ISLAM YOUNESS, PMP
POWE SYSTEM T & D PROTECTION SAS DESIGN ENG
Grid (COGELEX AREVA)
Saudi Arabia
accgfw@r.postjobfree.com
Mobile +966-***-**-****
OBJECTIVE
Having position that will meet my work experience, education, training and acquired skills in
PMP and electrical protection power system engineering in order to attain further knowledge
and relations for improving my experience and personal skills and career.
Finally, Adding value to myself and to the organization
PROFESSIONAL EXPERIENCE
From Nov 13 Organizatio
Grid (COGELEX
n
To Present
AREVA).
City
Position
CCS Design Team leader for
JEEDAH.
Country
KSA WOA (Panel automation
Dept Kingdom of Saudi Arabia (KSA)
engineer)
SAS department.
From Apr 12 Organizatio
Grid (COGELEX
n
To Nov 13
AREVA).
City
Position
CCS Design Engineer (Panel
Riyadh / Al Khobar Dammam.
Country
automation engineer)
Dept Kingdom of Saudi Arabia (KSA)
SAS department.
From Oct 08 Organizatio DAR Engineering (Al Fanar Co.)
n
To Mar12 Jeddah
City
Position
Substation Protection design Kingdom of Saudi Arabia (KSA)
Country
Dept engineer (380/110/33/13.8KV).
Protection department
From Sep 07 Electrical Power System Engineer
Organizatio
n
To Oct 08 Co (EPS).
City
Position
Electrical power Engineer Cairo
Dept Country
Protection dept. Egypt
Page 1 of 5
Study the scope of work & project specification requirement.
Responsibilities •
• Analysis of the Risk / Deviation as per project specification.
• Preparation of the projects base design (Substation main one line diagram,
Protection logic diagram, interlock logic diagram, CT & VT calculation
requirements, AC/DC auxiliary system design calculation).
• Preparation of all substation required signals for (SER, SCADA, TFR and
Annunciation) systems.
• Preparation/Review of the Panel List / Relay List AC/DC Load Calculation
• Preparation/Review of the BOQ.
• Base Design Preparation / Review of Base Design
• Detail Design Preparation / Review of the Detail Design for the Control and
Protection Panels
• Ordering of the material for the project scope
• Coordination with Customer, Consultant and Contractor/sub contractor for the
timely approval of the drawing / documents
• Attending the meeting with Customer, consultant and contractor for the
technical clarification
• Coordination with Panel Manufacturer / factory.
• Coordination with Testing and Commissioning Team
• Coordination with Procurement & Project Management Team
• Following up the project schedule.
• Optimizing the project cost by analyzing the customer requirement
appropriately
• Executing the project in order to meet customer expectation.
• Review the technical offers as per IEC, ANSI & SEC standard specifications.
• Control and protection panels design
• Preparation of the panels interfacing and terminations.
• Modify the exciting protection and control schemes for old substations (remote
end S/S's) to be matching with the new protection scheme requirement.
• Preparation of the relay setting calculation (Distance, Differential, Restricted
EF, Back up O/C & EF relays, ect.). (ABB, SIEMENS, SEL, MICOM…) relays.
• Protections relay co ordination.
• Power system analysis studies (load flow & short circuit).
• ETAP power system analysis and relay settings calculation.
• Aspen short circuit and relay setting co ordination.
• Site visit survey.
ACHIEVED PROJECTS @ GRID
Project Name 132/13.8KV TIYYAM 2 S/S, 132/13.8KV NUZHA 2 S/S & 132/13.8KV HINDAWAYA S/S.
Owner/contractor SEC WOA / Grid.
380/132/13.8KV AD DAWADMI S/S
Project Name
SEC COA / SSEM.
Owner/contractor
KING KHALED MILITRY CITY (KKMC) POWER PLANT EXTENTION ADD ONE GAS
TURBINE.
Project Name
KING KHALED MILITRY CITY (KKMC) / ACC
Owner/contractor
REPLACEMENT OF ELECTROSTATIC PROTECTIVE RELAYS STSTEM BY
Project Name FULL NUMERICAL RELAYS FOR TWO GTG UNITS.
MARAFIQ /
Owner/contractor
132/33KV SABYA NORTH S/S.
Project Name SEC SOA / Grid.
Owner/contractor
380/33KV (9035) PP12 S/S
SEC COA / Grid.
Project Name
Owner/contractor 380/110/13.8KV AL SALAM S/S
SEC WOA / ALSTOM Grid.
Project Name
380/110/13.8KV SALBOUKH S/S
Owner/contractor
SEC COA / NCC Ltd.
Project Name REPLACEMENT OF ELECTROSTATIC PROTECTIVE RELAYS STSTEM BY
Owner/contractor FULL NUMERICAL RELAYS FOR ONE STG UNIT.
MARAFIQ /
Project Name 380/110/13.8KV BISHAH S/S
SEC WOA / SSEM
Owner/contractor
REPLACEMENT OF ELECTROSTATIC PROTECTIVE RELAYS STSTEM BY
FULL NUMERICAL RELAYS FOR 380KV OHL MAKKAH AREA (24 END) & 4
Project Name Nos 380/110/13.8KV POWER TRANSFORMERS
Owner/contractor SEC WOA / Grid.
Page 3 of 5
Project Name 132/13.8KV BASATEEN S/S, 132/13.8KV BAHRA S/S & 132/13.8KV AL WAJH S/S.
SEC WOA / Grid.
