Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Millesimo, Liguria, Italy
Posted:
January 08, 2014

Contact this candidate

Resume:

VYACHESLAV VERDESH*, ENG.

**-**** ********** ********* ********

Loc. Piangiaschi 32/2, I-17017 Millesimo (SV)

acb1s4@r.postjobfree.com

+372-**-******, +39-349-*******

PERSONAL DATA

Russian national and citizen; born on 2nd of May 1975 at Hincesti (USSR), single.

EU long-term permit of stay (IT. permesso di soggiorno CE per soggiorni di lungo periodo), issued for employment (2007-2014, immigration to Italy

in 1999)=permanent residence in Italy and employment in the whole EU (national restrictions apply); Italian identity card and driving license B.

06/2012-has applied for the Italian citizenship.

LANGUAGES

UNDERSTANDING SPEAKING

WRITING

when listening when reading in the dialog free speech

Russian (русский, C2* C2 C2 C2 C2

mother tongue)

Italian (italiano) C1 C1 C1 C1 C1

From 1996

English C1 C1 C1 C1 C1

From 1990

Romanian C1 C1 C1 C1 C1

From 1982

(româna)

French (Français) B2 B2 B2 B2 B2

From 2003

German (Deutsch) A2 A2 A2 A2 A2

From 2003

C2 and C1=Proficient user; B2 and B1=Intermediate level; A2 and A1=Beginners level.

* Language level according to CEF-Common European Framework of Reference: Learning, Teaching, Assessment (CEF) is a system which could

be used to compare language levels for teaching and testing languages in Europe (www.coe.int).

2014

Chamber of Italian English Russian Romanian French German

Commerce and Trade qualification tests of French and German to be added to my existing license of the official translator and

of Savona, I-17100 interpreter, issued in 2002. The other languages are listed above.

2005 Italian English Russian Romanian

appointed as member of the Qualification Board for awarding the license for the official translator

and interpreter of Italian for the above-mentioned languages (I test them and give my

recommendations to the Qualification Board concerning the chartering of the tested candidate).

2002 chartered as Official Translator and Interpreter of Italian for the above-mentioned languages. Sworn

Translator and Interpreter at the Court of Justice of Savona.

from 2002 freelance official translator and interpreter at the Court of Justice of Savona, I-17100 and for

the Italian police authorities for the above-mentioned languages.

sworn professional translations of technical, scientific texts, business documentation and

contracts, documents, issued by the academic organizations and City Hall (certificates of

birth, marriage, death and divorce), legal papers (Court of Justice, notary, attorney-at-law and

police).

DO LAUNCH AND MANAGE THE

Do Tender, Quality Operation and De-

Start-up and Running the

design Contract and Construction and Maintenance commissioning

Commissioning Plant for the

in and Permitting Manufacturing in in in

in Operation in

Project in in

Russian FROM 1992

(русский)

Italian FROM 1996

(italiano)

English FROM 1992

Romanian FROM 1992

(româna)

French FROM 2003

(Français)

My full Russian identity is Vyacheslav Vladimirovich Verdesh (rus. Вячеслав Владимирович Вердеш).

1

CV_UK_061213 1/8

EDUCATION AND CHARTERING

2014 Thermal Fire-fighting

Registry of the A) B) Civil, C)

Performance Engineer

Chartered Engineers of Industrial Structural Automation

and Energy

Savona, I-17100 Engineer and and IT

Saving

Environmental Engineer

Engineering

Engineer

my record will be entered to that Registry as above-listed options A), B) and C) and the chartering for the

Thermal Performance of the buildings and structures and for the Fire-fighting engineering by the Fire

Department of the Italian Ministry of Interior all due to the recognition of the Master in the Mechanical

Engineering and chartering as Mechanical Engineer, awarded by the Universitatea Tehnica a Moldovei, MD-

2004 Chisinau, by the Italian Ministry of Justice in Rome.

2014 my record will be entered to the Registry of the Technical Forensic Experts at the Court of Justice of Savona,

I-17100.

2014 A) Electrical B) TV and C) Power D) Water E) Gas user F) Lifting G) Fire-

Chamber of

power electronic Generation distribution and machinery fighting

Commerce of

distribution installations Plants installations distribution and installations

Savona, I-17100

plants installations installations

will be chartered for the above-listed Plant options due to the Italian laws DM 22/01/2008 n. 37 and DPR

558/1999 due to the experience on similar plants at CERN of Geneva, CH-1211.

will be chartered as Technical Manager for the same above-listed Plant options.

