Post Job Free

Resume

Sign in

Mechanical Project

Location:
Eielson AFB, AK
Salary:
SGD 600 / day
Posted:
October 28, 2013

Contact this candidate

Resume:

[pic]

PERSONEL PARTICULAR

NAME : HAMED JOM

DATE OF BIRTH: 11 AUGUST 1955

NATIONALITY : SINGAPOREAN

I/C - PASSPORT NO : S1103419E

RACE : MALAY

LANGUAGE SPOKEN : ENGLISH / MALAY /THAI

ADDRESS : 470 JURONG WEST ST 41

#02-437, SINGAPORE 640470

TELEPHONE NO: MOBILE : 65- 9674 0755

EMAIL ADRESS: acajka@r.postjobfree.com

HAMED JOM

Experience Summary

Total of more than 30 years of working experience, including 20 years in

supervisory, inspection, and testing including related QA/QC job functions

for diversified projects including oil/gas, refinery, chemical/gas plant,

heavy engineering fabrication, pressure vessel fabrication, plus 4 years as

a Craft Apprentice. Sound knowledge and experience includes shop

fabrication on structural steel, piping fabrication and erection, FAT at

vendor workshop and pre commissioning of piping and equipment system

Multi discipline experience and capabilities included QA/QC function

related works such as welding inspection, piping fabrication and erection,

NDE review, pressure vessel fabrication, tank, structural steel fabrication

and erection, offshore engineering, jackets and top side, offshore

installation and pipeline, mechanical equipment setting and installation

including shop and vendor surveillance, witness pump FAT, Crane

accumulators, receiver, gantry crane fabrication, and other marine system,

blasting/painting, expediting and project progress report. Monitor and

witness pressure vessel and heat exchangers fabrication and testing,

including installation of internal trays, such as bubble cap trays, valve

trays, packing etc. Experience in setting and inspection of Drilling

Equipments and sub sea equipments.

Experience also includes the preparation and/review/approval of QA/QC plan

and procedure, preparing of hand over documents, preparing piping/system

hydrostatic packages including crosscheck P&ID and ISO, checking piping

cutting plan and subsequently follow up QA Auditing/surveillance to verify

implementations, ensure Flange Management system were in force and details

documented and including offshore pipe line installation, underground pipe

line installation and pipe coating, concrete weight or compressed system,

rock jacketing, polyethylene wrapped and Asphalt enamel Pipe Line Coating

pigging and testing.

Overseer, source and planning, scheduling, handling engineering drawing for

Project Management in Refinery, Chemical Plants, Power Plants &

Shipbuilding and Heavy Engineering Fabrication projects, offshore

engineering and installation, guidance to certification, and completion

documents inspection preparation

Responsible for ensuring the co-ordination of activities and a fluent flow

of documents in relation with the project procedures.

Professional qualification/certification including CSWIP 3.1- Welding

Inspector Certification, and training in welding, piping, Industrial

Engineering and Power Plant and Project Management.

Educational and Professional Qualification

General Certificate of Education

CSWIP 3.1 - Certified Welding Inspector

Welding Metallurgy Training - Industrial Training Board

Industrial Engineering Training - Singapore Polytechnic

Welding - Industrial Training Board

ASNT II - DPI/MPI - in house

Gas Tester Certificate - Sarawak Shell

Seminar - theory and Practical Training in Laser Alignment - Durco Pump

Certificate of Proficiency - QA/QC Engineer - FWEL

Computer Training - MS Office/Words/Excel

Professional Affiliations

Members of The Welding Institute of Canada

Associate Member of The Welding Institute

Project Management Institute - Member

Employment History

Nov 2012 - Present

Inspection personnel -Mechanical & Piping / PetroVietnam - PTSC / Lam Son

FPSO

Singapore

Responsible to overseer and inspection of Marine/Process Piping system,

piping survey during demolition, routing of new line, testing, materials

and fabrication. Monitoring testing and Hydrotest pack review and approval,

tie in points controls and supervising piping fabrication and erection

works by contractors. Monitor NDE requirement on the system and attended to

Technical Query on piping and assisting contractor in solving technical

problem.