Owner/contractor
REPLACEMENT OF ELECTROSTATIC PROTECTIVE RELAYS STSTEM BY
FULL NUMERICAL RELAYS FOR 110KV OHL MAKKAH & RABJA AREA (28
Project Name END), 17 Nos 110/13.8KV POWER TRANSFORMERS and 13.8KV BUSBAR
Owner/contractor PROTECTION (4 x Double Buses).
SEC WOA / Grid.
Project Name
Owner/contractor
.
ACHIEVED PROJECTS @ ALFANAR CO
Project Name 380/110/13.8KV MAKKAH NORTH substations & related remote end substations
Owner/contractor SEC WOA / Al Tokhi construction Co.
380/110/33/13.8KV HARAMMEN substations ( six S/S’s)
Project Name SEC WOA / AL FANAR Co.
Owner/contractor
REINFORCEMENT OF HAIL 3 POWER PLANT
SEC WOA / AL FANAR Co.
Project Name
Owner/contractor
132/13.8KV Saline Water Substation (Three S/S’s) & 33/13.8KV Sealing
Water Substation (Three S/S’s) / AL DAR ENGINEERING
SWCC / AL GIHAZ Co.
Project Name
Owner/contractor
380/110/13.8KV HIGH VOLTAGE MAKKAH SUBSTATION / AL DAR ENGINEERING
SEC WOA / AL FANAR Co.
Project Name
132/33/13.8KV SHUQIAQ 2 SUBSTATION / AL DAR ENGINEERING
Owner/contractor
SEC WOA / AL GIHAZ Co.
132/33/13.8KV AHAD RUFFAIDAH SUBSTATION / AL DAR ENGINEERING
Project Name
SEC WOA / AL GIHAZ Co.
Owner/contractor
33/13.8KV HABIL SUBSTATION / AL DAR ENGINEERING
Project Name
Owner/contractor SEC WOA / AL GIHAZ Co.
380/110/13.8KV NEW MAKKAH WEST SUBSTATION / AL DAR ENGINEERING
SEC WOA / AL FANAR Co.
Project Name
380KV Rabigh 2 Switching Substation / AL DAR ENGINEERING
Owner/contractor
SEC WOA / AL FANAR Co.
Project Name
Extension for 380/110/13.8KV SOUTH AZIZIAH Substation/ AL DAR ENGINEERING
Owner/contractor
SEC WOA / NATEL Ltd Co.
Project Name 380/110/13.8KV HVE / AL DAR ENGINEERING
Owner/contractor SEC WOA / AL FANAR Co.
380/110/13.8KV JEDDAH NORTH SUBSTATION / AL DAR ENGINEERING
Project Name SEC WOA / AL FANAR Co.
Owner/contractor
380/110/13.8KV SOUTH AZIZIAH SUBSTATION / AL DAR ENGINEERING
SEC WOA / AL FANAR Co.
Project Name
Project Mission 380/110/13.8KV NEW MADDINAH EAST SUBSTATION / AL DAR ENGINEERING
SEC WOA / AL TOKHY Co.
Project Name
REINFORCEMENT OF HAIL 2 POWER PLANT
Project Mission
SEC WOA / AL FANAR Co.
Project Name
Project Mission
Project Name
Project Mission
Project Name
Project Mission
Page 5 of 5
ACHIEVED PROJECTS @ EPS CO.
Project Name ABO SANNAN (The General Petroleum Company)
Owner/contractor General Petroleum Company
KHALDA Petroleum Company
Project Name KHALDA Petroleum Company
Owner/contractor
EDUCATION BACKGROUND
2002 -07 College
Faculty of Engineering ….Helwan University
B.Sc of engineering in "Electrical Machine and Power Eng.Dep."
(The degree of 3rd year is very good)
(The degree of 4th year is very good)
(Over all degree is good)
Graduation
Project
Shunt Active Power Filter
Category
Power Electronics Application
Grade
Excellent 98%
Contents
• Limitation for sharp harmonic orders& spikes
• Improving the power factor
• Power analysis for the network
ADDITIONAL CERTIFICATES AND COURSES:
DATE COURSE OFFERED BY
May 13 Advanced protection and control system Alstom Grid / UK
Oct 12 Generator protection Alstom Grid / UAE
Dec 07 PLC programming 2 (SIEMENS) & SCADA – DCS A.D. Panasonic Centre
The management of human resources and feasibility
Cairo University
Aug 07
studies
July 07 PLC programming (LG) A.D. Panasonic Centre
July 07 Traditional Control ( Classical control ) A.D. Panasonic Centre
Microcontroller Architecture Programming (AT90S) &
Cairo university
Aug 04
Interfacing
Operation & maintenance of
Cairo South power
July 04 Steam power plant – gas power plant – combined cycle
station
power plant.
Techno pyramids
July 03 Electrical machines maintenance
Factory
Faculty of engineering (workshops training) :
Helwan University
Aug 03
Electrical motors, cables, lighting, electronics & control
COMPUTER SKILLS / SOFTWARE'S
Very good user for :
Amtech ProDesign
•
EDSA
•
ETAP
•
ASPEN
•
ERACS
•
• E3 Series Program
• MiCOM S1 Agile
ABB software (PCM)
•
SIEMENS software (DIGSI)
•
ATP
•
Auto cad
•
• Microstation
MATLAB
•
Lab view
•
Adobe Photoshop
•
• MS office programs (Word Excel PowerPoint…).
• Familiar with Windows 95, 98, 2000, Me, Xp & Vista
• Internet browsing, emailing, web search etc
RUNNING PLANES
• Project Planner Primavera Project Planner Software.
Page 7 of 5
REFERENCES: Available upon request.