Post Job Free

Resume

Sign in

Professional Construction Engineer /Project Manager

Location:
Richmond Hill, ON, Canada
Posted:
December 16, 2013

Contact this candidate

Resume:

MATT (MET-HAT) BOUTROS, P.Eng.

** **** ***., ******** **** ON L4S 2R5 Canada. 647-***-**** email: acbpy1@r.postjobfree.com.

A seasoned professional engineer having more than 15 years of successful and solid accomplishments

in construction management, developing structural design and production of architectural/structural

precast concrete envelope, structural restoration, and value engineering analysis (VE). Goal- oriented

and organizes others to achieve peak performance.

PROFESSIONAL AFFILIATIONS

Professional Engineers of Ontario (PEO)

Pre-cast / Pre stressed Concrete Institute (PCI), Chicago.

Egyptian Association of Professional Engineers (EAPE)

PROFESSIONAL DEVELOPMENT:

PCI webinars /studies: lateral forces design Seismic.

Welding Design (AWS & CSA) 2004/ 2006

Psychology of Achievement / Time Management: Brian Tracy, 1995

Studies: BIM (Building Information Modeling)

Rehabilitation of Structures, ACI -Construction Research Centre (CRC)

Pre-cast Concrete Structures, Training in France (Saret Inginere), and Germany (Filigran

semi -precast Construction method (Germany).

Project Management, Lean Management. In-house training.

Safety in Construction, Construction Safety Association.

PROFESSIONAL PROFILE

STRUCTURAL DESIGN

Developed structural design for multi -story commercial and residential buildings including

precast concrete exterior wall in compliance with the applicable building codes and industry

standards.

Provided expertise/advice in planning and design of projects regarding the control of potential

health and safety hazards. Enforced application of OHSA.

Conceived pre-cast concrete systems and structural steel alternatives for some of site-cast

concrete elements of structures to reduce project costs and schedule.

CONSTRUCTION MANAGEMENT

I mplemented a mission-oriented strategy for directing and coordinating human and material

resources through-out the construction phases of the project to achieve predetermined

objectives of scope, cost and quality.

I nvestigated project sites to correlate the plans with existing conditions to determine the

problems and opportunities at the site and to make the necessary professional decisions.

Developed an effective communications and mechanisms for resolving conflicts among the

various construction trades.

VALUE ENGINEERING ANALYSIS

Analyzed projects’ challenges. Generated alternatives and optimum solutions (such as precast

Concrete) that would achieve the essential function, reliably, at lower cost and longer life cycle.

Performed studies into improving safety, necessary repairs and alterations in buildings envelopes

and infrastructure to keep completed facilities in services.

Conducted ongoing research on the most up-to-date construction methods, equipment and

product trends on the international market and studied their impact on design.

Performed an assessment for the materials and items required for use in subject project.

Page 2 of 3

STRUCTURAL REHABILITATION

I nvestigated and diagnosed symptoms of distress and rate of deterioration in building

envelope and for structures such as Arenas, Parking Structures, Schools and Industrial

Establishments.

Conducted analytical assessment and appropriate tests to identify the problems

developed and the most cost-efficient practical methods for upgrading or

rehabilitation.

Designed remedial measures for rehabilitation. Presented the findings and

methodologies of rehabilitation in written technical reports. Supervised and reviewed

on-site restoration/rehabilitation projects.

WORK HISTORY

Engineering Manager/Project Manager

2005 to

Mid-State Precast L.P, Corcoran California. U S

present

(Part of PANKOW Group of Companies):

Assembled and trained a precast engineering and detailing team composed of 5 engineering

detailers performed the work for 60% to 70% of company precast projects.

Managed important projects undertaken by the company from the concept phase to the

completion and close out. The scope including the change orders.

Projects:

Architectural /Structural precast in California, US :

Alameda County Juvenile Justice Center, San Leonardo- 5th Appellate Courthouse, Fresno

Jack London Square 7- Story Parking Structure, Oakland 6 M Project - 2100 Franklin Hi Rise. ( San

Francesco)

17 Pre-Fast Schools – Willow International College, Fresno, Cal Poly Construction Management

Bldg. San Louise Obispo - Galen Center USC, LA - U C Merced Engineering building. Merced, CA

Paramount Citrus (Precast Complete Solution), Delano.

1996 Plant Engineer / Engineering Manager.(holder of C of A

ARCHITECTURAL PRE-CAST SYSTEMS INC. (APSI), Ontario, Canada (1.5 million Sq. ft a year.~$30 M ):

to

2005

Developed structural design for multi -story commercial and residential buildings including

precast concrete exterior wall in compliance with the applicable building codes and industry

standards. Verify that all components, anchors, supports and reinforcing of the produced panels

w ill safely support all kinds of loads and withstand anticipated temperature changes without

reaction detrimental to function, appearance or safety. Review design of retained engineers.

Conduct value engineering proposals.

Design different concrete mixes to suite the requirements of the finish (color and texture) as per

ACI 211.1 and PCI MNL-122)

Formulate a documented quality assurance system approved by industry agencies having

j urisdiction such as, Precast Concrete Institute PCI . Troubleshoot and resolve problems. Make

corrective action when required.

Ensure that the pre-cast panels are produced, handled, and erected conforming to applicable

requirements of Canadian and American Standards

Provide other trades with detailed draw ings and setting information.

Projects:

Us VA Courthouse Tower, Arlington, Fairfax Corner, Fairfax, Reston Sunrise-Reston, Dominion One at

Jefferson Park, Falls Church

MD Stiles Property, Gaithersburg,

MI Macomb County Building

Canada ON Many of Home Depot, Wal-Mart and SAM’s Club retail stores in cities of Ontario, 50 industrial

Buildings, 26 Multi-story Buildings, and Niagara Falls Casino an Gateway project.

Page 3 of 3

1995 Asst. Engineering Consultant

ONTARIO MINISTRY OF LABOUR, ENGINEERING DEPARTMENT

to

(Professional and Specialized Services. PSS/ Occupational Health and Safety

1996

Performed Pre-development Review (PDR) for new industrial establishment (Group F) to

ensure the compliance with the Building Codes (OBC, NBC), Standards and Ontario

Health and Safety Act.

Assessed structural adequacy of existing Arenas and safety of public buildings.

Recommended upgrading measures for rehabilitation when required.

Reviewed and identified potential hazards and unsafe practice associated with

construction and industrial sites. Determined corrective measure.

1986 Chief Development Engineer

ASCOD (Advanced Systems for Construction and Development), Egypt

to

1993

Projects:

Structural rehabilitation of the OLS School and a commercial Centre. $1.5M

State Council Building (22-storey Tower, Courts Bldg.) $ 7M

Housing Complex (1400 Pre-cast Apt.+ Community Services Such as: market place,

medical center, social club and mosque ) $6M

Structural restoration of recreation Centre $5M

Volunteer Work

Assigned as Industry Juror year 2013 precast studio at USC “Precast Studio final Design Jury

Architectural Precast Concrete Projects” Organized by School of Architecture, U SC, LA. and PCI

West

Participated in rehabilitation work of some deficient and damaged buildings after Cairo

Earthquake, 1992

Publications

Quality Assurance Production Manual for Architectural Precast Systems Inc. and Specialty

Precast Erectors Ltd.

Operating Manual for the precast cladding of the completed projects

Technical Bulletins for Production and Handling the precast concrete in Yard and Jobsite.

Galvanic Reactions of the Dissimilar Metals in connections cast-in Concrete



Contact this candidate