CURRICULUM VITAE

(Project Management - Project engineering & co-ordination, Project

Planning, scheduling and Project Control, Project progress measurement and

reporting, Change Management)

Objectives / Qualities & Specialties :

Around 27 years of cross-cultural experience in the areas of :

Project Management, Planning / Scheduling, Site / Construction Management,

Cost & Change Management, Proposals, Estimation & Tendering, Design &

Detail Engineering Reviews, Procurement, Civil / Structural / mechanical /

Piping Works, Resource Management for Oil & Gas, Petrochemical,

Pharmaceutical EPCI projects.

I am always looking for new ventures and projects concerning oil and gas. I

am a professional engineer. Likes honesty, ethics and hard work. I have the

required leadership qualities to form a team, lead a team, motivate a team

and turn them into a high performance driven delivery team. Also I am

target oriented and put my efforts towards achieving set goals and targets.

Like to be a member of team with common target. I am a role player.

It is my constant endeavor to work for realizing my dream in Projects with

a growth oriented Organization of repute in Petrochemical, Oil & Gas

industry. I believe that when dreams start working there cannot be any

obstacle in achieving the set goals because focus shift in creating the

environment for getting the desired results rather than on obstacles.

I have experience of working with oil and gas giants like PDO,

FOSTERWHEELER, TOTAL, Technip, Petrofac, JGC, Chiyoda Corporation, CCIC &

RELIANCE Ind. Ltd. all with different working culture & environment. This

has helped me in achieving maturity in maintaining effective relationship

with person of different nationalities. I strongly believe that it is

through teamwork only big goals can be achieved, which requires effective

communication skills, understanding of ground realties & work in constantly

changing environment.

Specialties:

Project management & control, Project Engineering and planning, expert from

hands on exposure with Planning, Scheduling, reporting, co-ordination,

progress measurement, change management Pre commissioning from the stage

of construction till smooth Run.

Interested In

. career opportunities

. consulting offers

. job inquiries

. expertise requests

. reference requests

. getting back in touch

Name : Tushar Upadhye

Address for communication : 403, Heera Deep, Mental Hospital Road,

Wagle Estate P O, Thane (West),

Maharashtra,

INDIA - 400 604

Contact Tel Nos : + 0091- 22 - 2582 5723 (Resi)

+ 0091 - 981-***-**** (Mobile)

Skype ID : tushar6404

Email Ids : acaqvq@r.postjobfree.com,

acaqvq@r.postjobfree.com

acaqvq@r.postjobfree.com,

acaqvq@r.postjobfree.com

Date of Birth : 4th April 1964

Educational Qualifications : B.E.(Mechanical Engineering)

Bombay University - 1986

Nationality : Indian

Passport Details : Z 1944136 (Indian passport)

Valid upto 15th March 2019

Computer Literacy : Fully conversant with

computers.Know

MS Office, Primavera P3, P3.1, P6.0, P6.2,

MS Project, Flow, HPM,

Autocad, Caesar II, tank (Basic

Knowledge), MS Access

Courses Attended : 1) Health, Safety and Environment (HSE)

Induction by Chiyoda Fosterwheeler (CFW)

2) Risk Management conducted by CFW

3) H2S Training course conducted by Qatar

General Petroleum Corporation (QGPC)

4) Training course on quality Assurance and

Control conducted by Lloyd's

5) HSE Awareness by PDO (Petroleum Development

Oman) & TOTAL

Industries Familiarity : Engineering, Consultancy, Construction,

Oil & Gas, Petrochemicals, Refineries, LNG Gas

Plants, Chemical Process Plants, Power Plants,

Desalination Plants, Steel industries

Strengths : Can execute EPIC/EPC Projects independently. Can work as a

part of a team to achieve targets, Good

interpersonal relationships can plan, monitor,

control project. Worked with Bechtel, Chiyoda,

FosterWheeler, MES, MHI, UHDE,JGC, COC,

Akzo Nobel etc.Fully conversant with Safety and

Quality requirements.Positive attitude towards

work.Target oriented approach.

Job Experience:

a) August 1986 - February 1992 : Worked in Thermax Limited, a

reputed engineering in the field of heat generating equipment & water

treatment plants as Project & Planning Engineer. Experience in the Design,

Engineering, Fabrication,

Erection, Commissioning, Maintaining, Troubleshooting of all types of

Boilers(Smoke Tube/water Tube, Solid/Liquid/Gaseous fuel fired,IBR/NON

IBR),Thermic Fluid Heaters, Hot Water/Hot Air

Generators,Incinerators,Burners and fuel heaters etc.

