Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
United States
Posted:
March 15, 2014

Contact this candidate

Resume:

***** ***** **. 507-***-****

Belview, Mn.

*****

Scott Pederson

Professional

Experience 2013-Present

Project Manager / Purchasing

SpecSys Manage builds of equipment from 500 hrs to 20,0000 hrs

Granite Falls Mn

Manage timelines of build so that it is completed on

time and budget

Purchase components and raw material for build most

economical

2011 - January 13th, 2013

Manufacturing Engineer

Manage machine maintenance personnel with daily

priorities.

Chandler Industries Plan shipping of product to meet due dates.

Inc. Work with management to meet due dates. Overtime and

Montevideo, MN extra resources etc.

Create bar graphs for work center efficiencies.

Compare estimate with real time for profitability of

part numbers.

Re-estimate non-profitable part numbers.

Implement new tooling and routings for ergonomics for

machine operators and improve efficiencies of part

numbers.

Set up new work center areas for user friendly

environment for operator.

Ongoing 5s improvements weekly.

Weekly engineering meetings for new product and new

tooling implementation.

Work with machine operators in building team

environment to help improve profitability for operator

and company.

Hutchinson 1998 - January 2009

Technology Inc. Tool Maker Lead / Prototype Engineer

Hutchinson, MN Manage 15 -20 people on their daily duties.

Manage and level the workload in the shop.

Heavy workloads look for other vendors to send

external.

Create work center teams, write up reports to show

efficiencies in work area.

Double check routings and estimates of jobs.

Research and purchase machines.

Work with engineers to utilize the lasted technology

to improve build time and develop new tooling.

Disciplinary action meetings up to termination.

Conducted Interviews.

Bi -annual reviews of staff.

Procurement of companies to expand tooling base.

1997 - 1998

Tooling Estimator

Estimate the time to build tooling.

Structure an order on how the tool should be run

through the shop in an orderly manner.

1995 - 1997

Tooling Coordinator

Coordinate tools through tool room to ensure fastest

build time.

Work with toolmakers, design and purchasing to prepare

for tool build.

1994 - 1995

Mechanical Technician

Assemble and debug production machines such as forming

systems, accugrams, laser welders and hole shears.

1992 - 1994

New Build Toolmaker

Build high tolerance detab dies, forming dies, and one

up detab dies.

1990 - 1992

Custom Repair and New Build Toolmaker

Build and maintain sheet shears, detab dies, damper

dies, and selective sheet shear. Make improvements to

machines and modify.

1988 - 1990

Surface Grinding and Heat Treat Specialist

Surface grinding precision parts and heat-treating

material to a specified Rockwell hardness.

1987 - 1988

Class A, CNC Production Machinist

High Tolerance CNC, lathe, horizontal mill, boring and

surface finish.

Sanborn

Manufacturing

Company

Springfield, MN

Education

Productivity Inc.

Minneapolis, MN 2012

Fanuc Control

HAAS CNC Operator Training

HAAS CNC Programming Training

Professional

Training Institute 2009

Fargo, ND Insurance

Life, Accident and Health

1990 - 2008

Hutchinson Tecnology View My Transcripts

Inc. List of classes provided on a separate sheet.

Hutchinson, MN 1986 Graduate

Machine Tool Technology

First Year - shop practice 720 hours, math 80 hours,

blueprint reading, sketching, drafting 90 hours and

Southwestern theory 180 hours.

Technical College Second Year - numerical control, CNC 200 hours, mold

Granite Falls, MN making 430 hours, jig and fixture design 45 hours,

blue print reading, industrial relations 75 hours and

EDM 50 hours.

1984 Belview High School Graduate

General

Interests Reading, music and outdoor activities.



Contact this candidate