2007 have been chartered for the above-listed Plant option C) due to the Italian laws DM 22/01/2008 n. 37

and DPR 558/1999 due to the experience on similar plants at CERN of Geneva, CH-1211.

have been chartered as Technical Manager for the above-listed Plant option C).

Politecnico di Torino, I- 2005-2006 Master of Science in Specialized in Design and

10129 Torino Mechanical Engineering Manufacturing

(one-year course) as recognition of the Master and Diploma in Mechanical Engineering awarded in

1999 by the Universitatea Tehnica a Moldovei, MD-2004 Chisinau. The recognition process has

continued at the Office of Professional Chartering of the Italian Ministry of Justice in Rome.

Universitatea Tehnica a 1993-1999 Master of Science Chartered ad Specialized in

Moldovei, MD-2004 in Mechanical Mechanical Machinery Design and

Chisinau Engineering Engineer Manufacturing

1999 Chartered for the former-USSR countries.

1993-1999 5-year above-listed Master Course in Mechanical Engineering.

1998-1999 The Department for the Design and Construction of the Agricultural Machinery jointly to the British

(for 3 month) company BIBOX Trading Company Ltd, London. In-company project on the whole life cycle of the

reversible plough, which completion has allowed my above-listed chartering as Mechanical Engineer

in 1999.

2014 Master of Science in To be chartered as To be specialized in

Civil Engineering Civil Engineer Civil Engineering and

upon the Construction

provisions of the

European Directive

2005/36/CE

2014 Master of Science in To be chartered as To be specialized in IT

Automation Automation and Automation

Engineering Engineer upon the Engineering

provisions of the

European Directive

2005/36/CE

Colegiul Politehnic din 1993 College Diploma Chartered for the Chartered for machining

Chisinau, MD-2001 Machinery materials on the lathes

Construction and milling machine

Technology and tools (level IV of VI

Machining the following the Soviet

Materials on the chartering system)

Machine Tools and

Automatic Lines

for the first time in the history of this technical school

1990-1994 4-year College Course as specified above, completed in 1993 or one year before the academic

curricula has scheduled that (to be in 1994).

1993 the College Qualification Board has chartered as specified above one year before the academic

curricula has scheduled (for 1994).

CV_UK_061213 2/8

(01-06)/1993 engineering stage at the manufacturer of the submersible pumps Moldavgidromash of Chisinau, MD-

2001, which has allowed my chartering as specified above. In-company project of the whole life cycle

of the submersible pumps from the Design to the Manufacturing and Testing.

1992 the first 3-month engineering stage on the life cycle of the mechanical components from the design

to the manufacturing at Department of the Machine Tools of the Soviet industrial company

Elektroschetmash of Hincesti, MD-3401. My father was managing that Department.

Have been chartered for the machining materials as specified above as I aced the qualification test.

This level was higher than the one of the Manager of the engineering stage (his level was III).

STAGES, TRAINING AND RESEARCH

Università degli studi 12/2002- Department of Manufacturing Engineering, the course of Industrial Project Management has been

di Genova, I-16126 05/2003 taken. In-company project at the Ecosavona company of Vado Ligure (SV, I-17047). Project

management and engineering on the industrial plant automation.

Universitatea Tehnica 02/2009 have held the mechatronics seminar joining to the experience on the LHC project at CERN in Geneva,

a Moldovei, MD-2004 CH-1211.

Chisinau 05/1997 the Official Bulletin of the International Scientific Conference, held at the University-the following

articles were published in English on the CAD/CAM and IT technologies

CAD development techniques. Real-time applications, scientific supervisor Vasile Ajder, Prof.,

Department of the Design and Manufacturing of the Agricultural Machinery.

Client/Server Database Management Systems. Client/Server Architectures. Real-time applications,

scientific supervisor Victor Besliu, Prof., Department of the IT Technologies.

and in Romanian on the mechanical behaviour of the materials

Aspects on estimating the structural model for describing the behaviour of non-homogeneous

materials, scientific supervisor Vasile Marina, Prof., Department of the Strength of Materials.

02/1994 the Bulletin of the Department of the Descriptive Geometry (scientific supervisor Mihail Popovici, this

Department)-the article in English was published, Algorithms and modelling of the 3D surfaces,

engineering applications.

