Post Job Free

Resume

Sign in

Technical Skills: Pmc, Consulting, Conceptual Design, Inspection, Cons

Location:
Bucharest, Romania
Posted:
November 12, 2013

Contact this candidate

Resume:

PROFESSIONAL RESUME

PERSONAL DATA

Name: POMPILIU TARAS

Address: Bucharest/Romania

Phone: 004-***-***-** 57

Mobile: 004-****-**-** 67

E-mail: acawbf@r.postjobfree.com

acawbf@r.postjobfree.com

EDUCATION

Polytechnic University - Diploma of Electrical Engineer -five years of full-

time study.

1 Industrial High School, Bucharest - Awarded Diploma of Baccalaureate

profile Electro-Energetic

Atlas Interactive Limited Offshore-Permit to Work-Level 2

Certificate,February 2010

GASCO Permit To Work,National Training Centre Abu Dhabi-L.L.C.-Jan.2009

AGIP KCO Permit to work Training Workshop, Caspian Technical Resources

Craft Training Center-Kazakhstan, Nov.2006

Marketing and Negotiated Techniques, Romania, 2003

Reliability and Maintenance in Quality Assurance System, Romania, 1998

The Instrumentation Training Course, Danfoss, Denmark, 1997

Compensation of reactive energy with automatic capacitor bank, Frako,

Germany, 1996

Evaluation of Industrial Companies, Romania, 1995

Risk Assessment in Industrial Activities, University of Pisa, Italy, 1995

Management in Research and Development Activities, Romania, 1994

Member of New York Academy of Sciences,

Selected as a Potentially Qualified Candidate for Inclusion in the 1998

Edition of International Who's Who

Senior Researcher

PERSONAL SKILLS:

Self-starter, motivated, professional

Good communication skills

Problems-solver

A keen ability to obtaining hard to get information

High moral standards and business ethics

Receptive and responsive to team work

Adapting rapidly to changes in environment, places, people

Supervisory and consulting potential

Good technical knowledge and skills.

TECHNICAL SKILLS:

PMC, Consulting, Conceptual Design, Inspection, Construction, Pre -

Commissioning, Commissioning, Start-up and Operation for HV/LV Electrical

Installations and Power Plant include Gas Power Plant.

Repair, Maintenance and Troubleshooting

Project Coordinator

QA/QC Inspection Activity.

Testing of Electrical Equipment.

Methodology and Procedures for Testing of Electric Equipment including for

Nuclear Power Plant (NPP)

LANGUAGES: English: good level

COMPUTER SCIENCE: MS Word, MS Excel, Internet Explorer

SIGNIFICANT EXPERIENCE

Sept.2011- 2013-TECHNIP Italy

Electrical Consultant-PMC-Project

Project: Arjew Refinery Rehabilitation & Adaptation Project -ARJEW-ALGERIA

Activity:

Responsible for developing and implementing of electrical part project

strategy and provide technical assistance to Client.

Performed technical reviews, checked and approval of design/engineering

documentation.

Focal point of project execution including screening and evaluation of

proposals, monitor progress of work and tracks implementation schedule.

Advise project management for any implementation and construction issues.

Monitor the activities of the EPC contractor; ensure that the approved

designs are followed during construction, monitor progress at site.

Provided technical assistance for electrical protection calibration,

energization and start up

Verified and approved site modifications according to FEED documentation

and technical standards

Recommended the development and implementation of the project procedures to

verify the electrical readiness for energization and to energize the system

Provided technical support to EPC contractors in major technical problems

in construction, commissioning & start up activity.

Inspection of contactors works, give technical solutions and prepares

technical reports

Guided and advising other members of PMT electrical engineering team

July -Nov.2010-CEGELEC FRANCE

Senior Electrical Engineer

Project: Revamping of Electrical System in Arjew Refinery -ARJEW-ALGERIA

Activity:

Final construction,Pre-commissioning and commissioning of electrical

installations:(Electrical

Substations,Switcgboard,MCC,Transformers,Motors,UPS,PMS,IPCS,CP,Ligting

System a.s.o.

Prepared all commissioning documents (procedures, test report etc)

Coordinated and supervised vendor activity.

