Post Job Free

Resume

Sign in

Customer Service Electrical

Location:
Reynoldsburg, OH
Salary:
25.00
Posted:
May 06, 2013

Contact this candidate

Resume:

Ibn R Meyo

**** ******** ** *****, ***** ***** ? 903-***-**** ?

abuaga@r.postjobfree.com

"Reducing time, money, energy through ingenuity"

Education

The University of Texas Tyler, Texas

Bachelor of Science, Electrical Engineering December 2009

Electrical Engineering I, MATLAB for Engineers, Digital Systems, Linear

Circuits Analysis I/II, Electronic Circuits Analysis I/II,

Microprocessors, Electromagnetic Fields, Senior Design I/II, Signals and

Systems, Solid States Electronic Devices, Power Systems, Communications

Theory, Automatic Controls, Probability and Statistics for Engineers.

Kilgore College Kilgore, Texas

Associate of Applied Science in Process Technology 2010-2011

Principles of Quality, Safety Health and Environment, Introduction to

Corrosion, Process Equipment.

Experience

Flextronics Longview, Texas

Test Engineer (Jr) November 2012- Present

> Performs system level RF test on Microwave Packet Radios (MPR 9500 IDU

and ODU) and Microwave Digital Radios (MDR 8000).

> Responsible for testing and troubleshooting radios using RF power

meter, spectrum analyzer, DS signal generator and frequency counter.

> Works with RF filters and waveguide for transmission, sets up

apparatus and conducts electronic assemblies and unit following

established procedures, sequences and standards.

Easy Stop Retail Store and Service Station Tyler, Texas

Store Manager Associate December 2009- October

2012

> Responsible for goods' receiving and inventory; customer service.

> Cash flow management and payroll.

> Reduced business' expenses $400 monthly by implementing a day-to-day sale

count of specific items sold using an Excel spreadsheet.

The University of Texas Tyler, Texas

Computer laboratory Assistant January 2008- November

2008

> Quality assessment of systems through daily troubleshooting.

> Provided assistance to students with questions regarding using

equipment and computer software.

> Maintained records of daily data communication of transactions, problems

and remedial actions taken.

Smurfit Stone Corrugated Tyler, Texas

Maintenance Department worker May 2008- August 2008

> Originated current inventory system to enhance flow using Excel

spreadsheet.

> Backed up technicians and assumed daily operation of corrugators.

Ozarka Nestle Water Plant Hawkins, Texas

Assembly Line employee May 2007- August 2007

> Quality control to meet customer specifications. Performed visual

inspection and reported to leadership.

> Manufacturing troubleshooting. Utilized process improvement techniques to

enhance production.

Classroom Projects

Engineering Methods (Team Project) - Designed and built a working model

of a drawbridge; bridge opened and closed automatically or manually

operated by a remote control in 90 seconds or less.

Electrical Engineering I (Individual Project) - Built the circuit board

for a water-level monitor equipped with an alarm system.

EENG 3299 (Team Project) - Participated in the design of a program and

the circuit board of the Grandfather Clock for "The Nutcracker

Production". The off-stage controller system consisted of a AT89S51

microcontroller, a 74C9228 16-key encoder and a keyboard; program written

in assembly directed commands to a set of stepper motors to control the

hands to execute forward and reverse motions. Diagrams for the clock and

the hand controller were drawn using Microsoft Visio.

Senior Design I/II (Team Project) - Designed and implemented a fully

working physical system applying fuzzy logic and PI algorithms to achieve

motor speed control under varying load conditions. The fluctuation of the

motors' speed was controlled via a board by a Renesas micro-controller,

the simulation of the circuit was performed with the evaluation (student)

version of PSpice 8.0 circuit-simulation software.

Additional Information

Keywords: Digital Multimeter, Spectrum Analyzer, Digital oscilloscope and

multi-output generator, Dual Power Meter, Frequency Counter, AutoCAD,

Visio, SolidWorks.

Microsoft applications: Word, Excel, Power Point, Access, Outlook.

Software: Proficient in C/C++, Lab VIEW, MATLAB, Assembler, PSpice, and

Visual Basic.

Languages: Bi lingual English-French, limited Spanish.

Professional Affiliations: Student member of Institute of Electrical and

Electronics Engineers, Inc. (IEEE) and National Society of Black Engineers

(NSBE).

REFERENCES AVAILABLE UPON REQUEST



Contact this candidate