Post Job Free

Resume

Sign in

Estimator

Location:
Seoul, South Korea
Posted:
December 13, 2013

Contact this candidate

Resume:

SUMMARY

More than eight (*) years of Estimating, Quantity Surveying, Contracting,

Construction, Field Engineering, Plant Operation and Maintenance and

Quality Control Inspection. Enhancement of Civil / Structural / Mechanical

/ Electrical and Piping works specifically in HYDROCARBONS, POWER,

INFRASTRUCTURE and MINING construction and development projects. Overseas

works focused mainly on Estimating/Quantity Surveying/Quality Control

Inspection with Saudi Aramco and AGIP KCO in Kazakhstan. Very familiar with

corporate estimating procedures and process with contract management and

associated tools in the construction contracting aspect of major On-Shore

Oil and Gas Plant and Facilities projects, Mining, Infrastructure and Major

Equipment Installations with the requirement of contract terms and project

reporting. Highly experienced of working on in a Lump sum / Turn Key, Re-

measurable EPC contracts for large construction sites and in a multi-

cultural work environment.

EXPERIENCE

August 2013 Cost Estimator - ARAMCO Overseas Co. BV.

- Present

Rabigh 2 Project -A joint venture between Saudi ARAMCO & Somitomo

Chemical Company. This project consist of the expansion of the

ethane cracker and building new aromatics complex, will use

additional 30 million standard cubic feet per day of ethane and

approximately 3 million tons per year of naptha as feedstock to

produce a variety of high value-added petrochemical products. Each

plant will be brought on stream as it becomes available for

operation beginning the first half of 2016.

* Provide overall estimating technical expertise

as well as supervision leadership required.

* Conduct reviews of estimates developed by

estimating engineers and/or analyst to ensure

accuracy and thoroughness.

* Prepare and plan the estimate.

* Provide/ensure a consistent approach to all

functions of estimating for both tenders and

contracts.

* Identify interfaces and timing for estimate

production.

* Check the availability, scope and quality of

technical and other information.

* Prepare concise estimates indicating all

required financial information available,

confident all financial and commercial aspects

have been considered in injunction with COMPANY

Engineering and Management Specialists and

Departments.

* Prepare for each funded project the Initial

Control Estimate for each contract as a basis

for Cost Control from which future forecasts

and trends can be developed in support of the

Project Cost Engineering function.

* Maintain and update estimating statistics, and

data thus providing comprehensive and reliable

source of information in order to achieve total

estimate values that can be utilized with

confidence.

* Ensure that all classification of estimates are

developed where necessary and that basic costs

are defined and comply with specifications

including work / cost breakdown structure (WBS)

in accordance with Company and/ or Client

Procedures.

* Prepare estimated coded in accordance with the

Company Cost Coding structure for project

standardization and data feedback.

* Prepare estimate for Management Review and

Approvals, in accordance with Company

Procedures.

March Estimator/Quantity Surveyor - WorleyParsons Arabia Ltd., KSA

2011-July

2013

SAMREF Clean Fuels Project - SAMREF will undertake modifications

to its Yanbu Refinery in Saudi Arabia to comply with the 2013

mandatory specifications for gasoline with 10 ppm sulphur, 10%

benzene and diesel with 50 ppm. In addition, diesel with 10 ppm of

sulphur will be mandatory by 2016.

* Validation and signoff of Contractor takeoffs

on cost summaries against IFC engineering

drawings, schedules or equipment lists.

* Audits of claimed quantities installed and

signoff of payment certificates, with

responsible superintendent.

* Regular review of the forecast contract key

quantities by discipline by Contract per the

PBOQ. Forecast quantities are published thru

the Engineered Quantity tracking reports

reviewed and issued from the Detail Design

Project Controls group.

* Issue forecast data to Lead Cost Engineer for

inclusion by monthly trending.

* Provide check estimates against Contractor

priced items. This will take the form of audit

of Contractor's submitted quantities and

pricing. Where necessary (large value or new

items where existing comparative pricing is

unavailable) additional quotations will be the

sourced if available from other companies.

* Normalization of Contractor or other estimate

information to the budget man-hours in the

baseline project estimate.

* Audit man-hours on Contractor Cost Summaries,

overall man hour forecast information.

* Establishment of new contract rates and

preparation of in-house estimates of the

potential variation.

Oct 2009 - Estimator/Quantity Surveyor - Bonatti SpA. Co.,Atyrau, Kazakhstan

Dec 2011

AGIP KCO - Construction of Oil, Gas and Suphur Plant Project -

Engineering and Construction of West Eskene Producing Fa\cilities

in Kashagan Oil Field.