As contracted, providing support to offshore operation in mechanical piping

system during pre-commissioning, hand over dossier review, mechanical &

chemical cleaning of piping system, prior to start up.

Sept 2010 - Oct 2012

Snr Mechanical Fabrication / Inspection Supervisor - SLC Gorgon Project,

Saipem Indonesia, Bandar Lampung

Responsible to ensure smooth progress during fabrication of fabricated

beams and platform for Gorgon Australia LNG Marine Terminal, in sub

contractor yard, PT Hanjung in Bandar Lampung, Indonesia, with total steel

works about 35 thousand metric tons

Supporting Project Planning Dept, in monitoring fabrication work progress,

tonnage of the fabricated beams and other platform components, such as

piping and mechanical, etc, including completion target of fabrication and

assembly of the platform and piping and tubular works. Provide advises on

quality related matters, on fabrication quality, piping fabrication and

other related works as to achieve company goal and expectation on safety,

quality and schedule.

Ensure contractor updated all documents and checking final mechanical

completion dossier prior to load out, and ensure Saipem HSQE were

implemented and followed by the contractors.

Feb 2010 - June 2010

Completion Inspector/Supervisor - Mechanical/Tubing/Piping Brunel

Energy / Noble Drilling Corporation

Seconded to Noble Drilling Corporation to inspect and supervise completion

works on the instruments, tubing and piping. Lead a group of contractor

inspector in inspection and monitoring outstanding works data base

compilation prior to commissioning. Ensure instruments were tested and

calibrated with completed tubing works, recording of valves stroking, and

to ensure piping works were completed, tested and documented.

Sept 2009 - Jan 2010 Brunel Energy - SubSea 7 Pte Ltd

Singapore

Vendor Surveillance Inspector/ Coordinator - Seconded to Subsea 7, and

fully responsible on the projects taken by Subsea 7, such as Riser Hold

Back Anchor for Murphy Oil, and T pipe skid for Santos, Australia, Stage II

Development Project. Responsible to vendors quality programmed implemented,

structural steel and pipe spools fabrication, welding, Load Testing,

painting, verification of materials, shop testing, documentation procedure

review, guidance of certification, and vendor quality surveillance.

June 2008 - July 2009 Brunel Energy -Larson Oil Gas / PetroRig

I/II/III Project

JSPL Singapore

Snr Mechanical Inspector - Fully responsible for mechanical equipments

installation and testing of pumps, exchangers, pressure vessel and

components, hydraulic and high pressure air system including drilling

equipments, including level and orientation check of steel structural, such

as pump and main engine foundation, deck crane column and ensure welding of

the crane adapter were done as per approved procedure, witness mechanical

testing on pumps, vendor scope hydraulic and piping system testing,

receiving inspection, monitoring FAT ( Factory Acceptance Test ) and punch

list, also compilation and preparations of MC documents, prior to equipment

system commissioning and start up during construction of 6th Generation

Semi Sub PetroRig 1, PetroRig II, PetroRig III and Larson Rig 1.

Playing active role on implementations of approved project HSE procedure,

and to ensure company target of zero injuries is achieved.

Nov 2007 - April 2008 Third Transmission Pipe

line Project - PRP Ofshore Platform System

PTT Thailand / Bechtel International - Offshore

Thailand

Mechanical / Piping/ Construction Engineer - Seconded to Bechtel

International to provided supervision during completion stage of the PTT

PRP Platform, including supervision during gas receiving duration unto the

system up to 1100 psi. Primary duties are to supervise and co ordinate

completion activities and commissioning of mechanical equipments and piping

system, as to received 1st gas transmission. Playing active role with CSR

to ensure gas receiving and mechanical commissioning works were done with

highest safety standard and ensure contractors followed safety procedure

.Documents review and certification for commissioning, testing and

preparation of gas receiving system of the platform. Vessels closure audit

and re verified internal components to ensure intact and as per

specification prior to commissioning and start up, coordinating deck crane

testing with classification authority.

