Curriculum vitae
Objective :- An exciting career with a firm that makes best use of my
skills, experience and knowledge, which gives me enough challenges that
will inspire me to give my best.
Employment Profile:-
Working as Manager (Electrical & Instrumentation) since August 2011 in M/s
Sarda Metals and Alloys Ltd., Kothavalasa, Vizianagaram dist.
Worked as Dy. Manager (Electrical & Instrumentation) from 2008 to 2011 in
M/s Jindal Stainless Ltd., Kothavalasa, Vizianagaram dist.
Worked as Asst. Manager (Electrical & Instrumentation) from 2006 to 2008 in
M/s Jindal Stainless Ltd., Kothavalasa, Vizianagaram dist.
Worked as Sr. Engineer (Electrical & Instrumentation) from 2005 to 2006 in
M/s Jindal Stainless Ltd., Integrated Steel Plant, Kalinga Industrial
Estate, Dubri Works, Jaipur.
Worked as Site Engineer in Rally - Tech Services Ltd, from 2003 to 2005, S-
104, Sitaram Nivas, Prahladapuram, Visakhapatnam.
Worked as Engineer (Electrical & Instrumentation) from 1998 to 2003 in
Jindal Strips Ltd., Kothavalasa, Vizianagaram (dist).
Project AND MAITENANCE Experience :-
2 X 33 MVA Submerged Arc Furnace(Si-Mn) Erection, Commissioning and
Stabilization.
80 MW Thermal Power Plant Erection, Commissioning and Stabilization.
2 X 60 MVA Submerged Arc Furnace (Fe - Cr) Erection, Commissioning and
Stabilization.
27.5 MVA Submerged Arc Furnace (Fe - Mn) Erection, Commissioning and
Stabilization.
13 MW Waste Heat Recovery Power Plant Erection, Commissioning and
Stabilization.
16 MVA Submerged Arc Furnace Erection, Commissioning and Stabilization.
7.5MVA Submerged Arc Furnace Erection, Commissioning and Stabilization.
2 X 6.2 MW Wartsila diesel power plant Erection, Commissioning and
Stabilization.
Raw material Handling Plant Erection, Commissioning and Stabilization.
100 TPH Briquetting plant, 20 TPH Rotary kelin for chrone ore drying
Erection, Commissioning and Stabilization.
220 KV GIS Erection, Commissioning and Stabilization.
220 KV / 33 KV AIS Erection, Commissioning and Stabilization.
132 KV / 11 KV AIS Erection, Commissioning and Stabilization.
De - Dusting Plant Erection, Commissioning and Stabilization.
Stacker and Reclaimer Erection, Commissioning and Stabilization.
Coal Handling Plant Erection, Commissioning and Stabilization.
Zigging Plant Erection, Commissioning and Stabilization.
Metal recovery Plant Erection, Commissioning and Stabilization.
Pig Casting Machine Erection, Commissioning and Stabilization.
Job PROFILE:
A ) Project Execution and Maintainace of 2 X 33 MVA Submereged
Arc Furnace (Electrical and Instrumentation Equipment).
12 MVA Furnace Transformers.
85 MVA, 12.5 MVA, 5 MVA, 2.5 MVA Power and Distribution Transformers.
33KV HT Switch Gear.
6.6 KV HT Switch Gear.
PCC, MCC, AUXILIARY DB, LDB, VFD ' S.
HT Motors, LT Motors.
50T / 20T EOT Crane.
Hydraulic Equipment.
Allen Bradley PLC.
Remote I / O Panels.
Field Instruments, Load Cells, Level Transmitters, Thermocouple, RTD,
Pressure Transmitter, Flow Switches.
Batching Controller, Belt Weigher Feeders.
16.8 MVAR, 8.4 MVAR Capacitor Banks.
B ) Project Execution and Maintenance of 80 MW Thermal Power
Plant
95 MVA, 15 MVA Power Distribution Transformers.
220 KV SF6 Breakers, 33 KV Breakers.
6.6 KV Breakers.
40T / 20T EOT Crane.
PCC, LIMCC, LDB, PDB.
110 KVA Transformers for ESP.
HT Motors, LT Motors, Drives
Field Instruments.
RMP, Synchronization, AVR Panels.
Experience Profile:-
60 MVA Submerged arc Furnace Electrical and Instrumentation Equipments
Maintenance.
27.5 MVA Submerged arc Furnace Electrical and Instrumentation Equipments
Maintenance.
16 MVA Submerged arc Furnace Electrical and Instrumentation Equipments
Maintenance.
7.5 MVA Submerged arc Furnace Electrical and Instrumentation Equipments
Maintenance.
13 MW Waste Heat Recovery Power Plant Electrical and Instrumentation
Equipments Maintenance.
2 X 6.2 MW Wartsila diesel Power Plant Electrical and Instrumentation
Equipments Maintenance.
Raw Material Handling system.
Hipath 1199 Siemens make Telephone exchange.
Temperature, Pressure, Humidity, Displacement, weight measuring and
control.
IPA Make Belt Weigher system.
ISS Make weighing & Batching system
Thermax & Manic controls Air pollution Plant (Bag house)
Control logics (Electrical & Instrumentation)
Protection relays & metering
Utilities, crawl crane, Coles crane, Air Compressors, cooling towers.
ISO 9001, 2000 Document works, Internal auditing.
SAP based PM Module
De - Dusting Plant (Reverse Air Bag Filters).
Briquetting Plant Koperan make.
HT & LT Switch Gears.
11 KV / 440 V substation of capacity 3 MW.
6.2 MW Wartsila make diesel power plant
ABB 800 XA plc
ABB 400 X PLC
Handling process parameters control and monitoring instruments like
displays, controllers, recorders, level and pressure, switch, weighing
systems, Transducers, Encoders, sensors and Transmitters.
Design of LT panels, MCC, PCC, lighting distribution panel.
Handling of LT motors, Cranes, Diesel generators Cummins.
Zigging plant, Wet table plant, Metal recovery from slag plant.
Preparing I/O list as per P &I drawings and channel wise I/O allocation,
cable & junction box scheduling and routing.
Education Profile:-
Bachelor of Engineering in Electronics & Instrumentation.
Computer Knowledge:-
PGDCA,C Program
Personal Achievements:
Project work accomplished by us is taken by ABB.
Solar tracking system.
Economization of UTM Pulper.
Thickness control using PWM Technique.
Control of Industrial Plant using mobile.
Energy Management.
Personal Profile
Name : G. Victor Vinuthan Kumar
Father's Name : G.I. Bhaskar
Date of Birth : 08.07.1974
E. Mail & Mobile : acba02@r.postjobfree.com,acba02@r.postjobfree.com
acba02@r.postjobfree.com
Marital Status : Married
Address for Communication : H. No. 7-105/1, Prasanthi Nagar,
Gopalapatnam,Visakhapatnam.
Pass Port Number : K9440504
Languages Known : Telugu,Hindi, Kanada, English.
I here by declare that the information furnished above is complete
and correct to the fullest extent of my knowledge. I will be ever grateful
to you, if given an opportunity to render my services to your esteemed
organization.
Place :
Date :
G. Victor Vinuthan Kumar