January 2010-June 2010-TECHNIP FRANCE

Lead Electrical Commissioning Engineer

Project: Offshore Associated Gases Project-DAS ISLAND-UAE

Activity:

Coordinated actvity for final construction, mechanical completion, pre-

commissioning and commissioning of electrical installations:Electrical

Substations,Switcgboard,MCC,Transformers,Motors,UPS,PMS,VSD,IPCS, Cathodic

Protection, a.s.o.)

Verify all commissioning documents (procedures,test report etc)

Coordinated vendor activity.

July 2007- 2009-FLUOR CORPORATION LTD.

Lead Electrical Commissioning Engineer

Project: Habshan Gas Complex Expansion Project- UAE

Activity:

Creates Receives allocated duties and views enquiry documentation from

client together with Scope of Work to understand what is required. Raises

queries where there is lack of clarity, Interfaces with other disciplines

to ensure integration of activities

drawings and document register to ensure all deliverables are accountable,

and completed on time.

Monitor Contractor's and vendors' quality control effort

Coordinates the electrical engineering aspects of the project to ensure the

technical objectives are met within the approved scope, budget and schedule

Provide technical support and advice to project procurement and

construction activities.

Receives "as built" information from the Project Management Team, reviews

content and, if satisfied, passes to drafting for production of drawings.

Support the other PMT engineering disciplines and construction,

commissioning and operations teams

Drawing up the methodology and commissioning & maintenance procedures for

electrical substations and equipments.

Elaboration of safety management of energised substations procedures &

implementation of LOTO System.

Coordinated activity for final construction, mechanical completion,

commissioning & start up of HV/LV electrical installations: Electrical

Substations, Switchgears, MCC, Transformers, LMS(Load Management System),

IPCS(Integrated & Protection Control System), UPS,Variable Speed Drive

System (ABB),Catholic Protection, Motor Managers MM3(S&I),MULTILIN Relays

SR 469,745,750/760,MICOM Relays a.s.o.

April 2007-June 2007- GENERAL ELECTRIC Intl.

Senior Electrical Commissioning & Start-up Engineer

Project: RAB2 Power & Water Plant -Ras Abu Fontas/Qatar

Activity:

Commissioning & start up for LV/HV electrical installations-

Transfomers,Substations,UPS,Switchgears,MCC,Electrial

Cables.Motors,VSDS,CP,a.s.o.

September 2006-March 2007- AGIP KCO

Electrical Superintendent-PMC-Project

Project: Kashagan Development Experimental Program-Eskene West Onshore

Processing Facility/Kazakhstan

Activity:

Controlling schedule and budget for assigned tasks

Follow up the execution of project in accordance with the Discipline Design

Instructions,Project Procedures on Safety and Quality Control.

Design reviews and design review preparation

Provide assistance and support for construction,pre-

commissioning,commissioning and start-up for LV and HV electrical

installations as: Substations, Transformers, Switchgears, Electric Cables,

Motors, MCC,Power Centers, LMS (Load Management System),DMS (Distribution

Management System),IPCD (Integrated Protection and Control Device),Diesel

Generators,UPS,Electrical Super Heater,Earthing System,Cathodic

Protection,Trace Heating,Lighting System,Lightning Protection,

Supervised and controll the EPC CONTRACTOR's activities regarding

engineering,procurement and construction, verify and checking all the

documentation (technical specifications,drawings,procedures)

Organized, participate and coordinated all necesary technical meetings to

implemetnt the performance of the work.

Interfacing with all EPC Contractor departments on technical,contractual

and procedural issues in order to settle in useful time the critical

problems.

Well-known of local standards (PUE,SNiP)

2004- August 2006 - TECHNIP ITALY S.P.a

2 Senior Electrical Supervisor-Team Leader

4 Project: Unleaded Gasoline/Low Sulphur Gas Oil Project - Abu Dhabi Oil

Refining Company UAE.

Activity:

Reviews and monitors project electrical engineering deliverables, vendor

data and design changes.

Developing and implementing the EPC Contractors technical documentation

for pre-commissioning,commissioning and start-up.

Precommissioning, Commissioning and Start-up activity for HV( high

voltage), and LV ( low voltage) electrical installations as: Substations,

Transformers, Switchgears, Electric Cables, Motors, MCC, Power Centers,

VSD(LOHER),UPS(GUTOR),Capacitor Bank(ABB),SCADA System,Electrical Heaters

(CHEMTEC.B.V.),Cathodic Protection, protection relays as: Motor Managers

MM5(S&I),MULTILIN Relay SR 269,469,489,745,750/760 (ABB).

