Resume

Sign in

Mechanical Engineer (Piping,Fire Fighting System.

Location:
India
Posted:
December 26, 2013
Email:
acbutb@r.postjobfree.com
Contact Info:
*****.********@*****.*** ; ***** **:-**********


MD. MUNIRUZZAMAN

C/O Md.Sohail Ahmad, Email:-
acbutb@r.postjobfree.com
***-*** ******, ******: +91- 955*******; 811*******
Mewatiyan, Gonda
U.P- 271001

Objective: Seeking suitable position in a challenging environment where I
can show my capabilities and my knowledge & experience is optimally
utilized to accomplish organizational goals as well as my career growth.

Professional Qualification

B.E (Mechanical) from R.P Sharma Institute of Technology, Patna, affiliated
to Magadh University, Bodh Gaya, and Bihar. Passed in 2007 with 69.79%
marks.

Acquired exposure & Professional skills

> Worked in Jamnagar Export Refinery Project (JERP) as Mechanical Engineer
through Kaypee mechanical India Pvt. Ltd at Jamnagar (Aug'07-Mar'09).
> Worked with the project of L&T(Power) as Execution Engineer at Panipat
(Mar'09 - Jan'011)
> Having good expertise in steering Projects in Petroleum Refinery and
power plant.
> Good Knowledge of Pipe Fabrication & Inspection. Well versed in
fabrication of all kind of Industrial Pipe line & Fire Fighting system.
> Ability to ramp up projects with competence and cross-functional skills
to carry out Scheduled planning, monitoring and co-ordination with
clients & Head office to ensure project completion in projected time &
cost.
> Having good Interpersonal skills and relationship management which is
required to handle the team members of any Project and other related
agencies with consummate ease.

Highlights of the previous assignment

Working with a project of L&T (Power) as Site Engineer posted at Panipat
wherein I am responsible to lead the team of engineers representing the
Contractors to execute the Piping work & Fire Fighting System at Panipat
Naphta Cracker Project (PNCP) which is of the capacity of 235.5MW and
situated at Panipat Refinery (I.O.C.L.). The Plant comprises of 5 Gas
Turbines (M/s Hitachi, Japan), 3 Steam Turbines (M/s BHEL, India), 2
Utility Boilers (M/s Ansaldo, Italy), 5 Heat Recovery Steam Generators (M/s
L&T, India).

Technical Responsibilities:-

> Fabrication & Execution of Piping / Structural works, Inspection of
fabrication & Installation, Fit-up Co-ordination with client's
inspectors Co-ordination with in-house stores for material follow up
and tracking Progress monitoring & reporting Mechanical clearance for
hydro testing, Pneumatic testing,

> Fire Fighting system (Co2 system for switchgear room, Inergen system
for control room, Cooling water & foam system for fuel oil tanks,
Hydrant System for whole CPP, HVS & MVS for Transformers) and fire
protection system.

> Witness field testing as per ITPs

> Prepare Look Ahead Schedules for fabrication / erection and pressure
testing of Fire Fighting System, UG Piping and co-ordinate with client
for the approval.

> Studying the Fire Fighting System and instrument diagrams (P & IDs)
and identifying the pipelines and systems.

> Supervision of UG Pipe erection for different piping systems.

> Responsible for fieldwork monitoring and issuance of site instructions
to work groups to highlight deficiency and expedite piping works with
respect to target schedule.

> Identify equipment location as per general arrangement drawing and
prepare layout and measurement. Check installed piping components as
per P & ID.

> Instruments installed in Pipe lines are control valves, temperature
transmitter, pressure transmitter, flow measuring differential
transmitter, rotary equipments etc.

> Preparation of Look ahead Schedules for Material, Manpower &
Equipment.

> Co-ordinate overall project execution plan to meet the targeted
schedule.

> Checking the piping materials as per Codes and Process Standard
Specifications. Preparing Material Take Off list as per Isometric
drawing.

> Inspection of shop fabrication of piping spools and supports. Visual
inspection of plant piping and preparing Punch List after
installation.

> Preparation Pressure Test Packages prior to pressure test. Preparation
and clearing of Punch items prior to pressure test.

> Prepare the documents activities and Test Packages.

Current company :-

Vajay Sabre Safety Ltd.In Fire Protection Division.

Project: - 2X45 MW Coal Based Thermal Power Project at Kundarki

Clint: - Bajaj Infrastructure Development Company Limited.

Designation: Site In charge, (Feb'011- Till Date).

Computer Skills

Basic Knowledge of DOS, windows. Proficiency in MS-office and internet.

Personal Details

DATE OF BIRTH : 1ST MARCH 1980
MARITAL STATUS : MARRIED
RELIGION : ISLAM
HOBBIES : LISTENING MUSIC
SEX : MAIL
NATIONALTY : INDIAN
LANGUAGE KNOWN : HINDI, ENGLISH & URDU
PERMANENT ADDRESS : S/0-MD.SHARFUZZAMAN
VILL-CHUCKNOORUDDIN
POST-MUKTAPUR
DIST-SAMSTIPUR-848102
PASSPORT NO : J1180445
DATE OF ISSUE : 07-04-2010
DATE OF EXPIRY : 06-04-2020

Declaration

I hereby declare that the information furnished above is true to the best
of my
Knowledge.

Date:

Place:

Md.Muniruzzaman