**** *** ** ***** #**** Crestview, FL *****

CELL 574-***-**** . E-mail acb33c@r.postjobfree.com

Timothy J. Cordes

Summary of Qualifications

An enthusiastic team player with high ethical standards

Exceptional leadership and communication skills

Accustom to working in a fast paced environment requiring

attention to detail and accuracy

Accomplished estimator, project manager, superintendent with

extensive multi-industry experience

Trench-hardened expert in managing and motivating subordinates

Track record of meeting deadlines and exceeding expectations with

high visibility projects

Excellent computer skills in a windows environment utilizing

Microsoft Word, Excel, Power Point, Publisher and Adobe Standard

and Illustrator

Proficient use of estimating and managing software to include

Accu-bid, EBM, Timberline, MS Project, Primavera and Excel based

programs

Effective writing skills using various styles to address different

needs and audiences

Strong ability to identify value engineering opportunities and win

quality work

History of establishing contractor and customer trust, turning

plan and spec projects into negotiated projects

Experience working with vendors, scheduling materials, staging

materials, issuing materials and controlling inventory

Self sufficient preparing estimates, scope letters, RFI's, change

orders, submittals, pay applications, labor projections, job cost

projections, monthly cost reports, job schedules and O&M Manuals

TECHNICAL qualifications/experience

Project management

Estimating

Service department management

Design Build

Industrial, Commercial, and Institutional wiring

Class I Applications

Systems Integration & Process Control

Telemetry and Scada communication systems

Industrial Controls

Infrared, power analysis and electrical testing equipment

High Voltage Splicing and Testing

Fire Alarm coded and addressable systems

Information Technology

Computer Floor wiring systems

HVAC Automation and Energy Management Systems

Power plants

Switchyards and substations

Transmission Lines

Professional experience

2011 - 2013 Blattner Energy, Inc. Avon, MN

Electrical Superintendent

Principal Projects

Supervised electrical installations, inspection and commissioning

of the following projects

Perrin Ranch Wind Farm - Williams, AZ - 99.2 MW Wind Generation

Plant

34.5kV underground collection system - 345,000'

525 - 138kV switchyard

138 - 34.5kV substation

Canadian Hills Wind Farm - El Reno, OK - 298 MW Wind Generation

Plant

34.5kV underground collection system - 201,000'

8 mile 2Ckt 34.5kV overhead collection line

20 mile 345kV bundled 795 ACSR

345 - 34.5kV substation

Blue Summit Wind Farm - Vernon TX

7 mile 345kV T-line replacement

Lone Star Transmission Line - Texas

220 mile 2Ckt 345kV Bundled 1590 ACSS

Prairie Breeze Wind Farm - Elgin, NE - 201 MW Wind Generation

Plant

34.5kV Underground collection system - 492,000'

2009 - 2011 Brint Electric, Inc. Toledo, OH

Project Manager/Estimator

I Acquired over $5 million in Industrial projects during first

year while developing relationships with premier contractors to

form partnerships.

Project Management/Estimating

Bay View WWTP - Medium voltage distribution upgrade $3.6 Million

Bay View WWTP - PH Neutralization $380,000

Perrysburg WWTP - Plant Automation $550,000

Southwest Pump station upgrade for Lucas County $340,000

Fostoria WWTP - Lime Sludge Press $180,000

Findlay Airport - Taxiway Lighting Phase I & II $360,000

Estimated and managed above projects simultaneously.

Utilized Accu-bid estimating software

2008 - 2009 MJ Electric Iron Mountain, MI

Project Manager

Project Management

Jeffery Energy Center (St. Mary's Kansas) 3 - 800 MW Coal burning

power plant Flue Gas Desulphurization $22 million Electrical

Managed field staff of 2 - field engineers, QA/QC, Safety Manager

and

2 - Superintendents. Project peaked at 130 craftsmen.

Installation of 13.8KV secondary transmission transformers/ISO

phase and distribution for scrubbers

New Limestone and Dewatering buildings and conveyors

Flue Gas Path retrofit including ID fans

Company added 2% net profit to bottom line halfway through second

outage

Schedule deadlines were met and LD's dissolved throughout project

We assumed over $2 million in additional work prior to project

completion

Adhered to and managed weekly financial and labor reports

Utilized Primavera P6

2005 - 2008 Lake Erie Electric, Inc.

