between subconsultant's tasks and the progress of the work. As a
result of the successful completion of the work the drainage in Miami-
Dade County was substantially enhanced. This increased safety and
mitigated the threat of flooding to the general public.
Environmental - Design & Construction Wastewater Pump Station & Force Main
Installation
* Construction management services for the modification and installation of
15 pump stations and several miles of force mains in the metropolitan
Dade County was successfully implemented to increase flow of improvements
as mandated by consent decree from the State of Florida. As a result it
helped to reduce possible fines incurred by the County due to non-
compliance.
* Project/construction management services through peer review of the
following water projects; Collier County Water Treatment Plant and well
field construction, Marco Island Water Treatment Plant well field
construction, Seminole Brighton Water Treatment Plant, Seminole Hollywood
Water Treatment Plant.
* Updated design plans for the redesign of the storm drainage and sewer
system to comply with the current codes were furnished in order to bring
the Metro Dade County Solid Waste Management Department's North East and
West transfer stations back into compliance according to the findings of
the Department of Environmental Resource Management.
Transportation - Roadway & Bridge Construction Management
* Construction administration for a $26 million construction engineering
and inspection contract for the Florida Department of Transportation,
which consisted of bridge construction, noise wall installation, paving,
milling, resurfacing, canal relocation, interchange configuration, LWDD
canal revetment, and major drainage installation successfully resulted in
increased vehicle capacity along a section of SR7 in Boca Raton, Florida.
* Effectively administered a $28.6 million construction inspection services
contract at Miami International Airport supporting an increase of airport
capacity through an extension the upper and lower vehicle drives. Other
appurtenances included the construction of a fire sprinkler system, a
sewer pump station, and underground utilities critical to improvements at
the South and MIA terminals, as well as columns and foundations for the
future automatic people mover system.
* To increase the safety of the public entering Carnival Cruise Lines in
Miami, Florida, the construction of a right-turn deceleration lane and
other entrance improvements was successfully completed.
Construction Assessments & Reviews
* Successfully prepared a report to provide associated replacement costs
for various facilities damaged by Hurricane Andrew on the Florida
Turnpike for the DOT. The report made recommendations for repair and
included photographs and video with narration of the damage to
substantiate all work in which the FDOT subsequently securing Federal
Funding for repair/reconstruction.
* Authored the development of a report for the study and implementation of
automation techniques at the construction resident offices of the Florida
DOT which later became a standard at which the FDOT has improved the
quality of construction, increase productivity through the reduction of
duplication, automated tasks, reduce paper work, and reduce claims and
court fees.
Building Design & Security
* Design Management of a Fire Station in an existing facility for the
Seminole Tribe of Florida was successfully completed. It provided a
conceptual design based on a client needs assessment in order to make
maximum use of existing properties that have been underutilized.
* Assisted in the Construction of a Charter School for the Seminole Tribe
of Florida to include site monitoring, safety, and the installation of
security and fire systems.
* Supervised the build out of the Metcalf & Eddy Office in Sunrise, Florida
to include total gutting and rebuild. Trades included mechanical,
electrical, plumbing, infrastructure, interior roughing and finishes. He
participated as the company liaison for the build-out with the Owner and
the Sunrise building department as required. Approximate cost $500K.
* Managed the designs of a state of the art low voltage security
surveillance and access control system for 20 sites/facilities for the
Seminole Tribe of Florida. The resultant designs culminated in a standard
basis of design concept that utilizes over the counter non-proprietary
products thereby reducing the initial cost in hardware and maintenance.
Construction drawings and specifications were successfully delivered
along with initial estimates for construction. Construction management
services were provided as needed.
EDUCATION
BS, Civil Engineering, Roger Williams University, 1980
Coursework, Architectural Engineering, University of Miami, 1977
AS, Architectural Engineering, Wentworth Institute, 1975
REGISTRATIONS
Quality Assurance Lead Auditor ISO 9001
40-Hour OSHA Health & Safety Training, First Aid & AED
Emergency Management - FEMA ICS-100 (IS-00100.b) Introduction to Incident
Management System
Sumitomo Electric Air Blown Fiber Design and Estimating
Qualified Stormwater Management Inspector, FL
Q Clearance (inactive)
Notary Public, FL
NAUI-Certified Diver
YEARS OF EXPERIENCE
Self: July 2009 - Present
AECOM (Metcalf & Eddy): June 2002 - June 2009
Shaw Group (Stone & Webster Engineering): March 1982 - January 2002
Corner & Lada Company: November 1977 - March 1982
PROFESSIONAL ASSOCIATIONS
American Society of Civil Engineers
Project Management Institute - past member
American Water Works Association - past member
ASIS International - Security Management - past member