Post Job Free

Resume

Sign in

Power Plant Technician

Location:
Sheffield Lake, OH
Salary:
1,00,000 p.m
Posted:
December 16, 2013

Contact this candidate

Resume:

CURRICULAM VITAE

Post Applied for : INSTRUMENT TECH/FORMAN

Name : Mitesh Kale

Father’s Name : Harishrao .M. Kale

Date of Brarth : 04/08/1968

Marital Status : Married

Natioality : Indian

Passport Details : Number : K 9372111

Place of Issue : Ahmedabad, Gujarat,India

Date of Issue : 30/01/2013

Validity : 29/01/2023

Prmanent Address : A/3/26 Samta Co Operative Society,

P O: T.B.Sanatorium, Gotri Road, Baroda-21.

Contect No :Email: acbpds@r.postjobfree.com/acbpds@r.postjobfree.com

Mobil: +974********/+919*********/+919*********

Qualification :

Sr. Qualification Name of Month & Year Percentage

NO Board/Institute of Passing Obtained

01. S.S.C Guj.Secondery Edu. March-1984 51%

I.P.C.L.School,Baroda

02. I.T.I In Instru Mech I.T.I Tarsali,Baroda. July-1986 65%

03. N.C.T.V.T in Inst. I.T.I Tarsali, Training in March-1991 66%

Petrofil’s Baroda.

Experience Details: Total No of Years – 24 Years

Sr. Company Period Position

No.

01. Qatar Power; Doha, Qatar. Working Under July-2013 To Till Date Inst.Tech

Contract base (MAINTANANCE)

02. CHINA LIGHT & POWER CLP,Bharuch, July-1999 To July-2013 Mast.Tech

India. Working Under Contract base. With

Hofincons Info.plt.

03. Petrofils co.op.Ltd. At Valia, Ankleshwar Sept-1991 To April-1999 Sr.Tech

Guj.

04. Jaison & Hitchson Control.(P).Ltd.-I.P.C.L, Mar-1989 To Oct-1989 Technician.

Nagothane Mah.

05. Syscon Instrument – G.N.F.C. Fertilizer Oct-1988 To Mar-1989 Technician.

Bharuch.Guj.

06. Taylor Inst.Co. India Ltd, - I.P.C.L Baroda, Jan-1987 To May-1988 Technician.

Guj.

Abroad Experience –

At Pressent I am working in Qatar Power 1025 MW & Water Tretment Plant 60

MIGD Under Contract Base.IN MAINTANANCE.As a INSTRUMENT TECHNICIAN

Total – 5 Month

07 Euro Mech.& Elect – ADNOC Refinery, April-1999 To May-1999 Technician.

RUWAIS ABU-DHABI.

08 Costain – DAS-ISLAND, ABU-DHABI April-2001 To May-2001 Technician.

09 Costain – DAS-ISLAND, ABU-DHABI Sept-2003 To Oct-2003 Technician.

10 Costain – DAS-ISLAND, ABU-DHABI Mar-2004 To April-2004 Technician.

11 Costain – DAS-ISLAND, ABU-DHABI May-20051 To June-2005 Technician.

Summary of Experience : More than 24 Years in Process Control Instrumentation

Rotating Equipment Protection ControlSystems Maintenance, Commissioning,Start-up

& Shutdown activities associated with, Refinery, Petrochemical & Power Plant

idustries in India. Also woring experience for Fire & Gas Leak Detection System for

Gas plant & Gas turbine.

Nature Of Work :

Day to day routine check up, Preventive, corrective maintenance,Calibration, Function

Checking, and trouble shooting of all types of plant control instruments. Maintenance of

Siemens based Gas Turbine controls 3x138 MW, Steam Turbine 241MW, Siemens

Teleperm XP DCS & PLC Controlled. Maintenance of Balance of plant (i.e.water

treatment plant, Tank Farm, Effluent Treatment Plant, Cathodic protection, Gas Station), I

had been involved in major shutdown:- Hot gas path inspection. Recommisoning of gas

turbines and Stean turbine.

