Post Job Free

Resume

Sign in

Senior Drilling & Completion Fluids Engineer

Location:
Jakarta, Jakarta Capital Region, 13770, Indonesia
Posted:
May 07, 2013

Contact this candidate

Resume:

Adi Anom Sasongko

Indonesian, Birth May **th, ***1, Married

Jl. Swadaya IV No. 52. RT 10/11, Cijantung, Pasar Rebo, Jakarta Timur.

Indonesia, 13770.

Mobile: +628**********, Home: +622********

UAE Mobile: +971*********

Mail: abucwj@r.postjobfree.com

CAREER SUMMARY:

Professionals specialized in Drilling & Completion Fluids, with nearly 8

years of comprehensive oilfield experience in off-shore and on-land

drilling. Currently works as Mud Supervisor in Abu Dhabi Company for

Onshore Oil Operation, Abu Dhabi, UAE.

PROFESSIONAL EXPERIENCE:

July 2012 - Present: Abu Dhabi Company for Onshore Oil Operation (ADCO) -

UAE

Mud Supervisor (Drilling & Completion Fluids)

Under Drilling Technical department, provide supervising role of all

related Drilling and Completion Fluids in ADCO Rig's. Implementing and

Optimize drilling and completion fluids as per well program that can

improve well quality and reduce well time and cost. Monitor and maintain

mud properties during drilling. Planned and managed all Drilling and

completion fluids Chemicals, equipment and personnel movement for smooth

operation. Liaise with mud contactor representative and sub-contractors.

Recommend the proper use of all solids control equipment. Generate ADCO mud

report and recaps. Ensure HSE and waste management implementations are in

accordance with company policy. Experience in drilling Horizontal well, ERD

(horizontal section up to 9000 ft), depleted and fracture formation,

aerated drilling, H2S wells. Workover operation, etc.

July 2006 - July 2012: Halliburton Energy Services, Baroid - Indonesia

Field Professional I - Drilling Fluids (Mud Engineer)

Providing service supports to Halliburton Baroid. Provide Drilling Fluids

technical expertise in Drilling Site with particular system. Proficient in

Water Base, Oil Base and Completion Fluids system, all includes building,

maintain and troubleshooting. Performed regular fluids check on site.

Generate Drilling Fluids daily report and realize end of well recaps.

Performed real time/drill ahead hydraulic on well and hole cleaning

analysis. Pit management, fluids material & equipment inventory and cost

management on site.

Experience in HTHP drilling, high deviated wells, Optislim wells, H2S and

exploration wells. Extensive experience in wells with gravel packs

completion (Single Trip Multi Zone). Well clean up sequence using clean up

pills train. Building filtered completion fluids (KCl and NaCl). Supervise

filtration unit operation (Centrifugal Pumps, Slurry Kit, DE Press, Twin

Pod unit). Gravel pack pumping operation, etc.

In addition, I also have experience in Waste Management Operation when

serve a multi-purposes role for Baroid Surface Solution as rig site

supervisor and Waste Treatment Technical Support in Pendingin Ground

Control Base (Thermal Desorption Unit and Water Treatment Plant). Generated

Surface Solution & Waste management daily report (waste stream, Ave. ROC,

equipment performance, cost, etc) and realize end of well recaps.

May 2005 - June 2006: PERTAMINA Drilling Services Indonesia (PDSI)

Drilling Engineer Jr.

Provide services in Rig contractor and IPM services, I provide Drilling

Engineering technical assistance to Sr. Drilling Engineer and reports to

Project Manager of Suban Field Development, South Sumatra, Indonesia in a

Drilling Integrated Project Management (IPM). The role includes drilling

program preparation. Pore pressure prediction and analysis along with

operators G&G department, casing setting depth, drilling fluids and

hydraulic design, casing selection and cementing design, BHA & trajectory

design, Bit selection, to Rig sizing and selection and assist in well AFE

preparation. Exposed to Indonesian procurement system, assist in logistic

preparation and tender execution, liaison with operator representative and

sub-contractors. Land Rig operation and supervision proficiency, thru day

to day supervision of Suban field IPM wells (off/on site), well cost

monitoring, delivers daily drilling reports, realizes end of well reports

(includes NPT and lessons learned). Experiences in special drilling

operation and problems such as: freeing mechanical stuck pipe (Work on

pipe, FPIT run) to back-off operation (colliding tool run), fishing job,

plug cementing, uncontrolled deviation, drilling side track, hole pack off

and ballooning.

EDUCATION

1999-2004: Bachelors of Engineering, Petroleum

University of Pembangunan Nasional (UPN) "Veteran" Yogyakarta, Indonesia

2002-2003: Diplomas of Science, Management of Information

AMIKOM, Yogyakarta, Indonesia.

