Darrel Algarra
**** **** ***. **** ***** CA ***** 562-***-****
acb1c3@r.postjobfree.com
Objective
To obtain a position and make a positive impact on revenues which will effectively utilize prior experience, training and abilities offering opportunities for professional growth and advancement with the company.
Education
Wyotech, Long Beach, CA
Electrical Technology Diploma
March 2010
Twic Card, RSO, OSCA SAFETY TRAINING, OHSA 10
Work reference
Rod Rodriguez Brinderson 562-***-****
Richard Goldsmith
Brinderson 714-***-****
Jo Bantugan Brinderson 805-***-****
Danny Casseda Timec 310-***-****
Tony Azua EIU 562-***-****
Professional Experience
10/2013 - 12/2013 Long Beach CA DECOR OIL RIG PROUSYS,
Instrument Tech
SHUTDOWN PROJECT
Terminate Panels, Terminate Buckets in MCC, TerminateIndustrial electrical
equipments,pull wire, grounding and bonding, troubleshoot
9/2013 - 10/2013 Long Beach CA
OXY THUMS ISLANDS OIL REFINERYIrwin, Electrician
NEW CONSTRUCTION
Excavations, Digging Trenches, Underground Conduit, Pulling cable, Grounding/bonding
7/2013- 9/2013 Carson CA, Phillips 66 OIL REFINERY, MMR
Joruneyman C Electrician
Run Conduit, Run Cable tray, Grounding/Bonding, Fabricate supports, install fittings, pull cable, install and terminate lights, install and terminate HOA motor switch, terminate motors, Operate Scissor/Man lift, Use power/hand tools to execute daily task, knowledge and understanding of blueprints, lock out tag out
05/2013-7/2013 Tioga ND Hess Gas Plant, TIC, Industrial Pipefitter 3
Bevel pipe, Rig pipe, Fit Pipe, Bolt Flange, Cut Pipe, Demo pipe, Use chain fall, Come along, pullie,Use of hand/power tools, operate scissor lift and man lift
08/12-04/13 HENDERSON NV, OLIN CHEMICAL PLANT, Brinderson,Journeyman C Electrician
Install Cable trays, Install Conduit, Install/terminate lights, terminate transformers, install electrical equipment, terminate motors, grounding, grounding and bonding, pull wire/cables, high pot, ring out terminations, knowledge and understanding on reading blueprints and executing task, use power/hand tools, operate man lift/scissor lift, lock out tag out
02/2012 - 04/2012 CARSON BP OIL REFINERY Industrial Pipefitter 3, Jacobs Engineer Carson, CA
Bolt up Flange, Raise Face Flange, Full Face Flange, Install Gasket,Install Blinds, Install Spacers, Slip-on Flange, Weld Neck Flange,Thread Bolts,Choke, Basket, Straight pull Hitches, Assist Foreman Hydro Test Pipeline, Cut Pipe, New Construction,Demolition, Use Off Hand Tools and Power Tools, Lock out tag out
08/2010 - 02/2012
WILMINGTON CONOCO PHILLIPS REFINERY Industrial Electrician Helper, Timec 16941 Keegan Avenue, Carson, CA 90746
Maintenance, light support, replace ligt fixtures, replace breakers, Repair Industrial Wiring Devices, keeping record of electrical devices going out to the field, General labor clean up and organize documents in Admin Building, inventory, Lock out tag out
10/2007-10/2008 VOPAK, CHEMOIL, SHELL, NUSTAR TERMINAL
Industrial Oil Surveyor LA Bunkers Wilmington CA
Sampled and Gauge Oil Tanks, Sampled and Gauge Oil Barges, Tested oil for viscosity and density
Accomplishments
Successfully completed
Skid unit project for Decor Platform Edith
Electrical project for Conoco Phillips Refinery Unit 151,152
Bp Refinery project for 51 Vac Unit
Olin Chemical Plant Electrical New Construction for Hyper Bleach Unit
completed Phillips 66 Oil Refinery Electrical Project for Crude Unit Subcontracted for Low Voltage Company Net Tech, Low Voltage/New Construction Project forWallmart Supermarket in Stanton CA, Hawaiian Garden CA
Sent from Yahoo! Mail on Android
Sent from Yahoo! Mail on Android