Post Job Free

Resume

Sign in

Project Manager Manufacturing

Location:
Posted:
March 17, 2014

Contact this candidate

Resume:

Gregory A. Norris

*** ****** ***** *** **********, Kentucky 40223

859-***-**** acc6mj@r.postjobfree.com

MANUFACTURING MANAGER

Lean / Six Sigma / Toyota Production System / JIT / Heijunka / Judoka /

Welding / Robotics / Plant Startup / 5S

Product Launch / Quality / Union & Non-union / Process Design / Kaizen /

Supervision / OEM

I excel at developing, implementing and managing high volume, high quality

production systems to ensure continuous manufacturing successes. My strong

experience in project life-cycle management allows me to be an expert in

anticipating problems and setting corrective actions to overcome production

roadblocks. I am known for...

. Launching and managing near perfect production processes

. Maximizing production, eliminating material waste and lowering labor

requirements

. Building high productivity, low turnover production teams

. Introducing quality and safety controls

. Integrating new product manufacturing into existing facilities

With dedication and a never ending supply of energy, I think outside the

box to get the job done right the first time. I am an exceptional

communicator and problem solver. My hands-on leadership approach is

balanced with my high performance team management. I posture assets to do

more with less, a talent others admire.

CAREER HISTORY

Daiwa America, Inc./Mitchell Plastics Charlestown (January 2013-December

2013)

Pre-production Engineer in an injection molding facility (contracted

through Aerotek Engineering)

. Charged with launching major model change for Toyota Corolla

o Toyota Motor Manufacturing Canada

o Toyota Motor Manufacturing Mississippi

. Introduced minor model change of Toyota Tundra

o Toyota Motor Manufacturing Texas

o Toyoda Gosei Texas

o Johnson Control

. Laredo, Texas

. Ramos, Mexico

General Electric Appliance Park (October 2011-January 2013)

. Continuous Improvement Leader in Refrigeration Division

. Coach and develop first group of Team Leaders in GE history

. Implement principles of TPS into a union environment

. Launch latest technology French door refrigerator

NHK Spring Precision of America (November 2010-August 2011)

. Manufacturing Supervisor

o Supervise daily production in a manufacturing environment

People Strategy Consulting (August 2009-November 2010)

. Senior Consultant

. Provide strategic solutions to manufacturing and office environments

using principles of TPS

TPS Solutions LTD (February 2005-July 2009)

Senior Consultant, a $1M Lean management consulting company, 2005 to 2009.

Delivered Lean productivity program solutions for government, aeronautic,

transportation, automotive and golf product clients. Managed projects from

value stream mapping to feasibility to final completion. Introduce the

Principles of Lean Manufacturing and the Toyota Production System in a

classroom setting.

. Chrysler Corporation: Led the instruction/introduction of 1700 union

and salaried employees in Chrysler's Smart Manufacturing System

teaching the principles of the Toyota Production System and Lean

Manufacturing. Administered a two day simulation using Standard Work

Instruction, Practical Problem Solving, Kaizen, Just in Time delivery,

Waste Reduction and Inventory Control.

Belvidere Assembly Plant, Belvidere, Il and Newark Assembly Plant,

Newark, DE.

. United States Air Force: Lead classroom instructor in Toyota

Production System and Lean Manufacturing principles for while

streamlining maintenance operations on the home front.

Instructor/trainer in practical application of Lean Principles

(Practical Problem Solving, Kaizen, Inventory Reduction and Just in

Time Delivery.

Dover Air Force Base, Dover, DE and Travis Air

Force Base, Fairfield, CA

. Textron Corporation: Augusta, GA. Led reorganization of manufacturing

facility for E-Z GO Golf Cart Division through introduction of Toyota

Production System principles. Reduced manufacturing footprint by 60%

and increased quality acceptance rate 55% in six months.

. Bay Area Rapid Transit (BART) Led reorganization of maintenance work

processes through introduction of Toyota Production System principles.

Increased Operation Efficiency by 25% while eliminating need for

headcount addition. San Francisco Transportation District, San

Francisco, CA

Toyota Motor Manufacturing Kentucky, Inc. (December 1987-January 2005)

. SEVENTEEN YEARS PERFECT ATTENDANCE

. TWO YEARS TRAINING FLAGSHIP FACILITY IN JAPAN

. CERTIFIED PROBLEM SOLVING INSTRUCTOR

Assistant Manager of Production and New Model Launch (April 1997-January

2005)

. Project manager for introduction and launch of Solara Convertible Line

. Process engineering; layout development

. Approve development and implementation of Standardized Work, Just-In-

Time delivery, manpower requirements and SQCP standards

. Design, review and approval of Japanese sourced equipment

. Supervise Body Operations Pilot Group machine trials in Japan

. Integrate new product line into current production assembly line

. Project manager for relocation of existing assembly processes to

facilitate the introduction of GBL

. Manage SOP of relocated processes including complete Standardized Work

revision and Team Member re-training

. Supervise daily operations of Body Operations

. Establish organization for Body III, a new unit of Body Operations

Group Leader of Body Operations Pilot Group and Production (January 1990-

April 1997)

. Assistant Production Project Manager for three major model change

projects

. Completed five month Pilot Group Training in Japan

. Supervised introduction of three major model launches

. Selected and trained Pilot Group Team Members

. Authored internal publication, Pilot Team Member Handbook, to guide

Team Members working and traveling abroad

. Mentored Group Leader candidates

. Supervised launch of second shift production

. Initiated shift to shift communication system

. Scheduled Team Member training and development, vacation and

production scheduling, OSHA and Toyota certifications

. Trained Team Members in the philosophy of Japanese work and societal

culture

. Supervised daily operations of group

. Accepted voluntary transfer to underperforming groups to improve Body

Operations productivity

Team Leader of Production (December 1987-January 1990)

. One month training in Japan for introduction of Toyota Production

System philosophy and process training

. Eight month class room and practical training

. Trained first shift Team Members in process Standardized Work,

Quality, Safety, Cost and Productivity standards

Education

University of Louisville BS Workforce Leadership 2014

Villanova University

Northwood University

Bishop David High School

Training

Toyota Certified Training:

Standardized Work Active Listening

Quality Control Speaking So Other Will Listen

Workplace safety Meeting Facilitation

Kaizen Problem Identification

Andon Problem Resolution

Visual Control Practical Problem Solving I and II

Job Instruction Training Inventory Management

Kanban Jidoka

Work Flow Heijunka

Takt Time 5S

Just-In-Time delivery Conflict Management

Philosophy of Efficiency Progressive Corrective Action

Coaching for Performance Workplace Violence

Targeted Selection



Contact this candidate