Experience in the fabrication and erection of Chimney and associated

ductings, water/fuel oil storage and service tanks, tank farms and

interconnected pipings with pipe supports. Experience in the Engineering,

procurement, fabrication and Erection, testing of steam piping, water

piping and fuel piping .Also possess experience in electrical cabling,

control panels and instrumentation related to the steam generating systems.

Experience in the fuel storage and handling systems including tank farms

and associated piping and pumps installations. Experience in the solid fuel

storage and conveying systems including ash and coal. Also carried out

shutdown projects successfully. Experience in erection, tendering, bidding

and estimation of large size projects. Clients handled are HPCL,BPCL, ICI,

Godrej Soaps, IPCL,ONGC, Asian Paints Ltd, Johnson & Johnsons Ltd., Resins

& Plastics Ltd., Excel Industries, Cipla Ltd., etc.

b) March 1992 - December 1994 : Worked in reputed alloy steel and

special grade steel manufacturing metallurgical industry Mukand Limited as

Senior Project & Planning Engineer reporting to Vice President

(Projects).Executed projects in running steel plant of erection of furnace,

bulk alloy feeding system to furnace, dedusting system for furnace, water

cooling system for furnace, pickling plant for wire rod coils, material

handling systems and weigh batching systems. The responsibilities involved

were planning of the projects, co-ordination with consultants and

contractors, floating of tenders, techno-commercial evaluation of bids,

order placement and total execution of project till commissioning. This

involved fabrication and erection of big storage sheds with overhead

bunkers and EOT crane, Weighing Bins and Belt Conveying systems for

ferroalloys and lime. Other shutdown projects executed were ferronickle

feeding system to Convertor and Ultra High Power Furnace (UHPF) consisting

of bulk storage system and electronic batching and conveying systems, and

setting up of new pickling plant fully DCS operated for CS and SS wire rod

coils. Handled and was in charge of full Utilities like Boiler, Water

Treatment Plant, Fuel Storage and Handling Systems, Compressed air system

and piping (CS/SS/PP/PVC/GI).Experience in Design, Detail Engineering,

Erection, Tendering & Bidding.

c) January 1995 - February 1998 : Worked in reputed, prestigious

multinational engineering consultancy company Humphreys & Glasgow

Consultants Limited as Senior Project Engineer. Associated with Chiyoda -

QAFAC prebid engineering project and Nirma Limited - 1200 TPD Soda Ash

Project

With Akzo Nobel, Netherlands as Process Licensor. Job involved complete

project co-ordination and project design engg. With Client, Process

Licensor, Statutory Authorities,

Inspection Agencies, Internal Design Deptts. Vendors and Contractors. Also

involved in detail engineering, design and planning, MTO preparations

of piping, preparation of Enquiry Indents, Technical comparisons of

quotations etc.

d) February 1998 - July 2002 : Worked in Gulf ie Middle East Asia for

following companies

Petroserv Limited, Qatar as Project & Planning Engineer. Executed projects

in fabrication, erection, testing and commissioning of Sulfinol tank as per

API 650 for Qatar General Petroleum Corporation and erection of electric

arc furnace with dedusting system, bulk alloy additive system, cooling

water system for Mannesmann Demag, Germany at Qatar Steel Company (QASCO).

Dodsal Limited as Planning & Contracts Engineer at Dodsal & Co. LLC,

Sultanate of Oman. Was deputed at Oman Liquefied Natural Gas (OLNG) project

at Sur, Oman with plant capacity of 2 x 3.3 MMTPA and with Chiyoda

FosterWheeler (CFW) as main EPC contractor. Job functions involved

engineering, planning and site execution of plant piping and pipe supports

(Big Bore & Small Bore),data acquistion from site for updating planning

program, structures, equipment with contractual periodical billing. Also

involved in the estimation and bidding for new tenders and engineering

activities

Special Technical Services LLC, Oman worked as Planning Engineer

Experience in handling of engineering maintenance contracts of Petroleum

Development Oman (PDO). Experience in Oil exploration & drilling rigs, flow

lines and hook up lines.

