Post Job Free
Sign in

Project Document Control

Location:
Batam, Riau Islands, Indonesia
Salary:
3000000
Posted:
September 13, 2018

Contact this candidate

Resume:

Name : Simon Patar Tampubolon.SE

Sex : Male

Place/Date of Birth : Panipahan / July03,1975

Marital Status : Single

Current Address : Bengkong Otorita Jln. Jambi no 17

Batam - Kepri 29432

Education : University bachelor degree

Experinces : Document Control / Data entry Clerk

Contact Number : +628**********

Passport No : AH533125

E – Mail : ac61ch@r.postjobfree.com

1994 – 2000 : University Catholic St. Thomas-Medan

Accounting (S1)

1992 – 1994 : Economic Senior High School - accounting

SMEA Negeri – Tanjungpinang-Riau

1989 – 1991 : Elementary School

SMP Negeri 4 – Tanjungpinang- Riau

1983 – 1988 : Primary School

SD Katolik – Tanjungpinang-Riau

2010 : Attended In house training ASNT UT Level II ( Constant Configuration ) conducted by PT. Lekom Maras. Level III by Saharudin Kambari.

2008 : Attended course Ultrasonic Testing Level II by IINDT-Batam. Level III by Sugeng Pramono

1991 : English course

Company : PT.GREATWAYS ENGINEERING NDT Service Division,

Periods : March 12,2012 – June 05, 2017

Position : QA / QC & Document Control.

Sttandby at : PT . BETA ENGINEERING INDONESIA fabrication – KABIL

PT. ROTARY ENGINEERING INDONESIA fabrication - Tanjung uncang.

Job Description : - Provide applicable international standards needed for NDT operation

- Review of customer’s specification

- Provide appropriate NDT Procedure specification

- Provide appropriate NDT equipment and consumable

- Input Data from QC Inspector & prepared complete report for submitted.

- Responsible for all Radiography Film and ensure client has review and signed

- Store films Radiography and ensure the film is complete and keep in boxes.

- Check outstanding report at technician and compare with data in computer.

Ensure the report is not delay for submitted if the report has complete

Company : PT. LEKOM MARAS NDT Service Division, Batam Island Periods : Dec 24, 2005 – 13 June 2011 ( Finish contract )

Position : NDT Document Control and Assistant UT Technician

Standby at : PT.J.Ray.McDermott Indonesia Fabrication – batu ampar

Job Description :

-Responsible for checking and Monitoring of all Technician activities compare to document signed.

-Responsible for all Radiography Film and ensure client has review and signed at report. And store the film project until finish project and make sure the film is safe.

-Responsible for checking and monitoring of all NDT Equipment certificate

-Monthly Checking All Document for Routine Audit Project

-Monitoring PCM (Project Certification Module) & Minimize all Outstanding NDT for Production

-Monitoring system to ensure documents have been distributed as required

-Producing reports daily, weekly and monthly as required

-Ensuring copies of all documents uploaded in system are stored in files for backup purpose.

-Monitoring overdue release of documents in an effort to minimize outstanding CIR.

-Updating information on CIR on a monthly basis to assist PMT & Qc Inspector in issuing reports.

-Controlling all consumable IN & OUT for MPI / UT / RT & Review batch Certificate.

-Responsible to make man hours for Safety Record

-Prepare all Report and Time Sheet & Man hours for INHOUSE Project, such as: (WQT + PQR + WPS + Production test and etc, )

-Checking NDT Personnel Qualification Register updated

-Input Data from QC Inspector & prepared Report and submitted the complete report.

Assignment Project :

-

Seconded to PT.McDermott Indonesia Batam fabrication yard to carried out UT Assist for

various project as follows;

-

CHEVRON AUSTRALIAN PTY LTD-GORGON Project Barrow Island LNG Plant

(R2754E), Pipe Rack Module & PQR, WPS

-

MAERSK (R2924-SC01) Peregrino FPSO Topside Facilities Structure

-

MAERSK Peregrino FPSO Topside Facilities Piping

-

CHEVRON Platong Gas II Project (R2847)Deck Prcess Platform Topside Structure

and Jacket Construction & Bridge

-

Conoco Philips – North Belut Jacket (R2892-SC02) Development project CPP

jacket Construction

-

Conoco Philips - North Belut Deck (R2215B-SC10) Development-CPP Topside

Construction & Offshore HUC

-

PTT Arthit (R2564-SC01) Central Process Platform (Module)

-

Conoco Philips - Kerisi (R2838-SC10) Development project-CPP (Process Piping)

-

Conoco Philips – Kerisi (R2839-SC09) Central Processing Platform – Construction

of substructure Kerisi Development project –CPP (Process Piping and Structure) –

Conoco Philips

-

Saipem 8 Leg Jacket

-

Keppel Fels West Berani ”Pontoon”

-

ANGEL DEV.PROJECT R2447-SC02). - Drilling Cassions, Temporary Work Decks

and Drill Rig Bell Housing

Position

:

Assistant UT Technician

Assignment

:

VARIOUS SHIPYARDS, Batam island – indonesia Conducting assist Ultrasonic Testing,

Project

Testing for hull structure of barqe,super tanker, bulk carrier etc as per Owner and

Clasification Society.standards such as : ABS, LR, NKK, GL, BV, DNV and BKl

Company : DC MALL FOOD COURT

Periods : 05 November, 2004 – 30 Maret 2005 (resign )

Position : Assisten Manager food court

Standby at : DC. MALL MALL – jodoh street

Company : PT. BATAM PARADISO TOUR and TRAVEL

Periods : 29 MARET 2004 – 24 April 2004 (resign )

Position : Staff Accounting and ticketing

Standby at : raden patah street

Company : OIS – OCEANNERING ( finish contract)

Period : March 25. 2002 to March 25. 2004 Position :Data Entry Clerk ( Document Control)

Standby at : PT.J.Ray.McDermott Indonesia Fabrication – batu ampar

Assignment :

Project

-Carried out as DATA ENTRY CLERK for Project:

-CONOCO Belanak field Development WELLHEAD “JACKET & DECK “

-JVPC RANGDONG Jacket & Deck Process Platform

-DOMINION SPAR HULL PROJECT “JACKET” Hard Tank

-CONOCO Belanak Field Development FPSO “ DECK “ Structure and Piping

Job Description :

-Input Data from QC Inspector & prepared complete report for submitted.

-Responsible for all Radiography Film and ensure client has review and signed

-Store films Radiography and ensure the film is complete and keep in boxes.

- Check outstanding report at technician and compare with data in computer.

-Ensure the report is not delay for submitted if the report has complete.

Company : CV. PESONA BINTAN SEJATI

Period : 11 juni 2001 – 03 juli 2002 ( resign )

Position Admin staff dan Lapangan

Standby at : Tanjung Pinang – Bintan island



Contact this candidate