May 2007 -Oct 2007 Akpo FPSO Project - Total Upstream Nigeria

Limited

Mokpo / Ulsan - S Korea

Construction Supt/ Site Representative - Seconded to Technip France, and

stationed in Mokpo, S Korea, to fully supervise fabrication/erection &

transportation of HP/LP & KO Drums and Pumps Skid modules at sub-contractor

site, with total steel work 15 thousands metric tons, including its

facilities, piping, mechanical, pumps, installation, E&I, painting, testing

and HSE, to provide support to engineering group and to ensure skid and

facilities were fabricated as per company specification and requirements,

tasks were to deliver modules in time, with quality and works done safely.

Provide support to planning and scheduler on sub-contractor works progress

as well as updating and monitoring updating works measurement with MS

Project. Coordinating in between trades supt, and day to day and technical

and shop problem solving on engineering fabrication issues.

March 2006 - May 2007 Prosafe Production Pte Ltd - FPSO POLVO

Devon BMC8

BRASIL

Piping Inspector - Seconded to Prosafe to oversee/supervise conversion work

of FPSO Polvo. Primary duties are to carry surveillance and inspection

during demolition and renewal of marine piping system including all the

components, with total steel works 26 thousand metric ton, and also new

process piping with modular system, system testing, line inspection,

materials verification, review and approval of hydratest dossier, and

compilation of report and certification, checking dossier prior to final

documentation,for commissioning. Monitor construction and Welding related

activities, follow up / monitor detailed construction activities including

interpretation of engineering & material / construction specifications to

ensure alignment of project goals and strategy, attends to and resolves

Contractor queries and provides technical guidance and expertise to ensure

project requirements are clearly understood and met.

May 2005 -March 2006 Third Transmission Pipeline Project- Offshore

Platform System (PTT Thailand/Bechtel)

Piping/Mechanical Inspector - Seconded to PTT/Bechtel International Inc, to

supervise, monitor works during fabrication of TTP PRP 20 thousand metric

ton Platform. Primary responsibilities to ensure works done by the

contractors were as per project specification and requirement. Monitor and

carry out quality surveillance during fabrication of the platform

structural and all the facilities including the LQ, monitor piping

fabrication works and erection, equipments receiving inspection and

installation, checking on supports and service platform, to ensure they

were fabricated and erected as per drawing requirement. Responsible in

piping system line inspection and Testing, dossier review and approval,

hydro testing, flushing, chemical cleaning and pre commissioning activities

function to completion, final documentation and certification.

Responsible for subsea pipe line coating, witness holiday test, thickness

of Asphalt and damage repair.

June 2004 - March 2005 Brunel SEA - BP Exploration - Shah Deniz TG 500 Gas

Export Project

Piping/Mechanical Inspector - Seconded to BP Exploration Shah Deniz Ltd,

with 25 thousand metric tons steel works, to monitor and witness all aspect

of piping/structural fabrication works including testing, flushing hydro

jetting, tank survey, during construction of Shah Deniz Gas Export Platform

for BP Exploration. Primary responsibility is to supervise, surveillance

and inspection during fabrication of heavy wall Duplex/Super Duplex,

stainless and CuNi piping to ensure works carry out as per specification

and requirements. Carry out line inspection and witness testing, mechanical

testing on maintenance lifting gears and accessories, keep track on Site

Instruction to ensure works completed as required, check/liaise with

engineers and contractor and to ensure no SI outstanding for system

commissioning, including preparing/reviewing technical documents for

project certification and final acceptance.