Open World House, 1994-1996 course of English language and literature, Certification of Attendance issued.

MD-2001 Chisinau

The Office of the 07/1997 the Moldovan President has awarded me the Student of the year 1997 award for academic and

President of the scientific research achievements.

Republic of Moldova

Moldovan Ministry of 1997 (for 2 the management of the local and data transmission network, linked to the Lyon headquarters.

Interior, National month)

Interpol Office

ENIMS of Moscow 1992-1994 information and data exchange concerning the machine tools, cutting tools and machining.

PROFESSIONAL PROFILE, QUALITY AND REGULATORY ISSUES

REGULATIONS International Russian Federation Kazakhstan

APPLIED and former-USSR

countries

REGULATORY ISO, EN, IEC, RTN, GOST

BODIES ATEX, PED, ESA, Glavgosexpertiza,

CONCERNED

OHSAS, ESKD, SPDS, GOST,

Eurocodes, SNiP, VSN, PB, RD,

Directives Directives

From 1992 From 1992 From 1992

REGULATIONS Australia USA United Germany France Italy

APPLIED Kingdom

REGULATORY AS ASTM, ASME, BS DIN, TÜV NF UNI, CEI

BODIES ASHRAE, ANSI,

CONCERNED

API, AISC, ASCE,

ASChE, ASPE,

AWS, AGMA

From 1996 From 1992 From 1996 From 1992 From 1996 From 1996

CONTRACTS EPC EPCM FIDIC EPIC FEED PMC

From 1996 From 1996 From 1996 From 1996 From 1996 From 1996

Turnkey Lump sum Projects

Projects

CV_UK_061213 3/8

PROFESSIONAL PROFILE, SOFTWARE

OPERATING Microsoft Microsoft Microsoft Microsoft

SYSTEMS Windows 7 Windows 8 Windows Server Windows Server

2008 R2 2012

DATABSE Microsoft SQL Oracle

SERVERS Server

MULTIPHYSICS/ Ansys Abaqus Comsol Siemens FEMAP

CAE

CAD/CAM/CAE Autodesk Solidworks Dassault Catia Siemens NX Siemens

Inventor (former Solidedge

Unigraphics)

CAM MasterCAM Topsolid

CFD Ricardo Suite Flow-3D ESI Software

Package

FLUID Flowmaster

NETWORKS

METAL Transvalor ESI PAM-

FORMING Solutions DIEMAKER

CASTING Autodesk ESI ProCAST ESI QuickCAST

Moldflow

MANUFACTURING Dassault Delmia Siemens

Tecnomatix

PROCESS AspenONE

(CHEMICAL)

ENGINEERING

MULTIBODY MSC Adams

DYNAMICS

SYSTEM MSC Simexpert Automation

DESIGN AND Studio

SIMILATION

CIVIL Autodesk REVIT Autodesk Robot Graitec ETABS Dlubal software

ENGINEERING Structural

WELDING ESI Welding

SIMULATION Simulation

VIBRATION ESI VA One

SIMULATION

ERP SAP

PROFESSIONAL PROFILE, PROFESSIONAL SERVICES

Have been working as freelance engineer from 1992 to 2007, when I have launched the own the small

Italian engineering company Generalimpianti, headquarters of Millesimo (SV, I-17017). It was

incorporated to the Company Registrar of the Chamber of Commerce of Savona, I-17100.

EXPERT AND CONSULTING SERVICES

Engineering and Technical Investigations

Engineering Consulting (Civil and Structural)

Engineering Consulting (Electrical, Control and Automation)

Engineering Consulting (Mechanical, Industrial)

Engineering Support (Engineering Response)

Expert Engineering Services

Project Management Consulting Services

RESEARCH AND DEVELOPMENT

Computer Software Simulations

Computer-Aided Engineering (CAE)

Data Acquisition and Processing

Statistical Analysis

WORKS MANAGEMENT

Project Director

Project Manager

Project Control Manager

Tender Manager

Contract Manager

De-commissioning Manager

CV_UK_061213 4/8

Materials Manager

Quality and Permitting Manager

Health Protection and Safety Manager

Project Engineer (Engineering Manager)