MECON, Doha, Qatar worked on two projects including one shutdown at Qatar

Petroleum and QLGC as Senior Planning & Project Engineer.

e) August 2002 - November 2003 : Worked for one of Group

companies of Reliance Industries Limited, India's Largest private sector

company,in their Project Division as Project Manager

f) November 2003 - Aug'2006 : Working with M/S UHDE India LTD, as

Technical Specialist (Project Management & Project Control).Involved in

Execution, Planning, Monitoring of projects in Fertilizer and chemical

process industries.

g) Aug'2006 - Feb'2007 : Worked with C.C.I.C. Qatar, a

major giant construction company in Gulf involved in Oil & Gas Construction

Projects as Senior Planning Engineer. Was seconded to JGC & CTCI for

Planning,Monitoring and Execution of QAPCO General Shut Down job .

Worked with Petrofac on brownfield development project at Harweel Oman with

PDO

h) Mar'2008 - May 2009 : Worked on YLNG (Yemen LNG) Project

as Dy Manager (Planning & progress Measurement, Project Control) through

Technip, France. Job involved planning and Progress Measurement system

setup of subcontractors, validate the same, check/approve the

subcontractos' progress reports, preparation/submission of Monthly, weekly

progress reports to client, attend client/subcontractor's progress

meetings, preparation & updation of Level-4 schedules network on primavera

P3,1,preparation of rebaseline plans, recovery plans, check on resource

mobilization by subcontractors etc

i) Since Jan'2010 till Jan'2012 : Worked as a Project

Management consultant rendering services (Project Planning & Control

including construction planning) on contract basis in TEIL, a Japanese

company on a grassroot refinery under construction.

j) Jan'12 to Apr'2012: Worked as Senior Planning Engineer

with CCC -Tasiast Gold refinery project at Mauritania

Jul2012 - Mar'2013: Worked as Senior Planning Engineer

with CCC at Turkmenistan - South Yoloten Gas field development project.

Job Experience and Responsibility (Office and Construction Sites) :

. Preparation of Project Co-ordination Procedure, Equipment List,

Electrical Consumer List, Process Licensor's Document List & Overall

Project management (Planning, Monitoring and reporting & Control)

. Preparation of Overall Bar Chart, Project Program and Activity

Schedules,15/30 days lookahead schedules of the project for project

planning, monitoring & Control.

. Total Project Co-ordination with Client, Process Licensor, Internal

Design Deptts., Statutory Authorities, Vendors, Contractors,

Inspection Agencies and with Site.

. Review of Plans and Schedules and finding out solutions for problem

areas.

. Supporting to the Project Manager/Construction Manager in the

execution of specific area in accordance with the overall project

schedule.

. Supervision of field engineers assigned to different areas.

. Establishing and Maintaining a Document Control Centre within the

area construction office to assure that all new drawings are available

and void drawings are retrieved & destroyed.

. Interpretation of drawings.

. Co-ordination with Construction Manager to insure an adequate flow of

material and information to meet schedule requirements.

. Execution of assignments as requested by Construction Manager

. Initiation of field material requisitions

. Working with Construction Manager to develop detailed weekly work

plans and 90/180 day lookahead schedules, Update these workplans and

schedules as required

. Review of Contractor's/SubContractor's workplans and schedules

. Co-ordination of activities of the speciality engineers

. Secures and co-ordination of vendor representatives when required

. Complete independent handling of techno-commercial (EPC/EPIC)

projects in Power Plants, Water Treatment Plants including auxiliaries

like fuel/ash storage & handling system, stack etc

. Development of Plot Plan, plant Layout, GA Drawings of System and

Piping, Generation of equipment layout, calculation of Material take

Offs (MTOs),

Supervision of design deptt, generation of isometrics and as built

drawings.

. Engineering of piping & pipe supports

. Preparation of Enquiry Indents (EIs ie tender documents) for

Mechanical Systems, floating of tender documents, techno-commercial

evaluation of bids and preparation of Technical Recommendations (TRs)

. Development of Quality plans for erection of static and rotary

equipment.

. Execution of Underground/Aboveground piping, pipe supports

installation, preparation of test packs and hydrotest of piping

. Erection of Mechanical Equipment

. Providing technical assistance to the Piping Superintendent.

. Determining area priorities for piping installation with Area

Superintendent

. Assisting Piping Superintendents and Area Field engineer in solving

piping problems

. Ensuring of spool fabrication priority with respect to the site

conditions

. Developing labour solving methods of piping installation such as

prefabrication of assemblies, bending or offsite preassemblies

. Piping Design, fabrication, erection. After erection of piping,

preparation of Testpacks & punchlists,and attending to the same for

completion

. Planning of Maintenance Engineering Contract of Oil & gas fields and

Of Flowlines and hookups for Oil & Gas Wells