June 2003 - May 2004 Brunel SEA - Conoco Phillips - BERLANAK FPSO

Piping Engineer / Hydro Test Pack Coordinator - Was seconded to Pt

McDermott Indonesia. Primary responsibility is to supervise a team of line

checkers including managing of hydro test pack dossier. Review all punch

list issued by line checkers, determine and conformed A/B items, cross

check test limits and test loop from P&ID and ISO, ensure updated

document/drawing and preparing for release notes and NDE clearance prior to

testing the pipe line/system, and to ensure Flange Management System were

follows and documented in details in terms of flange sizes and ratings,

bolts sizes and bolts class, flange/mating flange surface were checked

andgasket install as per pipe class and bolts were torque and recorded.,

Follow up reinstatement works after testing, coordinating with all parties

in preparing for final documents prior to final/total Mechanical completion

dossier to be submitted to client fore approval. Keep track on all test

pack movement and ensures timely tested and completed as planned. Assigned

to Task Force team in supporting project management team for timely system

hand over to client.

March 2003 - June 2003 Brunel SEA - KBR P43 - BARRACUDA

FPSO

Mechanical/Piping Inspector - Primary responsibilities is to ensure piping

fabrication/erection on marine and process-piping system is conformed as

per design & specification. Carry out line inspection, and witness

hydrostatic testing, site inspection and verify &ID, pipe support, and

review Hydro test pack and related document prior to final acceptance,

during conversion works on the FPSO P43, Barracuda at Jurong Shipyard,

Singapore. It is including of coordination works and supervision of a group

of line checker/inspector prior to system testing and commissioning and to

ensure timely system handover.

November 2002 - March2003 Brunel SEA - Vanguard SPC -

Wollybutt Project

Mechanical Piping Inspection Engineer - Primary responsibilities is to

ensure piping fabrication/erection on marine and process piping system is

conformed as per design. Carry out line inspection, witness hydrostatic on

piping, site verification as per P&ID, pipe supports, and reviewing of

document for final acceptance, during conversion works on the FPSO Four

Vanguard at Keppel Shipyard Benoi, Singapore

April 2002 - October 2002 - Japan Vietnam Petroleum Company - JVPC RANG

DONG Full field Development Project

General Inspector/Supervisor - Primary responsibilities is to

oversee/supervise fabrication of piping for the N1 2nd phase expansion

during onshore/offshore piping/structural fabrication and offshore

installation, it does include all the piping facilities, flow lines, gas

lift lines, raiser and installation of new separator on the platform,

including to supervise fabrication of the E1 Well Head Platform in Vung Tau

PTSC yard, and it does include of piping/steel fabrication,

blasting/painting, NDE coordination including offshore installation of the

N1 deck expansion and upgrading of piping system on the platform, and pipe

laying, riser installation, pipe coating and PLEM fabrication.

Feb 2001 - March 2001 - Singapore Chemical Complex/ExxonMobil - Poly

Olefin Plant

Contract Inspector- Boiler

Seconded to SCC, to carry out joint inspection with Ministry of Manpower -

Industrial Division inspector in carrying out physical survey on the boiler

B, external and internal condition. Monitor NDE on all the welded

components to ensure no indication of visual defect on all welded seams.

May 2000 - November 2000 - JVPC - Japan Vietnam Petroleum Company

Installation Engineer - Primary responsibility is to overseer and supervise

sub-assembly/fabrication, welding, NDE, of offshore steel structure and

process piping/flow line during fabrication and erection, material

verification, line inspection as per P&ID, cross check ISO/P&ID, and

installation of the Rang Dong N1 4 Slot Expansion in Vietnam, including of

reviewing of the hydro test pack and line inspection of flow line tie-in

points, witness hydro testing of the piping line/system, blasting/painting

of splash zone and insulation of piping system, material take off,

reviewing MDR and to overseer day to day installation activities during

offshore installation.

Feb 99 - May 2000 - Bechtel International

Construction Engineer/ Mechanical - Be responsible on all aspect of

piping and welding works during construction of Exxon's Singapore Chemical

Complex in Singapore. Duties including of piping fabrication and erection,

welding inspection and NDE review, welder qualification, fabrication of

stainless steel silos, reviewing of ISO and P&ID, mechanical installation,

underground piping including all aspects of project quality function

including overseer construction of 2 unit of spherical tank and 1 unit of

cylindrical tank as per ASME DIV 1 & 2 requirement. Preparing of hydro test

pack and plan and preparing of work release note to painting and insulation

on pipe line and vessel.