MAJOR RESPONSIBILITY AREAS

i) Directly responsible for prompt execution of maintenance and calibration

activities. ii) Collection and maintain details of all field instrumentation equipment

details.

iii) Collection of Preventive Maintenance data from Manufacturer’s Maintenance

manuals.

iv) Identifying requirement of manpower and materials for scheduled maintenance

programs.

v) Performs / directs maintenance activities of approved schedule.

vi) Diagnosis of problems or potential problems with related instruments.

vii) Coordinate instrument repair, testing and calibration.

viii) Promptly reports the events and the activities to the Site Maintenance Engineer.

ix) Carry out final inspection on Metering systems and related instruments

following a repair and execute the site cleaning activities.

x) Ensure the handing over of the equipment to Operation and proper working of

the Metering System.

xi) Ensure full implementation of the companies HSE rules and regulation.

xii) Record / Logs daily reports of maintenance and calibration activities and spares

utilization.

xiii) Carries out other related duties such as obtaining work permits in accordance

with the procedures.

xiv) Working knowledge of Personal Computers and Office software.

xv) Should be familiar with Oil Industry safety standards.

xvi) Should be able to speak/read/write English.

Organization :

(1) At Pressent I am working in Qatar Power 1025 MW & Water Tretment Plant

60 MIGD Under Contract Base.IN MAINTANANCE.As a INSTRUMENT

TECHNICIAN

Day to day routine check up, Preventive, corrective maintenance,Calibration, Function

Checking, and trouble shooting of all types of plant control instruments. I have good

knowlege about auma motories actuator.

(2) M/s Hofincons InfoTech & Industrial Pvt Ltd.(Gujarat Paguthan Energy

Corporation, Bharuch, India.)

Company having Instrument maitanance contract for their 655 MW Natural

Gas/Naptha, Dual fuel Combaind Cycle Power Plant occupied with 3 Nos of SIEMENS

make gas turbines (v94.3)and Steam tubine controlled by Simens teliperm xp. Here I am

look after day to day routine,AnualMaintenance Prev.Maintanance,Cort.Maitanance,

trouble shooting in running plant problems also working for Vijay fire system routine &

maintenance for fire & gas detection system. Worked on Dragger Germany gas leak

detection system.

(3) M/s Petrofils co. op Ltd. At valia.

Worked with M/s Petrofils co. op Ltd. At valia worked as instrument technician. This

plant is a continues polymerisation plant, make LURGI, 60 T.P.D capacity. In this period

I have got good knowledge in HONEYWELL DCS, TDC 3000. And Siemens make

Simetic S5100U, S115U. I was involved from project work and involved in cealibration,

loop checking commissioning and installation of filled instrument like all types of

transmitters make Rosemount, ABB Kent Taylor, Nucleonic level measurement,

Microprocessor based mass flow mitter and Acardt make LEVEL TROL over haul of

control valve with leak test, strocke checking, safety valve test and also knowledge of

fault finding in continues polymerisation & polymer yarn Plant.

(4) M\S JAISUN & HITCHISON CONTROL PRIVATE LTD. In M.G.C.C. Indian

Petrochemical Plant

I held calibration of instrument like Pressure Transmitter, Level Transmitter, I\P

Converter, and Temperature Gauges.loop checking commissioning and installation of

filled instrument .

(5) M/S SYSCON INSTRUMENT In G.N.F.C. Fertilizer at Bharuch.

In This Period I held Loopchecking,Commissioning work,Safety Check of Pressure &

Level Switches make switzer, Calibration of Control Valve makes I\L, Acardt,

Messonillian, Fisher Control Valve,

I\P Converter ABB Kent Transmitter Calibration and Installation.

(6) M\S TAYLOR INSTRUMENT CO. INDIA LIMITED. In Indian Petrochemical

Corporation Limited.

During this Period I involved with project work and doing calibration Loop checking

and installation & Commissioning work, of various types of instrument likes R.T.D.

Thermocouple, Control valve, Pressure switches, Level trall Calibration, Maintenance of

Control valv

ABROAD EXPERIENCE:-

MAINTANANCE

(1) At Pressent I am working in Qatar Power 1025 MW & Water Tretment Plant 60MIGD

Under Contract Base.IN MAINTANANCE.As a INSTRUMENT TECHNICIAN

SHUTDOWN JOB

(7) ADNOC Refinery in RUWAIS ABU-DHABI.

As an INSTRUMENT TECHNICIAN in shutdown Job with EURO MECHANICAL and

ELECTRICAL CONTRACTOR In Hydro-cracker Plant, ADNOC Refinery in RUWAIS

ABU-DHABI. Job held Under Observation of wood group control; control valve

overhauling and Calibration make NUOVO PIGNONE BARI, MASSONILLAN,

SHUTOFF VALVE KENT PROCESS CONTROL LTD., INTROL VALVES BRIGH

HOUSE ENGLAND Calibration & stroke Checking & Bench setting of pneumatic

Actuator.

