Mike Anderson
Brooklyn, New York 11213
Phone: 917-***-****
OBJECTIVE: To secure a position within an established company where my skills and over thirty five years experience will be
utilized, and opportunity for future advancement as a construction site safety manager can be fulfilled
EDUCATION: Ashworth College, New York, NY
High School Diploma
60 credits completed of Academic College
PROFESSIONAL EXPERIENCE:
Turner Construction Company, New York, NY 1999 - Present
Labor Foreman / Construction Site Safety Manager
Coordinate with Project Manager and Superintendent to generate work schedules for 20+ laborers
Monitor daily work hours on all projects and assign responsibilities to, and supervise laborers from 4 to 25+ laborers at a time
Schedule supplies and equipment to meet schedule and ensure safety is observed with all contractors on site
Implement pre-safety plans and meetings for major construction tasks daily between all trades
Estimates manpower requirements and materials for variou s work assignments
Maintains inventory of materials and equipment
Prepares progress and other reports concerning the type of materials used, and cost of completed work assignments
Perform general construction labor tasks including jobsite clean-up and moving of materials
Operate air powered and motorized equipment including jack hammers, chipping hammers, concrete saws, and concrete vibr ators
Manage and supervise from 4 to 25+ laborers at a time
Allotting laborers to their respective duties and making sure they have the appropriate training and tools to execute their job
Promote comprehensive safety programs, reducing insurance costs and executing accident and incident reports
Making sure regulatory needs and safety measures are maintained through all phases of projects
Extensive knowledge in interacting with architects, owners, building inspectors, utility representatives, and subcontrac tors
PROJECTS:
April 2013 – Present
Rainbow Room, New York, NY
Renovation of 25,000 sq-ft of the existing Rainbow Room at 30 Rockefeller Plaza. Improvements include a full kitchen, high end
finishes, a revolving dance floor, and a new terrace on the 65th floor
2008 – April 2013
Rockefeller University (Lark, Vault, Smith, CRC, Flexner, Welch), New York, NY
The construction of multiple projects including Bioscience Center, newly renovated laboratory structures conducting
neuroscience and behavior research, Collaborative Research Center, a new 60,000 sq-ft eight story, glass enclosed structure and
renovations of two Neoclassical style laboratory buildings, Smith and Flexner, with a combined total of 200,000 sq-ft, Welch Hall
Library, a five-story historical library, combining all projects at an estimate of over $1.2 billion dollars
Montefiore Medical Center, Bronx, NY 2003-2008
The construction of multiple buildings including Jerome L. Dawn Greene Medical Arts P avillion, a 150,000 sq-ft, eight-story
facility including medical office space and a new 400 space garage, the Children’s Hospital, a 139,000 s q-ft pediatric center
consisting of an 18-bed PICU, clinic space, and day hospital and major renovations and expansion to the Moses Campus
including infrastructure, campus infill, cogeneration projects, and emergency room expansion. Estimated at over $500 million
dollars
Bellevue Hospital Center, New York, NY October 2002-2003
The construction of multiple projects, new main entrance to hospital campus, new 210,000 sq -ft Ambulatory Care Facility,
renovation of 80,000 sq-ft inpatient facility, and a 45,000 sq-ft Critical Care Unit. Estimated at over $115 million dollars
Interfaith Medical Center, Brooklyn, NY 1999-2002
New construction and modernization of entire hospital (6 floors). Estimated at over $150 million dollar, consisted of a new
emergency room, a new addition of an 85,600 sq-ft facility and the renovation/modernization of an existing structure made up of
154,000 sq-ft. Project included an extensive fire alarm system, nurse call system, medical gas alarm system, pre -action system,
UPS system, 1250kW emergency generator, low voltage system, specialty radiology systems. lighting and power systems
CERTIFICATES:
NYC Buildings Construction Site Safety Manager
Construction Site Fire Safety Manager
OSHA 10 & 30
Scaffold User & 32 hour Scaffolds Builders
Fire Guard for Torch Operations & Construction Site