* Preparation of Bill of Quantities/MTO from the

drawing & specification. Develop methods of

measurements suitable for the job requirements.

* Maintain records and track BOQ Measurements

(Bill of Quantities)/Made-to Order according to

the approved drawing Issued for Construction

(IFC).

* Check, verify and maintain record of built/site

measurement and quantifications for further

approval of the Construction Manager.

* Support and provide input at tender stage for

prices and rates.

* Invitations, receipt of bids, evaluation,

review of Subcontractor's price, previous work

experience and their performance. Drafts

preparation of procedure for contracts and

subcontracts agreements.

* Analyze the rates submitted by the

subcontractors' and implications from the

execution point of view. Verify subcontractors'

interim and final payments applications in

coordination the site Engineers; present them

for the further approval of the Construction

Manager.

* Evaluate subcontractors' claim and variation s

and prepare response to such claims.

* Maintain technical records of the site

meetings, issues related to drawings, direct

labor hire/supply of plant, free issue

materials and changes in the scope of work and

any other specifications.

* Coordinate, verify and keep track of third

party service on day-to-day basis directly

hired by CLIENT in the situation wherein the

subcontractor is unable to perform and meet the

project deadline.

* Verify approved third party invoices, liaison

with them and check if the services are back

chargeable to the subcontractor.

* Maintain records of the free issue materials,

manpower and equipment sourced the company when

the subcontractor is unable to directly source

the same.

* Maintain accurate records and data to unable

the Construction Manager to resolve contractual

conflicts and disputed claims with the

subcontractors.

* Implementation and adherence of HSE System

procedures and plans.

Oct 2006 - Quality Control Inspector/Quantity Surveyor-Estimator - Al-Marri &

Oct 2009 Sons Co., KSA

Khursaniyah Well Site Development and Communication Project -

Construction of and Development of 21 Units of Oil Well Sites, 18

Units of Water Injection Sites, Cross Country Pipelines,

Electrical, Instrumentation and Communication.

* Ensure that all Electrical & Instrumentation

activities are being done accordance with the

Scope of Work, Standard Drawings and SAUDI

ARAMCO Engineering Standard (SAES).

* Issuance of Request for Inspection (RFI) to

SAUDI ARAMCO PID as defined by the Inspection

Typical Plan (ITP).

* Assist the ARAMCO PID to carry out site

inspection and release hold points by signing

and obtaining the SAUDI ARAMCO representatives

and approval signatures and various quality

records as proof of inspection conforming to

specifications.

* Preparation of Bill of Quantities/MTO from the

drawing & specification. Develop methods of

measurements suitable for the job requirements.

* Maintain records and track BOQ Measurements

(Bill of Quantities)/Made-to Order according to

the approved drawing Issued for Construction

(IFC).

* Check, verify and maintain record of built/site

measurement and quantifications for further

approval of the Construction Manager.

* Support and provide input at tender stage for

prices and rates.

March 2004 - Sr. Industrial Electrician, Tanduay Distillers Inc.,Philippines

August 2006

Plant Operation and Maintenance - Production and Bottling of Wine

and Beverages

* Provide support for the continuous improvement

of factory operations through the definition of

maintenance and process control systems to

achieve testing integrity, improved equipment

stability and reliability maintenance.

* Review equipment and related

peripherals/attachments performance trend and

conduct root cause analysis of major or

recurring failure.

* Monitor progress / performance of defined

projects ensure 100% proliferation and complete

objects result and maintain equipment

standardization.

* Define and document prescribes equipment

maintenance system and procedures including

preventive maintenance (PM) and calibration,

routine maintenance procedures, quality and

process system.

January 2003 Industrial Electrician, Anglo Watsons Glass Inc.,Philippines

- February

2004

Plant Operation and Maintenance - Production and Bottling of Wine

and Beverages

* Provide support for the continuous improvement

of factory operations through the definition of

maintenance and process control systems to

achieve testing integrity, improved equipment

stability and reliability maintenance.

* Review equipment and related

peripherals/attachments performance trend and

conduct root cause analysis of major or

recurring failure.

* Monitor progress / performance of defined

projects ensure 100% proliferation and complete

objects result and maintain equipment

standardization.

* Define and document prescribes equipment

maintenance system and procedures including

preventive maintenance (PM) and calibration,

routine maintenance procedures, quality and

process system.

EDUCATION

Associate in Bachelor of Science in Electrical Engineering (3

Years Electrical Tech.)

University of Cagayan Valley, Philippines

Philippine Government Scholar



Contact this candidate