(8) ABU-DHABI ADGAS Train (I) over haul. IN (DAS-ISLAND)

As a INST.TECHNICIAN{UTILITIES} in ADGAS Train (I) over haul. (Job held

under Observation of COSTAIN. control valve calibration, pressure switches,

Transmitters Flow switches & Level switches calibrations,& Plant Commissioning &

Loopcheking work.

(9). (10). (11) ABU-DHABI ADGAS Train (III) (I) (II) over haul. IN (DAS-ISLAND)

As a INST.TECHNICIAN in ADGAS Train (III) over haul Job held under Observation

of COSTAIN. All types of control valve & positioner Overhauling and Calibrations.

Calibration & strokeChecking & Benchsetting of pneumatic different types of control

valves Like globe valves, butterfly valves, angles valves etc. Checking of ON-OFF

valves, solenoid valves, limit switches etc. Calibration & checking of I/P converters &

valve positioner.

Nature Of Work :

Day to day routine check up, Preventive, corrective maintenance,Calibration, Function

Checking, and trouble shooting of all types of plant control instruments. Maintenance of

Siemens based Gas Turbine controls 3x138 MW, Steam Turbine 241MW, Siemens

Teleperm XP DCS & PLC Controlled. Maintenance of Balance of plant (i.e.water

treatment plant, Tank Farm, Effluent Treatment Plant, Cathodic protection, Gas Station), I

had been involved in major shutdown:- Hot gas path inspection. Recommisoning of gas

turbines and Stean turbine.

Analyzer

1. Chlorine analyzer – Make:- Wallace and Ternan.

2. pH analyzer - Make:- Rosemount and Endress Hauser

3. Conductivity analyzer – Make:- Rosemount and Endress Hauser

4. H2/Co2 Analyzer Make:H&B - ABB

5. Continue Amition Monitoring System. ( CEMS )

Actuators : Worked on auma Germany, auma India, Rotork and Siemens make SIPOS

programmable thyristor controlled actuators.All type of Pnumatic Actuator’s.

Flow Measuring Instruments : Worked on Rosemount, Siemens make DP type flow

transmiter & Turbine flow meter.

Level Measuring Instruments : Worked on DP type level transmitter, Displacer type

level transmitter, Capacitance type level transmitter, Ultrasonic type level measurement,

Different types of level switches.

Pressure Measuring Instruments : Worked on Rosemount, Siemens make Pressure

transmitters and Switzer & Indfos make pressure switches and pressure gauges.

Temperature Measuring Instruments: Worked on PT –100 4-wire RTD &

Thermocouples and Temp. switches & Temp. gauges

Vibration system: - Worked on Proximity relative displacement type vibration

monitoring system and Absolute vibration - Velocity transducer type (moving coil)

vibration monitoring system (General Monitor USA and Vibrometer Switzerland).

Fire Alarm and Detection System :-

Maintenance of Fire Detection System BS-100 fire alarm panel. Bs-100 panel is

Microprocessor based intelligent panel. Its main processor continuously pooled all loop

processor.

1) Addressable analogue ionization & optical type smoke detector.

2) Non addressable analogue ionization & optical type smoke detector.

3) Beam detector.

4) Manual call point.

5) Addressable interface unit.

6) Addressable analogue linear heat sensor cable (LHS)

Hydrant system basic fire protection system provided for entire power

lant area.

HVWS,( High velocity water spray system) Automatic fire protection system provided

for lube oil tank of G.T. and for all transformers. Cable galleries, Cable celler.

Sprinkler system for G.T. & transformers.

Co2 Extinguishing system for G.T., combustion chamber,CCR.

> Gas Leak Detection System :-

Worked on Dragger Germany gas leak detection system. The gas detection

system is designed for the detection of Naptha, High speed diesel and leakage of

Methane, Propane, Butane with instrument ranges of power station and gas plant. It

consists of measuring head with infrared sensors. All are the flammable gases. They are

of Dragger make Polytron IR E x & Pelistor sensors. These are located in critical location

of gas turbine combustion chamber, where 2 V 3 logic is used for tripping the machine,

also installed in tank farm and other location in the plant. Pellistor type gas detector used

in a Neptha and HSD tank farm area. System supplied by Detection Instrument.

COMPUTER PROFICIENCY:

Knowledge of windows operating system, Maximo software package & SAP used

for maintenance of 655mw-ccpp power plant at Gujarat.

CURRENT SALARY :6 lakhs Rupees P/A

ASPECTED SALARI :10 Lakhs Rupees P/A

Moreover i want a notice period of atleast 15 days.

Place : Baroda Mitesh

Kale



Contact this candidate