Toledo, OH

Project Manager/Estimator

Managed multiple projects simultaneously while continuing to

estimate. Estimated and managed all industrial projects. Created,

managed and nurtured industrial service contracts and

relationships.

Service Accounts and Contracts

Spartan Steel (Monroe, MI Facility)

Georgia Pacific Corporation (Milan, MI Facility)

Con Agra Foods (Rossford, OH Facility)

Eaton Aerospace (Jackson, MI Facility)

Project Management and Engineering

Menards Distribution Center (Holiday City, OH) - 3.5 Million

electrical

Originally a $2 Million project

Estimated and negotiated an additional $1.5 million in building

contracts and equipment installation

Through teamwork and motivation, this project netted over 20%

profits. The customer's appreciation for my professionalism and

project knowledge led to a strong relationship and additional

projects for the company.

Spartan Steel Coating (Monroe, MI) - $1.3 Million electrical

Furnace Upgrade, Cooling System Installation, Furnace Pre-heat

upgrade

Peak Manpower 18 electricians 1 foreman

With pre-planning and experience, this project netted nearly 30%

profits. Our coordination with the mechanical contractor and

strict adherence to project scheduling thoroughly impressed the

customer as well as the project engineer. Our outstanding

performance led to continuing customer relationships and private

project invitations from the engineer.

United States Enrichment Corporation (USEC) - $18 Million

electrical

Depleted Uranium Hexafluoride conversion project

Project Peak Workforce 150 + working 6 - 12 hr shifts

Assistant project manager and process controls engineering support

Issued RFI's and priced FCO's

Formulated monthly project reports, bi-weekly schedules and

billings

Created instrument conduit and cable spreadsheets derived from the

engineer's instrument lists and loop drawings, vendors P&ID's and

construction drawings. These spreadsheets provided pull sheets and

termination points for the field and produced an incredible amount

of missing I/O points, wires and conduit runs. My involvement and

experience with process controls significantly increased the

efficiency of the work force and curtailed serious project delays.

Project Management

Maumee River WWTP $1.7 million

Plant Renovations and additions

Doubled Plant Capacity

I recovered this project from a former PM. Implemented a much

needed safety program and look ahead mentality. I immediately

structured a schedule and cost analysis for the project, brought

change orders up to date and maximized labor efficiency.

Delta WTP $750,000

Milan WWTP $820,000

Complete Renovation

Awarded contract based on value engineering

Sub-Contracted Systems Integrator

Bedford WWTP $ 530,000

Sludge Storage Upgrade

Huron WWTP $1,450,000

Plant Automation and renovation

Sub-Contracted Systems Integrator

Estimated and managed above projects simultaneously. All projects

were completed on time and with-in budget.

Utilized Accu-bid estimating software,

1999 - 2005 Trans Tech Electric L.P. South Bend, IN

Estimator/Project Manager

Estimating

GM Plant - H3 (Shreveport, LA) $20 Million

Puerto Rico Hotel & Casino $18 Million

Blue Chip Casino - Gaming Vessel $3.2 Million

11KW Peaker Plant - SW Michigan 11.2 million

Project Management

Honeywell New 15 KV bypass ($447,000)

Estimated project with-in 2% of next bidder

Re-designed feeder installation resulting in $20,000 material

savings

GRSD New Buffalo WWTP ($1,300,000)

Estimated and negotiated based value engineering

AM General H2 - New Plant Construction

Administration/General Assembly ($1,980,000)

H2 Body Shop Installation ($2,330,000)

Waste Water Treatment Facility ($379,000)

Fluids Tank Farm ($287,000)

Estimated and managed AM General contracts simultaneously. 70 - 90

electricians peak manpower during plant construction. One general

foreman three sub-foremen. Sub-Contracts with Stevens Painton,

(CCC) Commercial Contracting, (IICC) International Contracting,

and Lamb Technologies.