Construction Manager

Manufacturing Manager

Commissioning Manager

Operation and Maintenance Manager

PROJECT MANAGEMENT/PROJECT DIRECTOR

Project Director

Project Manager

Contract Management

Customer Relationship Management

Project Team Management

Budget and Resources Planning and Management

Work Breakdown Structure (WBS)

Project Schedule and Control

Project Audit, Review and Reporting

Legal, regulatory and quality issues management

Non-compliance and conflict troubleshooting and mitigation

Design Management, Expertise and Validation

Supply chain and Material Management

De-commissioning and Recycling Management

Construction and Manufacturing Management

Test, Start-up and Commissioning Management

Running the Plant for the Operation

Operation and Maintenance Management

Company Accounting

Invoicing, Taxes and VAT

Plant Management

PERMITTING, LEGAL ISSUES, QUALITY AND METROLOGY

Project (Plant) Quality Plan

Project (Plant) Permitting Plan

Technical Legal Issues

Design Errors and Non-compliances Management and Troubleshooting

Civil Construction Errors and Non-compliances Management and Troubleshooting

Mechanical Manufacturing Errors and Non-compliances Management and Troubleshooting

Erection and Installation Works Errors and Non-compliances Management and Troubleshooting

Commissioning Errors and Non-compliances Management and Troubleshooting

Operation and Maintenance Errors and Non-compliances Management and Troubleshooting

Materials Permitting and Quality

Components (Parts), Equipment, Machinery and Plant Permitting and Quality

Design Documentation Permitting and Quality (documentation, all types)

Design Works Permitting and Quality (all types)

Civil Construction Works Permitting and Quality

Manufacturing Works Permitting and Quality

Welding and Brazing Works Permitting and Quality

Erection and Installation Works Permitting and Quality (all types)

Commissioning Works Permitting and Quality

Running the Plant for the Operation Permitting and Quality

Operation and Maintenance Works Permitting and Quality

De-commissioning Works Permitting and Quality

Permitting and Quality Alignment

Permitting and Quality Audit

Expediting

ISO certification

OHSAS certification

Certification upon other standards

Metrology, applied to Civil Construction

Mechanical Metrology

Surface Metrology

Metrology, applied to Mechanical Manufacturing

Metrology, applied to the Materials

CV_UK_061213 5/8

Metrology of the Machine Tools

Metrology of the Mechanical Components

Materials Testing

Materials Characterization

Non-destructive Testing and Examination

Electrical Metrology

Metrology, applied to the Electronics

Fluid Flow Metrology

Mechanical Stress Metrology and Testing

Vibration and Shock Metrology and Monitoring

Noise Metrology and Monitoring

Thermal Metrology

Thermal Imaging

Combustion and Emissions Metrology and Monitoring

Metrology, applied to Operation and Maintenance

Oil Analysis

Chemical Lab

Other types of metrology

MECHANICAL (INDUSTRIAL) DESIGN

Mechanical Design and Re-design Plan

Mechanical Design and Re-design Folder (Dossier)

Mechanical Design and Re-design Expertise

Mechanical Design and Re-design Validation

Mechanical Design and Re-design Approval

Mechanical Design and Re-design (Basic)

Mechanical Design and Re-design (Detailed)

Mechanical Design and Re-design (As-built)

Mechanical Drafting (CAD 3D)

Mechanical Drafting (CAD, Drawings)

Mechanical Drafting (CAD, Schematics)

Mechanical Design and Re-design (Calculations)

Limits and Fits

Mechanical Design and Re-design (CAE)

Machinery Foundation Design and Re-design

Machinery Foundation Construction

Designing and Re-designing the mechanisms

Machinery Statics

Machinery Kinematics

Machinery Dynamics

Other Mechanical (Industrial) Design and Re-design Issues

MECHANICAL (INDUSTRIAL) COMPONENTS

Metallic Structures

Structural Steel

Piping

Piping Supports and Foundations

Riveted Connections

Welding and Welded Joints

Bolted Connections

Bearings

Mechanical Transmissions

Gears, Gear Transmissions and Motorgears

MECHANICAL (INDUSTRIAL) MANUFACTURING

Mechanical Manufacturing

Mechanical Manufacturing (CAM)

Digital Manufacturing Design and Re-design

Metrology, applied to the Mechanical Manufacturing

Mechanical Erection and Installation Works

MECHANICAL (INDUSTRIAL) MANUFACTURING PLANTS

Mechanical Manufacturing Plant

CNC Machine Tools

Machine Tool Manufacturing Plant

Robot Manufacturing Plant

Flexible Manufacturing Cell (FMC)

