Timothy A. Ridens
**** * **** ****** ******* Texas 79423
Cell 512-***-****
E-mail accbga@r.postjobfree.com
****-**** ******* ************** ****** Building Corp.
SL loop 289 Reconstruction
Responsible for the demo and of exiting bridge and
construction of new bridge 1000 ' long in its Place. Also
coordination of subs on the project. Time cards and schedule
for project of multiple crews. Multiple drainage structures.
2011- 2012 Project Superintendent Price Construction
Cottonwood to Dermott Transmission line
Responsible for daily reports, Daily time, and
calling in Dig Test, getting TXDOT permits
Coordinating crews and work being done from Gate
installations & grubbing of R.O.W.
160' wide for the length of the project.
Getting Grubbed R.O.W. brush piled up on the R.O.W
and out of why of towers.
Conducting safety meeting. Also coordinating haul
trucks to move equipment on this
Project which was 74 miles long. Collecting
quantities and getting them turned in for
Payment.
2010-Oct.2011 Project Manager Price Construction
Big Lake Texas, Oil Fields
Responsible the scheduling of equipment and man power to clear
land and grade the location for base for oil rigs to drill new
wells. Making sure mobile crushers are in the right caliche
pit to crush base for location. There are 5 oil rigs that we
are building new locations For. Inputting all of the labor and
equipment hours into Heavy Job system program and E-mailing to
main office. Scheduling repairs for equipment as needed. Also
making sure that billing for locations are correct and signed
for and turned into office in a timely matter.
2009-2010 Project Superintendent/Project Manager, W.W.Webber, LLC
Tom Green County, SL 306 Widening
Responsible for Scheduling and the construction of
the widening of SL 306 and the
Construction of the four Bridges, Two of them
crosses the Concho River. Also making sure it stays on
budget. Coordinating of Sub contractors on the project,
ordering of materials and equipment for the project.
2007- 2008 Project Superintendent/Project Manager, W.W.Webber, LLC
Bexar County, FM 2252 Widening & Loop 1604 Turnaround Bridge
Responsible for Scheduling and the reconstruction of FM 2252
and coordinating of sub contractors. Keeping an eye on the
budget for the project. Also responsible for the construction
of the turnaround bridge at Loop 1604.
2004 - 2007 Structural Superintendent, Granite, Myers, Rados
Garden Grove Freeway, SR22, HOV Project
Responsible for scheduling and supervision of a fast-trac
job, that involved constructing approximately 15,000 lf
of retaining walls, within 6 miles of the project, with
fractured ribbed texture liners. Walls were constructed in
heights that varied from 8 to 30 feet. Construction
supervision responsibilities included construction of three
full replacement bridges, replaced with precast girder
bridges. This work was done with live traffic in two separate
phases. Responsible for Abutments and Columns on the
widening of two other bridges. Handled scheduling and
supervision of construction on Pedestrian Bridge Crossing,
Pump Station, Bridge Barriers, and other structures as
required for completing the project.
2000 - 2004 General Superintendent, Modern Continental
Del Amo Grade Separation and San Diego Light Rail Trolley Line
Responsible for putting up falsework for five different box
girder bridges. Pipe and wood timber falsework. Responsible
for appx. 6000 lf. of retaining walls. Scheduling
subcontractors and concrete pours. Maintain Fast-Trac
schedule using multiple shifts. Calculate formwork and
materials needed. Layout of foundations and piles for
bridgework.
1998 - 1999 Superintendent, Kajima Engineering
I-5 Widening
Responsible for forming abutments, columns and box girder
bridges. Scheduling layout of concrete pours and daily
manpower. Assisted purchasing to ensure proper materials
were ordered and received. Scheduled and supervised multiple
shifts.
1996 - 1998 General Foreman, Kajima Engineering
Badger Bridge Project
Responsible for scheduling removal of existing drawbridge and
replacement of new lift span. Coordinated the building of 2
new cofferdams needed to retrofit old footings of new
drawbridge. Scheduled and supervised multiple shifts and
concrete pours.
1993 - 1995 General Foreman, Brinderson Industrial
Refinery Clean Fuel Projects: Mobil and Ultramar
Responsible for forming four gasoline storage tanks, Coker
basin and Sulfur storage tank. 3 Million gals. Plus in size.
Scheduled manpower and placement of equipment. Coordinated
building of concrete footings and anchor bolts for refinery
processing components.
1990 - 1992 Carpenter Foreman, Hyman-Mortenson
Los Angeles Convention Center
Responsible for forming all concrete stairways. Scheduled
concrete pours. Prepared timesheets and scheduling multiple
shifts as needed.
1988 - 1990 Carpenter Foreman, Brinderson Industrial
Orange County Sanitation District Co-Generation Plant
Responsible for layout, material and manpower calculation for
building of large motor foundations, mechanical equipment
foundations, and pour in place structures including pump
stations and circular concrete water tanks. Weekly timesheets
and scheduling of multiple shifts.
Computer Skills Microsoft Excel and Word
Certifications CPR/1st Aid Certified
Building Inspection Certificate
10 Hour OSHA