Post Job Free

Resume

Sign in

Manager Project

Location:
Decatur, TX, 76234
Posted:
February 06, 2014

Contact this candidate

Resume:

Billy j. Shurbet

*** ******* **** **** ******* Texas, USA 76234

Cell phone (001) 940-***-****

Home phone (001)940-***-****

E-mail address, accjbh@r.postjobfree.com

Well Site Drilling Supervisor at present

Operations Manager Contract Drilling 2

Rig Superintendant 2 year

Rig Manager 5 years total.

Driller 5 years total

Derrick man 2 years

Floor man 3 year

Education and training

K&M extended reach horizontal course participation Nov 2012

Powered Industrial truck, Forklift

Well Cap, IADC accredited well control surface stack supervisor level

certificate

First Aid and CPR

Purchase order and Asset training completed February 2005

Safety Leadership, completed February 22, 2007

IDM Unico drive touch screen, auto drill, hydraulics November 2007

Safe Start Performance, December 8, 2008

Nabors Cyber Chair P.A.C.E training June 23, 2006

IADC Rig PASS April 26, 2008

Hand Held Multi Gas Detector certification May 29, 2009

Essentials for Enterprise Excellence November 2, 2008

Have current U.S. passport expires 12-17-2017

Sherriff's clearance valid since December 11, 2007

International driver license, expires 10-26-2013

Sea survival training from GTSC Musaffah

Hydrogen Sulfide awareness including SCBA, Egress cylinder, Emergency

escape pack

Code of Business conduct training May 2012

Environmental Induction Feb 2012

International Bribery and corruption Global addition May 2012

Anti corruption Manual Training CBT May 2012

Completed training of 8 GEMS

Previous Employment and References

Billy Shurbet Consulting LLC.

Working as Drilling Supervisor for Apache Corp Permian region. Horizontal

well drilling. Including shallow TVD horizontal wells. Previously worked

for Apache Corp World Wide New Venture Drilling exploratory drilling of oil

and gas wells. Drilled extended reach horizontal in Kansas while

underbalanced using Geo pilot, MWD, PWD, HCIM and drill doc tools! Run anti

stall tools and vibrations testing tools. Maintaining constant

communication with Geologist while geo steering. Drilled exploratory wells

in Montana and run coring tools without any non productive time! Working to

set up new ventures and establish vendors and suppliers to perform remote

drilling operations from spud to completion. Maintain relations with oil

and gas boards and report as needed. Manage operations of drilling and rig

performance. Improve and streamline performance for cost effective

drilling. Trouble shoot down hole and deal with routine aspects of drilling

from surface, cement to end of well casing run. Then turn over to

completions and continue to assist with frac preparations and production.

Strong assets include organization and efficiency, and reporting. Have a

strong background in safety and push for zero incidents or injuries.

Weatherford Drilling International

October 2007 to September 2012

Operations Manager Kenya base new venture drilling. Prepare and ship rigs

international and comply with customs difficulties, Import and export rules

and regulations and maintain time line for spud. Exploratory drilling from

36 hole to 8 hole sizes with rapidly increasing pores pressures with no

well control issues using precautions and good drilling practices. Wells

were drilled in Turkana lands of Kenya while maintain local relations and

utilizing national labor with zero incidents and excellent safety record.

Remote location project 250 kilometers from Nairobi. Scheduling of rig

materials, critical spare parts, workers, cost control and overall

performance and flights to and from field! Maintaining rig assets in

working order and ensuring accuracy of equipment onsite. Working with local

authorities to ensure operations are in compliance with local laws. Control

of contract and billing rates for services rendered. Ensuring financial

duties for contract versus equipment to prevent any lost revenue, Tubular

cost tracking and maintenance, rebilling of services, rebilling of non

contract equipment and rentals. Reviewing and adjusting for quarterly

budgets. Recruiting and training of workers required to perform operations.

KPI tracking to improve overall performance! NPT tracking and corrective

action to increase net profit for operations!

Rig Superintendant in Char Kajal, Bangladesh. 2000hp rig, drilling for

Chevron Energy, Job duties consist of crew management. Leading safety

meeting, stop work authority, safety audits, preventive maintenance

scheduling, writing and reviewing procedures, Cost control and managing

time lines set by customer. NPT tracking and maintaining KPI's to steadily

improve overall rig performance. Other tasks are materials procurement for

rig, maintaining customer client contract obligations.

Previously working as Sr. Tool Pusher, work over and completion! Working on

1500 and 2000 HP ac Unico drive, cyber chair rig.