CV_UK_061213 6/8

Flexible Transfer Line (FTL)

Flexible Manufacturing System (FMS)

Automotive Manufacturing Plant

Truck Manufacturing Plant

Aircraft Manufacturing Plant

Ship Manufacturing Plant

COMBUSTION

Combustion Engineering

Combustion Engineering of the Internal Combustion Engines

Combustion Engineering of the External Combustion Engines

Combustion Engineering of the Gas Turbines

Combustion Engineering of the Boilers

Combustion Engineering of the Furnaces

MECHANICAL (INDUSTRIAL) COMMISSIONING

Mechanical Commissioning

MECHANICAL MAINTENANCE AND OPERATION

Mechanical Operation and Maintenance

HEAT AND FLUID MACHINERY AND NETWORKS

Internal Combustion Engines (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

External Combustion Engines (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

Turbomachinery (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Pump (Fan) (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Compressor (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Gas Turbine (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Steam Turbine (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Heat Recovery Steam Generator (HRSG) (Design, Manufacturing, Installation, Commissioning and

Testing, Operation and Maintenance)

Heat Exchanger (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Gas-fired Boiler (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Coal-fired Boiler (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Pressure Vessel (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Gas Distribution Network (Design, Manufacturing, Installation, Commissioning and Testing, Operation

and Maintenance)

Gas Treatment Installations

Fluid Power System (Hydraulics) (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

Fluid Power System (Pneumatics) (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

Compressor Station (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Heating, Ventilation, Air-Conditioning and Refrigeration (HVAC&R) Plant (Design, Manufacturing,

Installation, Commissioning and Testing, Operation and Maintenance)

Water Distribution Network (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

Water and Wastewater Treatment Installation (Design, Manufacturing, Installation, Commissioning and

Testing, Operation and Maintenance)

REFRIGERATION AND CRYOGENICS

Chilled Water Plant (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Refrigeration Installation (Design, Manufacturing, Installation, Commissioning and Testing, Operation

and Maintenance)

CV_UK_061213 7/8

Cryogenic Installation (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

HEAT AND POWER GENERATION AND DISTRIBUTION

Heat and Power Generation and Distribution Plant (Design, Manufacturing, Installation, Commissioning

and Testing, Operation and Maintenance)

Boiler Simple-cycle Plant (Design, Manufacturing, Installation, Commissioning and Testing, Operation

and Maintenance)

Combined-cycle Plant (Design, Manufacturing, Installation, Commissioning and Testing, Operation and

Maintenance)

Power saving issues

Thermal Performance of the Buildings and Structures

Renewable Energy

NUCLEAR PLANTS

Nuclear Power Generation Plant (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

Nuclear Plant (Particle Physics) (Design, Manufacturing, Installation, Commissioning and Testing,

Operation and Maintenance)

OIL & GAS

Wells

Gas Plant

Petrochemical Plant (Refinery)

PROCESS (CHEMICAL) ENGINEERING

Process Engineer

Project Process Engineer

Process (Chemical) Design and Re-design Plan

Process (Chemical) Design and Re-design Folder (Dossier)

Process (Chemical) Design Engineering (Calculations)

Process (Chemical) Plant Design Engineering (Calculations)

Process (Chemical) Plant Design (Expertise, Validation and Approval)

Process (Chemical) Plant Design Materials and Components (Selection, Validation, Approval and

Expertise)

Process (Chemical) Design Simulations (CAE, CFD)

Process (Chemical) Design Drafting (Block Diagram, P&ID, PFD, layout drawings)

Process (Chemical) Plant Design (Basic Design)

Process (Chemical) Plant Design (Detailed Design)

Process (Chemical) Plant Design (As-built)

PROCESS (CHEMICAL) PLANTS

Process (Chemical) Plant De-commissioning Management

Process (Chemical) Plant Construction Management

Process (Chemical) Plant Commissioning Management

Running the Process (Chemical) Plant for the Operation

Process (Chemical) Plant Operation and Maintenance Management

HOBBIES AND INTERESTS

Sports (ju-do, European football, volleyball and basketball), books, science and technology, international law, music, hiking and gardening.

