CHAD ELY
**** ********* **., ********, ** *****
CELL PHONE: 614-***-****
acb304@r.postjobfree.com
DEGREE: B.S., ELECTRONICS ENGINEERING TECHNOLOGY
COLLEGE: DEVRY UNIVERSITY
**** **** ***** **., ****MBUS, OH 43209 614-***-****
GRADUATED: OCTOBER 2005 WITH A GPA OF 3.54
AEP (OCT 2010 – JUNE 2013)
WORK HISTORY:
DOLAN TECHNOLOGY CENTER, 4001 BIXBY RD., GROVEPORT, OH 43125
TEST ENGINEER
CREATE TEST CASES BASED ON THE ZIGBEE SMART ENERGY 1.0 PROFILE AND
PROVIDED FEEDBACK TO THE ZIGBEE ALLIANCE FOR CHANGES IN SEP1.1 AND
SEP 2.0
TEST PCTS, IHDS, LCSS ON GE ELECTRIC METERS EQUIPPED WITH A SSN NIC
CARD FOR USE IN THE AEP OHIO GRIDSMART DEMONSTRATION PROJECT
WORK WITH VENDORS TO RESOLVE PRODUCT DESIGN AND SOFTWARE ISSUES
TEST & EVALUATE VARIOUS SMART ENERGY PRODUCTS FOR POTENTIAL USE IN
OTHER SMART GRID DEMONSTRATION PROJECTS
ASSURANCE TECHNICAL SERVICES (APR 2008 – OCT 2010)
400 PARK AVE., DELAWARE, OH 43015 740-***-****
TEST ENGINEER
PERFORMED DATA COLLECTION OF ENVIRONMENTAL AND DUT INFORMATION
TO MONITOR ALL ASPECTS OF OUR TESTING
PERFORMED ADJUSTMENTS AND CALIBRATIONS OF ALL INSTRUMENTS AND
SENSORS USED
DESIGNED, DOCUMENTED AND BUILT CUSTOM TEST SETUPS AND CONTROLS
REQUIRED FOR FUNCTIONING THE TEST SPECIMENS
CONTROLS ENGINEER
DESIGNED, DOCUMENTED AND MANUFACTURED STANDARD AND CUSTOM
CONTROLS FOR PUMPS, FANS, HEATERS AND BOILERS
CONTINUALLY UPDATED AND ADDED MORE FEATURES AND CONTROLS TO
EXISTING CONTROL BOXES
PLANT ELECTRICIAN
UPDATED DOCUMENTATION OF A 480V 800A ELECTRICAL SYSTEM
INSTALLED MAIN DISCONNECTS, BRANCH PANELS, FUSED DISCONNECTS,
CONDUIT AND PULLED WIRES FOR NEW EQUIPMENT
UPDATED MUCH OF THE OLD WIRING TO NEW WIRING CODES AS POSSIBLE
ANDREW CORP. (AUG 2007- APR 2008)
DESIGNED AND MANUFACTURED RF TEST FIXTURES FOR FACTORY TESTING
PROVIDED ENGINEERS WITH DESIGN DOCUMENTATION USING VISIO
DESIGNED UPDATES TO CURRENT RF TEST FIXTURES AND TEST RACKS FOR
CHANGES WITH THE AMPLIFIER
ASSISTED WITH THE SELECTION AND PURCHASE OF NECESSARY COMPONENTS
FOR THE ASSEMBLY OF RF TEST FIXTURES
WROTE MODULES IN VB.NET 2005 AND VB6 TO ANALYZE THE TEST DATA
ASSEMBLED BURN IN RACKS USING POWER SUPPLIES IN EXCESS OF 10KW