EDWARD BAUER

106 Gaunt Drive, Mickleton, New Jersey 08056

Home: 856-***-**** - Cell: 856-***-**** - abqqff@r.postjobfree.com

Objective

To obtain a position in a Maintenance or Project Supervisory role in which I can utilize my 41 years of refining industry experience and knowledge of the Safety and Environmental requirements necessary to maintain a safe and reliable facility.

SKILLS

Strong skills in Pipefitting and Boilermaker as a 1st class fitter and provided supervision of pipe and boilermaker work.

Background in daily Maintenance Planning:

Reviewing work requests, estimating manpower and man-hours, as well as material ordering and contract initiation.

Extensive leadership experience with 32 years of supervising multicrafts on daily and turnaround work activities to establish a teamwork atmosphere and set expectations to meet a common goal safely and cost effectively.

Basic knowledge of Refinery Operations, Safe Work Practices Environmental Procedures.

Proficient in SAP using program to plan daily work and create detailed standard plans for refinery fixed equipment.

W ORK HISTORY

02/2009 to Capitol Construction Coordinator

02/2012Nu Star Energy Asphalt Refinery Paulsboro,NJ

Employed by Innovative Turnaround Controls (I.T.C). Working in the Nu Star Energy Asphalt Refinery,

Paulsboro facility.

Responsible for the coordination and field execution of the Capitol Construction.

Accountable for reviewing IFC drawings and working with the project managers, as well as the assigned field construction team in the following Capitol Projects:

Installation of new Sub-Station and rewiring in the OM area.

Installing vapor control for all floating roof tanks.

Installation of new Dock Loading Arms.

Installation of new Crude Pumping Station. All civil, steel, piping and equipment.

Control room remodel. Installed new DCS control cabinets, Marshaling cabinets, Remote IO building and wire pulls.

Installation of heater SIS controls.

Major revamp of refinery Waste Water Plant. Civil work, construction of fiberglass tanks, install new process tanks, pumps and FRP process piping.

Installation of new FRP Waste Water effluent piping.

02/2006 to Construction Supervisor

02/2009Valero Energy Delaware City,DE

Responsible for overseeing all new Capitol Construction work with-in the Delaware City Refinery.

Instrumental in relocation of the North Flare, installation of a Drag Chain System for loading coke slurry, constructing a Coke Silo and Ball Mill for coke out hauling and slurry processing for the Gassifier's.

Involved in the FCC LOTOX project and CO Boiler Project which involved the installation of 42' of additional can section to the FCC Absorber Tower and the installation of a 162