TRAINING & CERTIFICATIONS

H2S Training, Abu Dhabi, UAE, 2013

Stuck Pipe Prevention Course, Abu Dhabi, UAE, 2012

Baroid Block I Training, Houston TX, USA, 2010

T-BOSSIET, Cilegon, Indonesia, 2010

H2S Safety Training, Jakarta, Indonesia, 2009

Deep Water Technology course, Balikpapan, Indonesia, 2008

IADC Well Control Accreditation Program (WellCAP), Supervisory Level,

Balikpapan, Indonesia, 2007

Solids Control and Waste Management Training, Balikpapan, Indonesia, 2007

Fire Fighting Training, Balikpapan, Indonesia, 2007

Baroid Integrated Fluids Training I, Balikpapan, Indonesia, 2006

Baroid Drilling Fluid Graphics & Wellsight 2000 Software Training,

Balikpapan, Indonesia, 2006

Baroid "Mud School", Balikpapan, Indonesia, 2006

HUET & Sea Survival training, Cilegon, Indonesia, 2006

ADDITIONAL INFORMATION:

Computer proficiency: MS Office application (Word, Excel, PowerPoint),

BASIC Visual Programming, Baroid drilling fluids software (Wellsight 2000 &

Drilling Fluids Graphics), Drilling Planning Software (PDSI drilling

engineering software), etc.

REFEREES

Ade Nasution, Performance, Development and Competency (PDC) Coordinator,

Baroid Indonesia, Halliburton Energy Services Indonesia

abucwj@r.postjobfree.com

Irawan Nugroho, Chief of Drilling, Upstream Tech. Center, PT Pertamina

(persero), Indonesia

Phone: +62-21-350**** ext 1526, abucwj@r.postjobfree.com

FIELD EXPERIENCE

Company, Rig, Description Issues Year

Well, Location

ADCO, Abu Dhabi, Mud Supervisor - Spud Drilling depleted and 2012 -

ND-56 Rig, ND-53 Mud, Polymer mud, fracture formation. Present

Rig, ND-38 Rig, KCl/PHPA//Glycol, OBM Long Horizontal

ND-55 Rig (MI Megadril, (ERD), Formation

Versadrill), NDF, losses, Aerated

Completion brines (KCl, Drilling, stuck pipe,

NaCl, CaCl2) H2S well. Workover

operation

TOTAL E&P Mud Engineer - HTHP, ELA, Optislim, 2010 -

Indonesie - APD KCL/Polymer, LT-OBM High Deviaton, 2012

Raissa #103 Rig, (Enviromul), Wash Train Formation Losses,

Transocean (well clean up), KCl Pack off, Ballooning,

Hibiscus Rig, APD Brine, Completion & Gumbo, High Torque &

Raisis #102 Rig, Packer Fluid Drag, Reactive

East Kalimantan formation, Gravel

Pack Operation.

Permata Intl. - Mud Engineer Reactive Formation, 2010

APD 02 Rig, -KCl/PHPA/Polymer/Glycol Tight Hole

Indramayu

MEDCO E&P Mud Engineer - Flocculation, 2009

Indonesia - EMSCO Native mud, Ballooning, Gumbo,

Rig, DRECO Rig, KCL/PHPA/Polymer, NaCl Partial Loss, H2S

South Sumatera Brine well

TOTAL E&P Baroid Surface Solution Rig site waste 2007 -

Indonesie - (BSS) Rig Site management, Rig 2009

Searex IV,Maera, Supervisor equipment maintenance

Yani, Raissa, & troubleshooting.

Hibiscus, Raisis High ROC of drilled

#102, East cuttings.

Kalimantan

TOTAL E&P Baroid Surface Solution High COD & Oil 2007

Indonesie - BSS (BSS) Waste Treatment Content of slop water

Pendingin Ground Engineer on MBF unit & water

Control Site, treatment plant, High

East Kalimantan ROC of untreated

cutting

MEDCO E&P Mud Engineer - Flocculation, 2007

Indonesia - SPA KCL/PHPA/Polymer Ballooning, Gumbo,

10 Rig, South Partial Loss

Sumatera

VICO Indonesia - Mud Engineer - Depleted sand 2006

APD 10 Rig, East OBM - Enviromul drilling, Partial

Kalimantan losses

VICO Indonesia - LMP Lab Support - OBM treatment and 2006

Saliki Liquid Mud OBM - Enviromul recondition from the

Plant Rigs

PT. Pertamina EP Drilling Engineer Jr. Exploration wells, 2005 -

- PDSI N110-M3 Stuck pipe, back-off 2006

Rig, South pipe, fishing job,

Sumatra, plug cementing,

Indonesia uncontrolled

deviation, drilling

side track, hole pack

off, formation

ballooning.



Contact this candidate