Do authorize (1) the processing of the personal data according to the laws on the privacy and personal data protection and (2) to call only those subjects,

specified in the section REFERENCES,

internationally complying to the international and national laws of the country or of the countries, where the processing is done.

in Italy complying to the law Decreto Legislativo 30 giugno 2003 n. 196 (Codice in materia di protezione dei dati personali).

Vyacheslav Verdesh (Veaceslav Verdes)

CV_UK_061213 8/8

VYACHESLAV VERDESH, ENG. MASTER PROJECT SCHEDULE Revision Date: Thu 12/12/13

I-17017 Millesimo (SV)

WBS % Complete PROJECT NAME AND TASKS Company Name Company Adress Industry(ies) concerned Start Finish Company Dpt Company Dpt Address

November

01/11 08/11 15/11

60% CONTINUOUS ENGINEERING PRACTICE Mon Tue 12/12/13

1

02/01/96

60% Fluid Machinery Engineering Consulting Private and State Companies Former USSR countries and Mon 02/01/96 Tue 12/12/13

01

Europe

60% Heat and Power Plant Generation and Distribution Private and State Companies Former USSR countries and Mon 02/01/96 Tue 12/12/13

02

Engineering Consulting Europe

60% Automation and Electrical Engineering Consulting Private and State Companies Former USSR countries and Mon 02/01/96 Tue 12/12/13

03

Europe

60% Project Management Consulting Private and State Companies Former USSR countries and Mon 02/01/96 Tue 12/12/13

04

Europe

60% PROJECT MANAGER Generalimpianti I-17017 Millesimo (SV) Wed 20/07/07 Tue 12/12/13

05

93% ENGINEERING PRACTICE ON THE PROJECTS Tue 01/09/92 Mon 09/12/13

2

100% The life cycle of the mechanical components, The Industrial Company MD-6811 Bardar (Ialoveny, Mechanical Technology and Machinery Tue 01/09/92 Tue 01/09/92 Machine Tools Dpt MD-6811 Bardar (Ialoveny,

A

mechanical units and machinery Moldselyhoztehnika Republic of Moldova) Construction Oil & Gas equipment Republic of Moldova)

Heat and Power Generation

100% MANUFACTURING MECHANICAL ENGINEER Manufacturing Mechanical Components for the Tue 01/09/92 Tue 01/09/92

A.1

Turbomachinery

100% The life cycle of the Oil & Gas Plant and Plants for The British Company BIBOX Trading UK-W1Y 9DD London Process Engineering Oil & Gas Wed Wed 03/11/99 The Branch Office MD-2064 Chisinau, Republic

E 100%

the sugar industry and fruit processing for the sweet Company Ltd 03/11/99 in the Republic of of Moldova

industry Moldova

100% PROJECT ENGINEER. Project Engineering of the whole Turbomachinery (Design, Manufacturing, Wed 03/11/99 Wed 03/11/99

E.1 100%

project Installation, Commissioning and Testing,

Operation and Maintenance)

100% The life cycle of the Waste Processing Plants and The Group of the Italian Companies GEOTEA I-17100 Savona, Italy Waste Processing Mechatronics, Wed Wed 03/11/99 ATS Engineering I-17047 Vado Ligure (SV), Italy

G1 100%

Electrical Power Generation Control and Instrumentation Power 03/11/99 Srl

Generation Gas equipment

100% PROJECT ENGINEER. Project Engineering of the whole Turbomachinery (Design, Manufacturing, Wed 03/11/99 Wed 03/11/99

G1.1 100%

project Installation, Commissioning and Testing,

Operation and Maintenance)

100% The life cycle of the HVAC&R Plant (Heating, Esso Refinery I-96011 Augusta (SR), Italy Oil & Gas Wed Wed 03/11/99

H 100%

Ventilation, Air-Conditioning and Refrigeration) 03/11/99

100% PROJECT ENGINEER. Project Engineering of the whole Turbomachinery (Commissioning and Testing, Wed 03/11/99 Wed 03/11/99

H1.1 100%

project Operation and Maintenance)

100% Vado Ligure Combined Cycle Gas Turbine Tirreno Power Thermal and Power Plant I-17047 Vado Ligure (SV), Heat and Power Generation and Wed Wed 03/11/99 Combined-Cycle I-17047 Vado Ligure (SV), Italy