Dec 98 - Feb 99 - Technic Offshore Engineering Pte Ltd

QA/Qc Inspector - Responsible on Quality works function during fabrication

of pressure vessels, Air Receiver and piping fabrication, duties including

of documenting and monitor all QA/QC work on project assigned as per

quality system requirements, perform project drawing review for the

improvement possibilities in design or welding parameter, selecting of

appropriate WPS for projects, receiving and inspection of incoming

materials as per quality system requirements, in process inspection and

verification of all assigned work as per quality system requirements, co-

ordinate with NDE contractors, coordinate with fabricator and approval

authority, witness and records PQR, WPS, WPQ as per project requirements.

Aug 98 - Dec 98 - Free Lance Inspector

Doing inspection and cost estimation for maintenance works for engineering

firm, and doing cost estimation for the company to do bidding on

maintenance works for the chemical plant in Bontang Indonesia. Preparing

MTO, materials and labor cost including technical data for bidding.

July 98 - Aug 98 - Cost Engineers SEA

Piping/Mechanical Coordinator -To provides cost estimation for piping works

on SUT 11 plant, which is still under planning. Responsibilities are to do

estimation on materials and labor cost, and preparing MTO and data sheet

for material pricing.

Jan 98 - May 98 - Brunel Energy International

Mech. Inspector - Responsible to ensure fabrication/erection quality works

of jackets and N1 Wellhead Platform for Japan Vietnam Petroleum Company,

Duties include piping / structural inspection and supervision, line

inspection, review hydrostatic test packages, review NDE result, mechanical

installation, vessel closure audit, witness mechanical testing and

hydrostasting, painting, insulation and system flushing and

precommissioning and review documents prior to approval.

Oct 97 - Dec 97 - PetroBras SA

Piping/Mechanical Inspector - Typical responsibilities including pipe spool

fabrication and erection, review system hydrostastic documents and line

inspection and witness testing, NDE coordination, system flushing, review

inspection documents prior to system acceptance during major conversion job

of PetroBras P27, from semi sub drilling rig to storage floating unit.

Jan 97 - July 97 - Scheering Plought Pham. Plant

QA/QC Engineer - Responsible to ensure proper and smooth system hand over

and to ensure that all relevant technical documents were provided in the

test packages, before approval of system testing, and to ensure P&ID and

ISO were updated as per as built including piping modification design and

approval. May

95 - Dec 96 - Manessmann Demag JV / Singapore Aromatic Plant

QA/QC Coordinator - Typical responsibilities including pipe spool

fabrication and erection, preparing MTO, mechanical equipment installation,

NDE coordination and responsible for preparing piping hydro-static test

packages for system testing and commissioning, design additional piping

works, update P&ID and ISO, and taking up as an Asst. QA Manager and

responsible in coordinating with client and day to day quality problem

including supervision a group of site inspector during plant construction.

Mar 95 - Apr 96 - TEK Singapore Pte Ltd / Du Pont Delrin

Upgrading/Expansion

Construction Supervisor - Typical responsibilities including plant services

and maintenance, during plant expansion and modification works, site office

maintenance, engineering services, site safety, preparing documents for

bidding and quotation, vendor audit and evaluation, quotation review,

setting up filing system and computerize technical data records, also doing

multi discipline site QA/QC activities related to works requirements.

May 89 - Mar 95 - Ebasco Quality Services

Snr Quality Rep - Typical assignment including vendor surveillance and

inspection of various fabricated equipment such as pressure vessel, steel

structure, piping, welding inspection, painting, insulation, mechanical

installation and testing. Doing multi discipline site QA/QC activities

related to construction projects including welding, mechanical, piping,

mechanical testing and documentation.

Typical Major Assignment includes: -

Badger Engineer Incorporate - US

Representing BEI, during fabrication of pressure vessels, columns, during

construction of Mobil's Aromatic Plant in Jurong, Singapore, and also

responsible for fabrication of vessels and columns for Thai Refinery

constructor during construction of their plant in Rayong, Thailand.

