Jeffrey Stahl
*** ****** ****, *** *******, PA 15672
Home 724-***-****, Cell 412-***-****
Email: acbx5t@r.postjobfree.com
SUMMARY
Mechanical Design Engineer
Boiler Inspector with Diamond Technical Services
6 months boiler experience with Gen Power
10 years experience of Project Management with Westinghouse Electric
Corporation and 2.5 years with Elliott Company
Performed refurbishment and maintenance of Reactor Coolant Pumps to ensure
ISO standard compliance at nuclear power plants throughout the United
States
Co-designed and co-authored patent application for component of
Westinghouse Steam Generators
Supported design and repair of ferrous and non-ferrous material components
(e.g., rotor shaft) for manufacturing facility
Project Manager for Westinghouse from 1998-2008 traveling to various
nuclear power plants for maintenance and repair of Reactor Coolant Pumps
and Motors during scheduled outages or unplanned emergencies. Balanced RC
pumps and motors before start-up.
Developed and performed multiple customer presentations for proposed work
approaches
EDUCATION
West Virginia University Morgantown, WV 12/95
B.S. Mechanical Engineering
EXPERIENCE
Diamond Technical Services, Blairsville, PA 9/13-Present
Boiler Inspector
-Look at the condition of boiler tubes to ensure longer run times without a
failure during operation.
- Corrosion Fatigue
- Vibration and Stress Fatigue (rubs)
- Coal Particle Erosion
- Fly ash erosion
- Soot blower erosion
- Falling slag erosion
Gen Power, Maidsville, WV 1/13-
6/13
Mechanical Engineer (Full time)
-Performed boiler walk downs to see if there were any leaks in or around
the boiler
-Wrote a coal sampling procedure on coal fineness
-Wrote an auxiliary boiler procedure on laying up the Auxiliary Boiler with
a nitrogen blanket
-Followed the replacing of the Primary and Secondary Air Expansion Joints
on the air ducts for the boiler
Westinghouse, New Stanton, PA
11/11-3/12
Mechanical Engineer (Contract)
-Authored Calculation Notes, Equipment Qualification Summary Reports and
Equipment Qualification Data Packages for Westinghouse's A.P. 1000 Nuclear
Power Plants.
Westinghouse, Madison, PA 8/11-
10/11
Mechanical Engineer (Contract)
-Authored Calculation Notes on the Pipe Rupture Hazard Analysis for the Jet
Impingement Loads on the Reactor Coolant Pump Heat Exchangers for
Westinghouse's A.P. 1000 Nuclear Power Plants.
Elliott Company, Donora, PA 12/08-
4/11
Project Manager
-Performed Project Manager/Customer Support field services for the repair
of various sized Turbines, Compressors and Rotors
Westinghouse, Monroeville, PA 9/08-
11/08
Mechanical Engineer (Contract)
-Served as Liaison between Westinghouse and China for the A.P. 1000 China
Project questions
-Assisted with the design of a lift rig for the installation of the Reactor
Coolant Pumps in the new nuclear designed A.P. 1000 Plants
Chemco Systems, Monongahela, PA 1/08-4/08
Project Manager
-Performed Project Management field support of Lime Slurry Systems for air
pollution control
Westinghouse Electric Company, Madison, PA 5/98-
1/08
Field Service Engineer
-Performed Project Management of field service crews comprised of
technicians and labor support for the Disassembly/Reassembly of
Westinghouse Reactor Coolant Pumps at various nuclear power plants
-Provided extensive customer interface
-Performed project planning
Westinghouse Staffing Services/CDI Corporation, Madison, PA 2/96 -
5/98
Mechanical Engineer (Contract)
-Analysis of laboratory test data
In-service inspection data for nuclear steam generators
-Supported steam tube integrity analyses
-Basic design of closure plug for steam boiler in nuclear application
-Patent application filed for the design
OTHER EXPERIENCE
Corhart Refractories, Buckhannon, WV 8/95-
12/95
Engineering Senior Design Project
-Developed an improved method of optimizing recycling of
ceramic material from a sludge mixture (water & ceramic)
-Presented the results to Corhart's Supervisor of Equipment
Engineering and fellow co-workers to explain how their existing
operation of reclaiming the ceramic material could be improved
with a cost savings of over $70K/year