Post Job Free
Sign in

Power Plant Engineer

Location:
PB, India
Salary:
Negotiable
Posted:
May 11, 2018

Contact this candidate

Resume:

RESUME

Gurbinder Singh

V.P.O. - Pamour

District - Fatehgarh Sahib, Punjab (140 406)

e-mail- ac5e9z@r.postjobfree.com

Mobile - +91-828*******

Career Summary

Power plant professional, a certified Boiler Operation Engineer, with around eleven years of extensive experience in the field of project management,operation and maintenance of captive power plants with emphasis on strategic planning and cost cutting techniques.

Educational Credentials

1.Boiler Operation Engineering, Kanpur Boiler Board, Uttar Pradesh,2014

2.MBA, Project Management, Sikkim Manipal University,Sikkim,74 % marks,2011

3.B.Tech, Mechanical Engineering, Punjab Technical University, Jalandhar, Punjab with 71 % marks,2007

Professional Experience

Ten years & ten months.

Employer Record

(A) Jagatjit Industries Limited, Kapurthala, Punjab

Worked as manager maintenance in utilities department from May 2014 to April 2018.

About the Organization :

1.Boiler : (1 X 50) TPH Thermax make AFBC type,65 kg/cm2 & 485 C

(1X 26) TPH Chemma make AFBC type, 32 kg/cm2 & 400 C

2.Turbine : (1 X 7 ) MW Triveni make

(1 X 4) MW Dressar Rand, Brazil make

Both extraction cum back pressure type

3.Distributed control system : Yokogawa make

4.Water treatment Plant : (1 X 60) m3/hr & (1 X 40) m3/hr of Ion exchange make

Job Description :

1.Complete operation and maintenance of power plant and utilities for continuous supply of power, steam and water at optimal cost.

2.Cold and hot start up and shut down of plant for routine maintenance.

3.Emergency plant handling in case of trippings,black out,breakdown etc.

4.Performing the functions of troubleshooting for reducing downtime to minimum.

5.Performance monitoring of boiler and turbine and condition monitoring of equipments.

6.Planning & execution of preventive/predictive/breakdown maintenance of all utility equipments including cooling towers,air compressors,pumps,fans,blowers,fuel handling & ash handling system etc.

7.Root cause analysis and review of maintenance breakdown of all critical equipments.

8.Preparation and control of annual plant maintenance budgets including capital expenditure.

9.Healthiness of steam network system and condensate recovery system.

10.Spares planning, indentation and purchase follow ups and vendor development.

11.Safety of personnel,facilities and equipment.

12.Implementation of Standard Operating Procedures,equipment lock out tag out procedures as per International Standardization of Organisation.

13.Energy and water management and conservation.

14.Man power management and training and development of subordinates.

15.Establishment of new projects and plant expansions with outside parties/contractors.

16.Statutory compliances/Liaisoning with government bodies as per legislation.

Major tasks/jobs performed :

1.Planning & execution of major shut down jobs of plant including replacement of boiler inbed coils.

2.Major overhauling of Triveni make and Dresser Rand make steam turbines.

Achievements :

1.100% Availability of mechanical equipments by implementation of preventive/predictive maintenance schedule.

2.Increase in condensate recovery up to 10% by improvement in condensate recovery system.

(B)Kalpataru Power Transmission Limited, Tonk, Rajasthan

Worked as deputy manager (O & M) in 8 MW bio-mass based power plant from Dec. 2012 to May 2014.

About the Organization :

1.Sitson make travelling grate boiler of 38 TPH, 45 kg/cm2 & 425 C.

2.8 MW HTC China make turbine of bleed cum condensing type.

Job Description :

1.Operation and maintenance of power plant and utilities.

2.Breakdown/predictive/preventive maintenance of equipments for reducing downtime to minimum.

3.Preparation of daily & monthly plant reports.

4.Spares planning and inventory management for all equipments.

Major tasks/jobs performed :

1.Overhauling of HTC turbine to attend vibrations & steam leakages.

2.Annual shut down maintenance of plant.

Achievements :

1. Achievement of budgeted operational parameters of plant.

2.Improvement in plant efficiency by 1%

(C)Nectar Life Sciences Limited, Dera Bassi, Punjab

Worked as senior engineer in (6 X 2) MW (biomass + coal) based power plant from July 2007 to Dec. 2012.

About the Organization :

1.(2 X 40) TPH Thermax make boilers of AFBC type,65 kg/cm2 & 485 C

2.(1 X 6) MW extraction cum condensing & (1 X 6) MW extraction cum back pressure turbine both of Triveni make.

Job Description :

1.Independently over saw shift operations of power plant.

2.To maintain all plant parameters as per standards.

3.Daily & monthly report preparation.

4.Manpower handling & work allocation during shift.

Major tasks/jobs performed :

1.Erection & commissioning of 40 TPH Thermax make boiler & 6 MW Triveni make turbine & associated steam pipe lines.

2.Complete replacement of boiler in bed coils,air preheater tubes and super heater coils.

Achievements :

1.Gained proficiency in operation of boiler and turbine through Distributed Control System.

2.Become efficient in independent handling of plant.

Specific Skills

1.Well versed with operations of Yokogawa,Siemens, Honeywell and ABB make DCS (Distributed Control System).

2.Overhauling of HTC, Dresser Rand, & Triveni make steam turbines.

3.Replacement of boiler pressure parts & maintenance of boiler furnace.

Computer Exposure

Basics of auto cad, Oracle ERP system, Windows, MS office, Internet explorer, Outlook express

Strengths

1.Excellent work and manpower management skills.

2.Adeptness and inquisitive behaviour.

3.Exceptional leadership and motivation skills.

4.Scrupulous approach towards task completion and achieving timelines.

Other Details

Date of Birth

: April 23,1985

Nationality

: Indian

Marital Status

: Married

Notice Period

: Immediate



Contact this candidate