HKA Enterprises (Oct 2012 - Present)
Anderson, South Carolina
* Electrical Controls
* Maintaining equipment
* Installation of new equipment
* General electrical maintainence
* Trouble shoot devices and motors when necessary per preventive
maintenance and standard maintenance procedure, replacing parts if
needed with the intentions of minimal down time as possible
* Install and work on equipment while energized with appropriate safety
equipment and proper precautions being taken on a daily basis
Shaw Construction (Oct 2010-Oct 2012)
Cliffside, North Carolina
* Industrial electrician, new construction for coal burning power
facility
* Installation of multiple size conduit, equipment, cable tray, etc...
* Duties consist of installing cable tray, bending conduit and
installing in duct banks as well as throughout facility
* Pull in cables ranging from high voltage cables (6.9,13.8, 4160 thru
#22 and below power, control, and signal cables)
* Build stress cones if needed read drawings and make all proper
terminations required by drawings, verify work is correct, fill out
paper work as required verifying work is correct and complete
* Set equipment such as switch gears for high voltage cables, DCS
cabinets, transformers, MCC's etc...
* Keep and maintain all proper safety training certifications as well as
equipment certifications
* Attend weekly and daily safety meetings, work and maintain job safety
according to OSHA standards on a daily basis
* Install and work on equipment while energized with appropriate safety
equipment and proper precautions being taken on a daily basis
* Transferred to commissioning/startup for instrumentation and controls
8-15-11 to present
* Obtain P&ID's for a particular system showing all devices, motors,
transmitters, valves, TE's, etc...
* Perform a wire check per the device and or motor from DCS/electrical
room to the device itself, verify that all terminations are correct
according to the wiring diagram and that the wire is labeled with the
proper label
* Use 375/475 device for calibrating transmitters and motors such as
MOV's, flow valves, flow transmitters, and PIT's
* Use of low and high pressure pump used to set high and low alarms for
pressure switches
* Once devices/motors are confirmed out in the field as in proper
working condition and all proper valves have been stroked it's tagged
as being commissioned and is ready for a start at the appropriate time
* Trouble shoot devices and motors when necessary per preventive
maintenance and standard maintenance procedure, replacing parts if
needed with the intentions of minimal down time as possible
TA Services Group (Nov 2009-2010)
Albany, GA
* Commercial and industrial control electrician
* HVAC controls, new construction as well as service work to existing
facilities
* Troubleshoot heating and air units, chillers, drives, air handling
units, etc...
* Instillation of new equipment as well as demolition of old equipment
* Instillation of conduit, pull in all power sources as well as control
wiring, terminate wiring and verify all equipment is operating
appropriately
Electrical Foreman (Jan 2008 - Feb 2009)
Fluor, Greenville, SC
* Responsible for 8-10 person crew
* Foreman responsibilities consisted of time keeping, assigning work
detail, attending project meetings, conducting weekly safety meetings
* Performed electrical duties for plant maintenance and shutdowns (2)
* Both shutdowns consisted of high voltage as well as low voltage
wiring, terminations, cable tray, and conduit installation, and plant
maintenance throughout the year
* Both projects completed before deadline and without any safety
violations
Industrial Electrician (July 2007 - Jan 2008)
AMEC/Kamtech, Tucker, Georgia
* Installed temporary power for offices, tool and job trailers
* Performed electrical duties for scrubber project at Plant Wansley
(coal burning power generating facility)
* Installed conduit, cable tray, cable bus, motors, and machinery
* Pulled low voltage and high voltage wiring and completed high voltage
testing using hi- pot machine ensuring cable had not been damaged
during the pulling process completed by making any and all proper
terminations.
* Prepared stress cones for high voltage cable (4160 volts), (13.8
volt) and terminated in power supply switch gears
* Set all 13.8 volt switches and 4160 volt switches for primary power
connection to be performed by utility company
* Completed all secondary side terminations as well as completed the
installation of the on/off lever which opens and closes the switch
providing primary power for the facility.
* Completed all control terminations on the DCS side as well as the
instrument side out in the field. Making all proper terminations
coinciding with drawing diagrams and prints.
Industrial Electrician (July 2006 - July 2007)
Conaway Electrical, LaGrange, Georgia
* Duties consisted of but not limited to preventive maintenance of wire
manufacturing facility. (Southwire)
* Removed old and installed new machinery while providing wire ways
using conduit and cable tray for new machinery cable instillation and
terminations.
* Located low voltage and high voltage problems throughout massive
plant.
* Highly skilled EMT and rigid conduit bending and installation of all
size.
* PLC and control wiring performed for machinery operation.
Maintenance Superintendent (July 2004 - February 2006)
West Central Technical College, Douglasville, Georgia
* Maintained 80,000 square foot facility. (Douglas Campus)
* Provided routine and preventative maintenance for all areas including
but not limited to Energy Management, Security, and Surveillance
Systems.
* Supervised maintenance and custodial staff, 5 employees.
* Provided input to Campus Manager in decision making regarding
improvement projects.
* Communicated via phone and email with vendors and clients.
* Purchased equipment and supplies for the department as needed.
* Proposed budget for fiscal year and maintains $100,000 budget for
department.
* Has Microsoft Office 2003 experience.
* Coordinate work to be performed and completed throughout the facility,
working with outside vendors excepting bids while providing specs and
scope of work for the contractor for work to be performed while
abiding by any and all OSHA safety guidelines.
Substation Assembler (August 2003 - July 2004)
Aubrey Silvey, Carrollton, Georgia
* Supervised work team in Key West, Florida too assemble substation
providing backup electrical power to the area.
* Operated heavy equipment/machinery and worked on high tension power
lines during project.
* Prepared and constructed stress cones to high voltage wire, to be
terminated within PDC on site as well as the provided power poles.
* Constructed underground conduit system within tight quarters puling
wire throughout the substation yard and up power poles making all
proper terminations for permanent power feed for the substation PDC.
* Installed battery backup systems and UPS to the substation for
generator backup in case of complete power failure. Complete
instillation consisted of forming up the slab for equipment to be set,
install conduit, pull cable, and make all proper terminations,
completing all cable testing before providing permanent power to
equipment.
Electrician (September 1999 -August 2003)
West Georgia Electric, Carrollton, Georgia
* Managed work crew to provide electrical services for residential,
commercial and industrial facilities
* Performed electrical work on high security surveillance systems.
* Install conduit of all sizes, underground and throughout facility.
* Install and mount panels, transformers, PLC cabinets, DCS cabinets,
MCC equipment as well as make all necessary terminations for proper
operation.
* Installed conveyer systems and maintain for processing industrial
facilities for production purposes.
* Coordinate work with facility personnel to be performed during
specific hours and back up and running for normal business hours.
OTHER ACCOMPLISHMENTS
* Completed ITS substation orientation
* Completed Arc Flash Training
* Completed 0200 orientation
* OSHA 10 certified - Certification current
* Equipment operator's license
* 2-man scissor lift (1000 lbs), AWP boom lift (500 lbs), 1 man lift
(375 lbs), Hyster-28000 lbs, telescopic 10,000 lbs, Forklift (500 lbs)
* 15 years electrical service without a safety infraction
EDUCATION
West Central Technical College,
Completed one year of Electrical Construction and Maintenance
program.
Heard County High School
Graduated May 1997
REFERENCES