Virgil Water Treatment Plant ($947,000)

Estimated, negotiated and awarded based on value engineering

Sub-Contracted systems integrator (CSI)

Designed and built control panels

Provided value engineering to help bring contract with-in budget

AM General H2 SUT Body Shop Expansion ($1,879,000)

Estimated project with-in 3% of second bidder

Two shut downs, three shifts

Project resulted in 30% profit

Sub-Contracted through International contracting

Peak manpower 55

Chesterton Waste Water Treatment Facility ($949,000)

Re-engineered and designed several systems to customers

satisfaction which resulted in $80,000 in change orders

Prepared monthly job cost projections and budgets.

Targeted and developed contractor and customer accounts for

construction and service departments

Service Department Manager

After 2 years with the company I was promoted to service manager.

2 Service estimators

Dispatcher

Billing Coordinator

Superintendent

18 Service Technicians w/trucks

Managerial duties included:

Customer relations

Establishing service contracts

Estimating

Project Management

Cost Projection

Invoicing

Marketing

Purchasing

Estimated numerous projects ranging from $300 - $300,000

Negotiated service contracts and agreements

Implemented lighting and generator maintenance programs

Organized training classes for field technicians

Maintained a 22% average margin on service projects

Consistently billed $280,000 - $350,000 monthly

Principal Projects:

ALFE Heat Treat Systems "New Facility" (Saginaw, MI) $650,000

Furnace, Quench Tank, Age Oven and Conveyors

Completely Automated

Utilized local union manpower

My intimate involvement with this project resulted in $200,000 +

in change orders. I lost a foreman half way through the project

and didn't miss a beat. Worked through union steward and manpower

issues by negotiating a contract with a local contractor.

SBCSC Nuner Elementary School - New Construction $1,580,000

Minnell Milling - Automation Design Build $340,000

Culver/Monterey Elementary Schools - New Construction $1,415,000

Century-Tel Mission Critical Facility $190,000

McCloud Mission Critical Facility 245,000

Utilized Accu-bid estimating program

Prepared monthly job cost projections and budgets.

Targeted and developed contractor and customer accounts for

construction and service departments

FIELD EXPERIENCE

1992 - 1999 Local 106 IBEW Jamestown, NY

Journeyman Electrician/Forman/Project Manager

Principal Projects

Air National Guard Jet Fuel Storage Facility - Forman

(Pittsburgh, PA)

2 year project with the Army Corp of Engineers

Completely automated class 1 and intrinsic wiring

Dunkirk Co-Generation Plant (Dunkirk, NY)

3 Boiler replacement

Olean Co-Generation Plant (Olean, NY)

Turbine retrofit

Buffalo Airport Renovation (Buffalo, NY)

North Gate expansion

Concourse additions

Redwing Foods (Fredonia, NY)

Syrup line installation

Cummins Engine Plant (Jamestown, NY)

Energy management system installation

Cam line renovation

1984 - 1992 Bayshore Electric

San Jose, CA

Journeyman Electrician/Foreman/Field Superintendent

Principal Accounts and Projects

Bio Chemical Testing Facility (Hollister, CA)

Sun Micro-systems (Sunnyvale, CA)

Computer floor wiring installations

Office renovations

Integrated Device Technologies (IDT) (Milpitas, CA)

Clean room wiring projects

Waste water treatment facility installation

Adaptec Technologies (Milpitas, CA)

Digital Technologies (San Jose, CA)

Memorex Tape Plant (San Jose, CA)

Sub Station installation

ESL (Division of TRW) Dept. of Defense

"Critical Path Systems" Security & Communication Infrastructure

installation

1981-1984 Circle K Corporation

Phoenix, AZ

Maintenance Electrician

Commercial service

Sign Maintenance

Energy Management System installations

HVAC

Responsible for 175 locations

Education & CertificationS

Graduate - McClintock High School (Tempe, AZ)

IBEW apprenticeship (Jamestown, NY)

NY State Master Electrician Certificate

Industrial Motor and Control Classes

PLC Classes

Code Update Classes

Quanta Services - Project Management Training

NFPA 70E Training and certification

OSHA 30

Summary

I am looking for a career and a home with a reputable company that

appreciates and rewards their work force for a job well done. I am

willing to relocate and travel. I bring to the table a wealth of

skill and knowledge acquired from vast experience in the

electrical industry. My professionalism, experience and demeanor

have consistently earned me the respect of customers, engineers,

co-workers and sub-ordinates. Thank you for your interest and

consideration.



Contact this candidate