Primary responsibilities are to liaise with contractor on quality

assurances function, schedule, fabrication, NDE coordination, painting,

shipping including of final documentation reviews and preparation of MDR.

These include carrying out vendor surveillance on company purchase items

such as pipes, valves, plated, bolts/nut, etc, and to ensure commodities

conformed to company requirements and certification.

Mitsubishi Corporation /Ministry of Environment - Singapore

Seconded to MOE as site QA and responsible for auditing QA/ QC function for

Mitsubishi Corporation during vendor procurement and site construction at

Senoko Refusal Incinerator Plant, Singapore. Multi discipline

responsibilities including reviewing of NDE result, welding inspection on

boiler tubes, fabrication and repair procedure, vendor surveillance,

product audit and inspection during erection of 6 units of Water Wall

Boiler, including mechanical equipment installation and inspection on

various system to ensure compliance to fabrication specification. Witness

functioning test of major equipment and record data review before

submission/approval.

Offshore Pipeline/OPI - Singapore

General Inspector - Seconded to OPI to conduct WQT and PQT for Sarawak

Shell BHD, MLNG II pipeline installation project. Utilizing the SMAW and

CRC automatic welding technique. Piping and welding inspection and NDE

review including fabrication of riser pipe and clamps during fabrication of

the expansion of the loop lines.

Du Pont Adi Pure Project

Lead Mechanical QA/QC - Representing the end user during construction and

installation of mechanical equipment and pressure vessels associate with

construction of this 500 millionth dollars plus project. Responsibilities

including but no t limited to receiving inspection on equipment,

check/review heavy equipment rigging plan and procedures, monitor equipment

storage and organize Preventive Maintenance Team, check equipment location,

foundation, establish orientation and elevation, monitor equipment

installation works, check equipment levelness, plumpness, orientation and

elevation after installation, check grouting preparation of equipment base,

check equipment internal components and monitor installation of trays,

demister, packing etc insulation and painting works organize vessel closure

audit for equipment acceptance and pre commissioning, compilation/review of

all installation/equipment records for submission and dimensionally check,

torque and bolts inspection on structural steel.

June 88 - Dec 88 - Vietco Services

Offshore Inspector - Seconded to Sarawak Shell to carry out general

inspection during installation of Bokor and Temana jackets and platform

facilities, including laying of 4"and 6" dia. inch of pipeline offshore

Miri and Bintulu Sarawak. Duties include material verification, piping and

structural inspection, welding inspection, NDE, check/witness jacket

leveling before piling, distortion check, monitor [piling and progress

during offshore installation works. Witness NDE inspection, result

review/filing, monitor piping piging and flushing and line hydrostatic

testing.

Jan 87 - Feb 88 - Kejuturaan Kota Aman

QC Inspector - Welding inspection function during fabrication and

construction of Bokor C jacket and facilities as well as piping fabrication

at Pasir Gudang yard, Malaysia.

1985-1987 - MSE

Welding Supervisor - Welding inspection/QC function during fabrication and

construction of coastal tankers/vessels for Petronas, Malaysia.

Responsibilities are including supervision a group of skill welder/fitter,

production organization and daily activities of subordinates including

welder training.

1981-1983 Dillinger Stahbalau -Gmbh

Qc Inspector - Carry out welding inspection function during construction of

Sabah Gas and Methanol Plant. Duties include all aspect of welding

inspection function, NDE coordination and compilation of all test, and

preparing report for client submission.

1977 - 1979 - Hitachi Engineering

QC Inspector - Carry out welding works on boiler tubes and piping, and

taking up QC works function during plant shut down.

1973 - 1977 - JSL

Apprenticeship - Craft Apprenticeship in Marine Engineering and was trained

by IHI Japan, in all aspect of offshore/marine Engineering works including

fabrication, welding, NDE, mechanical installation, testing and

commissioning and Quality control.