Training his Engineering Team regarding the testing of equipment and

acceptance criteria.

1 2003-2004- GENERAL ELECTRIC - NUOVO PIGNONE

2 Electrical Supervisor

Project: Gas Turbine Generator-Western Libya Gas Project-WAFA DESERT- North

Africa -Libya

Activity:

Supervised teams of electrical specialists for construction of GTG (Gas

Turbine Generator) equipment.

Oversees the installation, maintenance, and repair of electrical equipment

and wiring systems

Locating and repairing defects in electrical systems

Perform a broad range of supervisory responsibilities over others.

1 Project: Kwale Gas Injection Upgrading Project -OBI-OBI, Nigeria

Activity:

Electrical commissioning and start-up activity for Gas Turbine Generators,

Low, Medium and High Pressure Compressors: Generator Control and Protection

Panel, Excitation Panel, MCC, Rectifiers, Inverters, Motors.

2 2002- 2003 -GENERAL ELECTRIC MATERIALS

Senior Electrical Engineer

Activity:

Received allocated duties and views enquiry documentation from client

together with Scope of Work, interfaces with other disciplines.

Undertakes technical evaluation of vendor offers to ensure that technical

details are satisfied..

Asses progress and procedure associated reports and propose plans to

recover slippage and correct inefficiency.

Received "as built" information, checked and reviews content

.

2001 - 2002- TECHINT CIMIMONTUBI -ITALY

3 Electrical Supervisor

Project:

Nigeria Liquefaction Natural Gases Expansion Project, BONNY ISLAND-NIGERIA

Activity:

Supervised the construction of electrical installations: Catholic

Protection, Electrical Substations, Earthing Systems.

Planned, scheduled, assigned and supervised the work of teams engaged in

the installation of electrical systems and equipment.

Developed and maintained safe work practices and enforces strict

conformance to safety regulations..

Provide to Site Manager daily report as concerns the working progress and

proposed actions to implement the performance of the work.

1996 - 2001- TOFAN GROUP, DANUBIANA S.A.

6 Head of Electrical Department-Project Manager

Main Projects:

Rewamping of Electrical Substations-Install H2S Switchgears (ABB-Type)

Implementation of Frequency Conveters for Pumping Systems (SIEMENS-Type)

Compensation of Reactive Power with Automatic Capacitor Bank (FRAKO-

Germany)

Information Management System (FRAKO-Germany)

Activity:

Conceptual Design,Supervised, construction, pre-commissioning tests and

commissioninig,repair and maintenance for wide variety of equipment :

Electric Motors, Generators, Motor Control Centers, Pumping

Stations,Compressor Stations,UPS,Frequency Converters,etc)

Scheduled maintenance inspections for a wide variety of electrical

equipment.

Coordinated and assisted in development and completion of all electrical

QA/QC acceptance forms.

Verified the development and completion of all electrical specific forms

and electrical testing before energizing the systems.

Coordinating of trouble tracking and start up activity before energizing.

1992 -1996- EUROTEST S.A

7 Scientific Manager

Activity:

Management of R&D activity in field of equipment qualification, namely:

assessment of the capability's equipment to operate in specific conditions

(Thermal and Operational Aging, Radiation Vibration, Earthquake and Nuclear

Accident) for Nuclear Power Plant.

Organization and coordination of QA/QC activity.

Coordination of activity to elaborate of new methodologies for

qualification of electrical equipment

1 1985 -1992- ELECTROTECHNICAL RESEARCH INSTITUTE, Bucharest

8 Head of Research and Qualification Department for Equipment of NPP

(Senior Researcher)

Activity:

Research in field of Qualification of Safety Related Equipment for NPP.

Elaborated of new methodologies and procedures for testing of equipment for

Cernavod? NPP according to international standards (IEEE, IEC, ASTM a.s.o.)

before installing and commissioning

Performed of specific tests for Electrical, Electronic and Automation

Equipment as: thermal aging, radiation aging, vibration and seismic testing

and LOCA test (Loss of Coolant Accident).

1977 - 1985- DANUBIANA

1 Head of relays protection department

Activity:

Testing of electric equipment (Electric Motors, Generators, Transformers,

Electric Cables, a.s.o.) as part of maintenance programs.

Pre-commissioning tests for electrical equipment and drawing up the

acceptance forms.



Contact this candidate