Job operations in Hassi Massaoud field Algeria Africa include de

completion, work over, and side track in new formation. Most tasks listed I

have become very efficient in. Such as DST operations, Side tracking for

short radius curves with up to 65 degree dog leg severities and extended

reach horizontals with underbalanced drilling, Milling of liner operations,

numerous fishing jobs, Packers, running casing scrapers, string magnets,

junk baskets, assorted style of mills and various bits, Cementing and

displacing of fluids, DST operations, Running expandable liners and casing

patches, Underbalanced drilling and flow testing, journey management,

writing and reviewing Job Safety Analysis and Standard Operating Practices,

tubular tracking, inventory control, cost control, high pressure testing of

equipment, work permits, safety drills, rig move scheduling, lift gear

inspections and more.

Daily operations have to be thought out far in advance. Sr. tool pusher is

responsible to maintain contractual obligations for tools and equipment on

rig site, and to follow program provided and allow for substitutions.

Shortage of materials and equipment can lead to down time. Working with

many nationalities to achieve the goal and run our rig with no accidents

and less than 1.8% NPT based on 320 days revenue each year.

Working on today's rigs has given me excellent computer skills working with

Micro soft office and excel. Very efficient in typing and basic computer

knowledge!

Nomac Drilling Inc

From 7/2007 to 9/2007

Rig Manager

Searcy, Arkansas, Fayetteville shale. Worked on Crown 750 and 900 scope up

doubles. Kelly rigs and some had Varco tds10 top drives on them. Oil base

mud and preset surface of around 3 thousand feet. And total measured depth

of 8 thousand feet open hole horizontal drills.

Goober Drilling Corp

Rig Manager

Rig equipment was Draco sling shot mechanical rig 1000 Hp, Triple mast with

Varco TDS 10 top drive. Drilling extended reach horizontals in the Barnett

Shale. Rig was a Ross Hill SCR operated with Hawk jaw iron roughneck.

Nabors Drilling, USA.

From 2002 to 2007

Rig Manager on F-06 in North Texas drilling horizontal wells in the Barnett

shale! Experienced with Cyber chair 1700 HP AC drive equipment! Rig

equipment in use was Varco ST-80 iron roughneck, Pragma automated catwalk

system, Rotating mouse holes, Derrick mounted casing stabbing tools, Canrig

500 ton top drive, Hydraulic winches and lift such for BOP, Mast, and Sub

base.

Previous Nabors rigs included Mechanical, Ross Hill SCR electric with

Canrig top drives and Kelly. Some were box on box and other were sling shot

type. I started out as floor man, and then onto derrick man until a

drilling position was available

I had taken a drilling job first of 2003 on a mechanical rig with Nabors

drilling USA. I was promoted to Tool pusher by the first of 2004 on a

diesel electric rig with top drive. In the spring of 2005 I was sent to

Houston to assemble and place and operate the first F-series rig for

Nabors. Rig was placed in the Barnett Shale and a top ten contender for

Devon Energy. Know for safety, minimum down time and low days on the well

with consistent rig moves. This was my first experience with a new build

from paint to in field drilling.

D.H. Blattner and Sons Incorporated

From 1997 to 2002,

Job description, Blast Hole Drilling Foreman

Started out as driller and soon was drilling fore man over multiple air

drilling rigs in Texas from north to South drilling blast holes for

Aggregate Mines.

Job duties required the organizing of equipment and maintaining time lines

for required jobs. Developing and implementing safety policies and cost

control. Ensuring the employees were trained and complied with OSHA and

MSHA safety regulations. Scheduling of trucks and cranes for equipment

moves!

Drilling practices consisted of high pressure high volume air drilling with

multiple types of down hole hammers and the use of fishing tool when

equipment was lost in the hole. Rig air packages consisted of 1050 CFM at

350 psi constant to run pneumatic tools. Started out as a driller on

multiple types of equipment in 1997 running Ingersoll-Rand, Gardner Denver,

Drill Tech rigs and worked my way up to foreman position in 2000! A total

of 5 years drilling experience which was easily related to the to the oil

rigs!

Steinberger Drilling Company

From 1993 to 1997

Worked position of floor man and then worked as a derrick man. Rig was

stacked out as gas prices fell to an all time low. Drilled turn key work

into the bend conglomerate zones in north Texas. Rigs operated were heavy

double derrick with 500hp draw works. Duplex pumps and worked seven days a

week with no days off. Rig was a basic mechanical with cat heads and

spinning chains. Excellent way to learn hard working ethics and build a

future for the industry!

References

Luke Lawrence (001) 281-***-**** Apache Corp, worldwide drilling manager,

New Ventures!

Alan Vasicek (001) 713-***-**** Apache Corp, Worldwide Drilling Manager

Stan Rodgers (001) 512-***-**** Apache Corp Project Manager

Steve Mc Donald (001) 918-***-****, Consultant for Devon Energy

Louis Jackson (001) 405-***-****, S. Texas Drilling Foreman Devon Energy

Sean Wilcock +254(0)717 391 355 North and South Africa County Manager

Kees Van Vredes +971-****-**** Weatherford Drilling Intl. Country Manager

Sub Sahara



Contact this candidate