I 100%

Repowering 800 MW Italy Distribution Gas equipment 03/11/99 Plant

100% PROJECT ENGINEER. Project Engineering of the whole Gas and Steam Turbines (Safety, Wed 03/11/99 Wed 03/11/99

I1.1 100%

project Commissioning and Testing, Operation and

Maintenance)

100% LHC (Large Hadron Collider). The life cycle of the CERN CH-1211 Geneva, Nuclear Plants Wed Wed 03/11/99 Chilled water plant CH-1211 Meyrin, Switzerland

J1 100%

Chilled water plant SUX1, Point 1 CERN Switzerland 03/11/99 SUX1, Point 1

CERN

100% PROJECT ENGINEER On-site. Project Engineering of Compressors, Chillers and Pumps Wed 03/11/99 Wed 03/11/99

J1.1 100%

the whole project (Commissioning and Testing, Operation and

Maintenance)

100% LHC (Large Hadron Collider). The life cycle of the CERN CH-1211 Geneva, Nuclear Plants Wed Wed 03/11/99 HVAC&R ATLAS, CH-1211 Meyrin, Switzerland

J2 100%

HVAC&R ATLAS Plant, Point 1 CERN Switzerland 03/11/99 Point 1 CERN

Critical Split Finish-only Baseline Milestone Manual Summary Inactive Task

Critical Split Task Progress Duration-only Milestone Project Summary Inactive Milestone

Critical Progress Manual Task Baseline Summary Progress External Tasks Inactive Summary

Task Start-only Baseline Split Summary External Milestone Deadline

1 /72 CV_UK_061213

VYACHESLAV VERDESH, ENG. MASTER PROJECT SCHEDULE Revision Date: Thu 12/12/13

I-17017 Millesimo (SV)

WBS % Complete PROJECT NAME AND TASKS Company Name Company Adress Industry(ies) concerned Start Finish Company Dpt Company Dpt Address

November

01/11 08/11 15/11

100% PROJECT ENGINEER On-site. Project Engineering of Air Fans and Air-Handling Units Wed 03/11/99 Wed 03/11/99

J2.1 100%

the whole project (Commissioning and Testing, Operation and

Maintenance)

100% LHC (Large Hadron Collider). The life cycle of the CERN CH-1211 Geneva, Nuclear Plants Wed Wed 03/11/99 Chilled water plant F-01170 Cessy, France

J5 100%

Chilled water plant SUX5, Point 5 CERN Switzerland 03/11/99 SUX5, Point 5

CERN

100% PROJECT ENGINEER On-site. Project Engineering of Compressors and Chillers (Commissioning and Wed 03/11/99 Wed 03/11/99

J1.1 100%

the whole project Testing, Operation and Maintenance)

100% LHC (Large Hadron Collider). The life cycle of the CERN CH-1211 Geneva, Nuclear Plants Wed Wed 03/11/99 HVAC CMS, Point 5 F-01170 Cessy, France

J6 100%

HVAC&R CMS Plant, Point 5 CERN Switzerland 03/11/99 CERN

100% Project Engineer On-site. Project Engineering of the Air Fans and Air-Handling Units Wed 03/11/99 Wed 03/11/99

J6.1 100%

whole project (Commissioning and Testing, Operation and

Maintenance)

100% The life cycle of the Combined-Cycle Plant Heat and Power Generation and Mon Thu 02/05/13 Russian Federation

K1

Distribution 03/12/12

100% PROJECT MANAGER Turbomachinery (Design, Manufacturing, Mon 03/12/12 Thu 02/05/13

K1.1

Commissioning and Testing, Operation and

Maintenance)

100% The life cycle of the Steam Turbine Heat and Power Generation and Mon Thu 02/05/13 Russian Federation

K3

Distribution 03/12/12

100% PROJECT MANAGER Turbomachinery (Design, Manufacturing, Mon 03/12/12 Thu 02/05/13

K3.1

Commissioning and Testing, Operation and

Maintenance)

100% The life cycle of the Gas Turbine Heat and Power Generation and Mon Thu 02/05/13 Russian Federation

K4

Distribution Gas equipment 03/12/12

100% PROJECT MANAGER Turbomachinery (Design, Manufacturing, Mon 03/12/12 Thu 02/05/13

K4.1

Commissioning and Testing, Operation and

Maintenance)

100% The life cycle of the Mechanical Manufacturing Plant, Mechanical Technology Mon Thu 02/05/13 Russian



Contact this candidate