Post Job Free

Resume

Sign in

Engineer Project

Location:
Glendale, CA
Salary:
90,000 per year
Posted:
November 02, 2017

Contact this candidate

Resume:

AFZAL A. (AFFY) Email: ac23qh@r.postjobfree.com

***** ***** ***** ****, ****** Ranch Residence Tel. No. 818-***-****) California 91326, Cellular Tel. No. 818-***-****) OBJECTIVE: A challenging position in the field of Mechanical Engineering ( H.V.A.C. DESIGN/Project Management ), AUTOCAD 2013, which will best utilize my training & experience while continuing my professional growth. OFFICE BIULDINGS:

. 1010 Wilshire Blvd. 18 Story Office bldg. ( 375,000 sq. ft. ) to Hi End Luxury Condominium conversion project using exist. (2) 500 Tons Chillers,

(2) new Boilers central plant, garage exhaust w/ CO Sensor, Smoke evacuation system, four pipe fan coils system for each Condominium unit total 250 units, Toilet Exhaust system with risers and sub-duct.

. Los Angeles Municipal Court Air Port branch 14 Story Bldg. ( 200,000 sq. ft. ) Central Plant, Design certain floors of the bldg.

. NASA, JPL La Canada Bldg. 11I new Variable Refrigerant Flow (VRF) replacement of water source heat pumps, cooling tower and boiler. Bldgs. 103 & 521 Tenant Improvement project replacing existing HVAC system and air distribution for ( 20,000 sq, ft. )

. BOEING Huntington Beach and Long Beach, Buildings 31, 22, 21, 159 and 17 Design of Various HVAC Engineering Projects.of Data Centers.

. NORTHROP GRUMMAN, Azusa, Buildings 160, (17,500 sq. ft.) Designed (2) VAV Air Handling Units with VFD, 100% economizer& Data Ctr.

. AERO SPACE CORPORATION, (TAC) Elsegundo, DOD Building A1, A6, D8, design of Various HVAC Engineering Projects of Data Centers.

. L. A. County Civic Center remodel, Pacoima, Variable Refrigerant flow (VRF) system multiple Fan coils &remote air cooled condensers.

. Hughes Towers, El-segundo, 100 Tons Air Cooled DX Chiller replacement Tenant Improvement project & critical facilities redundant Design.

. Lake Avenue Plaza, Pasadena, Two Cell Cooling Tower replacement with sand filteration system for 400 TONS system.

. Simi Valley Unified District Office,101 West Cochran Street, Simi Valley, CA ( 80,000 sq. ft.) Two story bldg. using (2) 60 Tons VAV Type Cooling only, (2) 30 Tons Gas//Electric, (1) 25 Tons Gas/Electric, (2) 20 Tons Gas/Electric, (1) 10 Tons Cooling Only and (3) 7.5 Heat Pump Units

(40) Fan Powered Boxes and (30) VAV Boxes, (1) Hot Water Reheat Boiler, (2) Hot Water Pimps, Expansion Tank and associated items.

. UNION BANK TOWERS, L.A. ( 25,000 sq. ft.) using 5, 7.5 & 10 Tons chilled, hot water air handler and air distribution and Data Centers.

. 11729 Encino Ave. Granada Hills, (18,000 sq. ft.) using Heat Pump Units of 20, 15, 10 & 7-1/2 Tons w/ VAV Parker terminal control System and commercial grease exhaust hood system, ANSUL FIRE SUPPRESSION system, economizer and power exhaust for bigger units.

. 601 S. Figueroa St. Sanwa Bank Plaza, Los Angeles, Fan powered boxes, VAV Boxes, IDF Rms. 9th. & 11th. fl. T & I design work.

. TOSHIBA AMERICA, Irvine CA, Air cooled Chiller replacement of 100 Tons for Critical Facility Computer Center and pumps. SCHOOLS:

. University of Southern California Health Care Center ( USC HCC-II ) ( 150,000 sq. ft. ) Seven-story bldg. comprised of Three medical office floors and one medical care center floor equipped with MRI, CT SCAN, Procedure rms., Surgery rms. Recovery rms. and other assisting clinics per OSHPAD requirements and Data centers.

. Southwestern University of Law, 625 Wilshire Blvd, L. A. ( 100,000 sq. ft. ) Three floors T & I Design, students dinning with commercial kitchen exhaust hood, fire suppression system, space heating central plant and VAV Terminal units with reheat coils for each floor per zoning.

. University of California Los Angeles (UCLA) Worked on various department T & I renovation HVAC Engineering projects and Data Centers

. University of California Santa Barbara (UCSB) designed lab research upblast strobic fan with pheonix valves and Dual duct AHU system.

. Glendale School District, Hoover Glendale High School, Replacement of 320 Tons Centrifugal Chiller & 4,200 MBH Boiler central plant design. HOSPITALS:

. Cedar Sinai Medical Center (CSMC) MRI Addition and CT Scanner Rm. projects. ( 50, 000 sq. ft.)

. Brea Community Hospital, Brea, (80,000 sq. ft. ) Replacement of 63 exist. AHU/Package Units w/ new PRE, FINAL FILTER, final arrangement.

