Resume

Sign in

Mechanical Engineer (Piping,Fire Fighting System.

Location:
India
Posted:
December 26, 2013
Email:
acbutb@r.postjobfree.com
Contact Info:
*****.********@*****.*** ; ***** **:-**********


MD. MUNIRUZZAMAN

C/O Md.Sohail Ahmad, Email:-

acbutb@r.postjobfree.com

***-*** ******, ******: +91- 955*******; 811*******

Mewatiyan, Gonda

U.P- 271001

Objective: Seeking suitable position in a challenging environment where I

can show my capabilities and my knowledge & experience is optimally

utilized to accomplish organizational goals as well as my career growth.

Professional Qualification

B.E (Mechanical) from R.P Sharma Institute of Technology, Patna, affiliated

to Magadh University, Bodh Gaya, and Bihar. Passed in 2007 with 69.79%

marks.

Acquired exposure & Professional skills

> Worked in Jamnagar Export Refinery Project (JERP) as Mechanical Engineer

through Kaypee mechanical India Pvt. Ltd at Jamnagar (Aug'07-Mar'09).

> Worked with the project of L&T(Power) as Execution Engineer at Panipat

(Mar'09 - Jan'011)

> Having good expertise in steering Projects in Petroleum Refinery and

power plant.

> Good Knowledge of Pipe Fabrication & Inspection. Well versed in

fabrication of all kind of Industrial Pipe line & Fire Fighting system.

> Ability to ramp up projects with competence and cross-functional skills

to carry out Scheduled planning, monitoring and co-ordination with

clients & Head office to ensure project completion in projected time &

cost.

> Having good Interpersonal skills and relationship management which is

required to handle the team members of any Project and other related

agencies with consummate ease.

Highlights of the previous assignment

Working with a project of L&T (Power) as Site Engineer posted at Panipat

wherein I am responsible to lead the team of engineers representing the

Contractors to execute the Piping work & Fire Fighting System at Panipat

Naphta Cracker Project (PNCP) which is of the capacity of 235.5MW and

situated at Panipat Refinery (I.O.C.L.). The Plant comprises of 5 Gas

Turbines (M/s Hitachi, Japan), 3 Steam Turbines (M/s BHEL, India), 2

Utility Boilers (M/s Ansaldo, Italy), 5 Heat Recovery Steam Generators (M/s

L&T, India).

Technical Responsibilities:-

> Fabrication & Execution of Piping / Structural works, Inspection of

fabrication & Installation, Fit-up Co-ordination with client's

inspectors Co-ordination with in-house stores for material follow up

and tracking Progress monitoring & reporting Mechanical clearance for

hydro testing, Pneumatic testing,

> Fire Fighting system (Co2 system for switchgear room, Inergen system

for control room, Cooling water & foam system for fuel oil tanks,

Hydrant System for whole CPP, HVS & MVS for Transformers) and fire

protection system.

> Witness field testing as per ITPs

> Prepare Look Ahead Schedules for fabrication / erection and pressure

testing of Fire Fighting System, UG Piping and co-ordinate with client

for the approval.

> Studying the Fire Fighting System and instrument diagrams (P & IDs)

and identifying the pipelines and systems.

> Supervision of UG Pipe erection for different piping systems.

> Responsible for fieldwork monitoring and issuance of site instructions

to work groups to highlight deficiency and expedite piping works with

respect to target schedule.

> Identify equipment location as per general arrangement drawing and

prepare layout and measurement. Check installed piping components as

per P & ID.

> Instruments installed in Pipe lines are control valves, temperature

transmitter, pressure transmitter, flow measuring differential

transmitter, rotary equipments etc.

> Preparation of Look ahead Schedules for Material, Manpower &

Equipment.

> Co-ordinate overall project execution plan to meet the targeted

schedule.

> Checking the piping materials as per Codes and Process Standard

Specifications. Preparing Material Take Off list as per Isometric

drawing.

> Inspection of shop fabrication of piping spools and supports. Visual

inspection of plant piping and preparing Punch List after

installation.

> Preparation Pressure Test Packages prior to pressure test. Preparation

and clearing of Punch items prior to pressure test.

> Prepare the documents activities and Test Packages.

Current company :-

Vajay Sabre Safety Ltd.In Fire Protection Division.

Project: - 2X45 MW Coal Based Thermal Power Project at Kundarki

Clint: - Bajaj Infrastructure Development Company Limited.

Designation: Site In charge, (Feb'011- Till Date).

Computer Skills

Basic Knowledge of DOS, windows. Proficiency in MS-office and internet.

Personal Details

DATE OF BIRTH : 1ST MARCH 1980

MARITAL STATUS : MARRIED

RELIGION : ISLAM

HOBBIES : LISTENING MUSIC

SEX : MAIL

NATIONALTY : INDIAN

LANGUAGE KNOWN : HINDI, ENGLISH & URDU

PERMANENT ADDRESS : S/0-MD.SHARFUZZAMAN

VILL-CHUCKNOORUDDIN

POST-MUKTAPUR

DIST-SAMSTIPUR-848102

PASSPORT NO : J1180445

DATE OF ISSUE : 07-04-2010

DATE OF EXPIRY : 06-04-2020

Declaration

I hereby declare that the information furnished above is true to the best

of my

Knowledge.

Date:

Place:

Md.Muniruzzaman