.

. Westwood Medical Plaza, Westwood Dental office T & I work and fume hood for dentistry work and Data Center

. AMGEN ( AMERICAN GENETICS Biology Research Labs) Thousand Oaks, California, Building 26, 15 Fume hoods exhaust and make up . Systems with air pressure control Phoenix valves and upblast strobic fans for a world famous big research Center and Data Centers. AIRPORT AND INFRSTRUCTURE PROJECTS:

. LOS ANGELES AIRPORT (LAX), Tom Bradley, American Air Lines, United Air Lines, Continental Air Terminals new addition, On LAX under LAWA, Metro Rail projects and County and Civic Center. RESIDENTIAL/MIXUSE PROJECTS:

. 2525 Wilshire Blvd. Los Angeles, (150,000 sq. ft.) Mix use of 155 HI End Luxury Condominiums using RTU and Split System heat pump.

. 3609 Overland ( 120,000 sq. ft. ) comprised of Hi End Lofts, Condominium design and below grade garage exhaust with CO Sensor system.

. Design various 50 to 100 High End Villas and custom made Villas in Beverly Hills CO Sensor below Garage Exhaust System projects. Page 1 of 2

AUDIT AND REPORTS:

I was involve in the preparation of the following building's audit report and my primary responsibilities were to audit HVAC system equipment, plumbing equipment's data, quality of construction, safety procedure and etc. Study of as-built plans verses construction drawings, specifications and deficiencies in the construction. In case of big project my duties were to just get the field investigation.

.

. The Aerospace Corporation, (TAC) Elsegundo, Department of Defense. D.O.D. ( 1,000,000 sq, ft. ) Bldg. Nos. A1, A2, A3, A4, A5, A6, A7, A8, A8, B1, B2, C1, C2 & C3.

. Museum Square Office Complex, L.A. ( 300,000 sq. ft. )

. One Gateway Plaza, MTA Headquarter, L.A. ( 800,000 sq. ft. )

. Orange High School, Orange, Orange Unified School District ( 200,000 sq. ft. ) EDUCATION:

. Completed HVAC SYSTEM DESIGN Sequential course part I, II, III, IV from UCLA (UNIVERSITY OF CALIFORNIA LOS ANGELES) in 1998.

Completed LEED Certification Training Program in 2013 and AUTODESK REVIT 3D MEP Training Program.

. Completed Project Management Certificate of Completion from Boot camp Training from PSMJ Resources and Trade Tech.

. Completed HVAC DESIGN COURSEfrom CARRIER & HVAC TECHNOLOGYfrom Los Angeles Trade Tech. in 1991.

. INSTITUTE OF ENGINEERS, Lahore, Pakistan A.M.I.E. Section “A” in Mechanical Engineering in 1980.

. GOVERNMENT COLLEGE OF TECHNOLOGY,Lahore, Pakistan Associate Engineer in Mechanical Engineering in 1976. EMPLOYMENT HISTORY:

05/14 – Present S. Y. LEE AND ASSOCIATES INC. MEPC Engineering, Glendale, CA ( Senior Mechanical Engineer ) Working on all HVAC Projects with full responsibiltyfor a project from its inception, preparation of bid documents, construction drawings,HVAC Equipment selection, coordination with MEPS team, field work for existing project, Project Peer and constructability Review, mark the project for junior engineers, HVAC Installation, Project Management, if scope of work is beyond my capabilities, obtain some professional assistance as required. 06/09 – 04/14 BEST COMFORT SYSTEMS INC. Design /Built Contractor), Woodland Hills, CA ( Project Manager ) Engineered, Design/Built, Managed various HVAC projects as mentioned above. 11/03 – 05/09 ALL TEMPERATURE CONTROLLED, Design/Built Contractor Chatsworth, CA ( Project Engineer ) Engineered Design Built, Managed various HVAC projects, hired Electrical and structural engineer team. 03/96 - 10/03 DAVIDOVICH AND ASSOCIATES, MEP Engineering Culver City, CA ( Project Engineer ) Worked on various HVAC projects in the position as mentioned above. 11/87 - 02/96 KELLY STEWART GOLDSTEIN ENGINEERS, MEP Div, C.E.D. La-Canada, CA ( Project Designer ) Worked on various HVAC Projects in the position above. 01/81 - 12/86 EAGLETON ENGINEERING CO., Saudi Arabia, Main Office-Houston, TEXAS ( Designer II ) Design consultant for ARAMCO (Arabian American Oil Company), Saudi Arabia, I was involve in the preparation of design documents for ARAMCO Projects, Ras Tanura, Safaniyah, Qasim Refinery pipelines Abqaiqe Refinery, Gosp Renovation, LPG facilities and related projects. STATUS: U. S. Citizen

PROFESSIONAL Memberships: ASHRAE, AEE and MECA.

SPECIAL SKILLS: CARRIER HAP Calculations, ENERGY PRO, AUTOCAD 2014, ASHRAE STANDARD, SMACNA, Cost Estimating & Construction Management. Refrigeration, Micro Soft, Excel, UMC & UPC 2013 Page 2 of 2



Contact this candidate