Post Job Free

Resume

Sign in

Engineer Maintenance

Location:
United Arab Emirates
Posted:
January 19, 2013

Contact this candidate

Resume:

Nokia BSS/RAN Engineer (Nokia *G/*G/WCDMA Ultra, Metro and Flexi BTS, Huawei Node-B BTS3900, 2G BTS 3900, Huawei RTN620 TRS Equipments)

Resume keywords summary: Integration / Commissioning / Troubleshooting of Nokia 2G/3G/WCDMA Ultra, Metro,Flexi BTS and Nokia Transmission Equipments, Huawei Node-B BTS3900, 2G BTS3900, RTN620 TRS equipments.

Contact Information

Please log in to see the contact information!

Work Experience

Experience level: 5-10 years

Profile/Cover Letter: DHIRAJ KUMAR

Future Communication Company Intl, LLC

Dubai - UAE.

E-mail- abp90z@r.postjobfree.com

Contact no. +971*********, +971*********

CAREER OBJECTIVE

To secure a challenging position with the opportunity for professional growth based upon performance that will utilize my abilities developed through my education and experience in Telecom while contributing to the success of my employer.

TOTAL WORK EXPERIENCE

6 - Years experience in Telecom as Sr. BSS/RAN Engineer (O&M)

TELECOM SKILLS

Maintenance/Commissioning/Integration/ Trouble shooting of 2G & 3G- Nokia Flexi BTS sites.

Commissioning/ Integration/ Trouble shooting of Nokia 3G-Node-B (Supreme / Metro-50) &

2G BTS (Ultra/ Metro) sites.

Commissioning & maintenance of ECI MUX, Micro SDM, XDM-100, XDM-500, SDH and PDH equipments.

Implementation & Configuration of SDH & PDH transmission equipments (NEC, NERA, Flexi XC, SRA4, Flexi Hybrid, FIU19E, IFUE, STM-1, FXC RRI).

Commissioning & maintenance of Microwave link with radio 38GHz, 13GHz, 15GHz, 7GHz (ERICSSON/NOKIA/NEC).

Implementation & Configuration of microwave antenna (Nokia link, NEC link, NERA link).

Sweep Test (VSWR, DTF, RL) by using Bird, Anritsu, Aligent site masters.

Power, BTS and Electrical Alarms (DG and Batteries).

Survey of Sites for Installation.

Preparing MRF for material delivery.

Fault Diagnosis of Microwave Equipments and BTS related fault.

Operation & maintenance of BTS and Microwave links.

Conducting Acceptance test (AT) for New BTS sites.

Weekly preventive maintenance for the BSC/RNC, Back Bone and BTS sites.

JOB EXPERIENCE

Period August.2007 to till date.

Organization Future Communication Company International-LLC, Dubai-UAE.

Project DU (GSM & WCDMA).

Designation Sr. BSS/RAN Engineer

Presently working with FCCI-LLC for DU Operator, Dubai (UAE) Project as Sr. BSS/RAN ENGINEER. Job responsibilities included Commissioning / Integration / Trouble shooting / maintenance of Node-B/ BTS/ TRS sites. Material Management, New site acceptance, Monthly preventive maintenance, Telecom Implementation and Co-ordination with all the Sub Vendors and Teams.

JOB RESPONSIBILITY

Commissioning / Integration / Trouble shooting of Nokia 3G-Node-B (Supreme / Metro-50) & 2G BTS (Ultra/ Metro) sites.

Maintenance of Nokia 3G-Node-B (Supreme / Metro-50) & 2G BTS (Ultra/ Metro) sites.

Maintenance / Commissioning / Integration / Trouble shooting of 2G & 3G- Nokia Flexi BTS sites

To upgrade new Software version for AXUB, IFUE, FXC-RRI, FIU19E, FIFA/FTFA, ODU, 3G-Node-B (Supreme / Metro-50) & 2G BTS (Ultra/ Metro) sites.

To upgrade new Software version for 3G Flexi WCDMA BTS, 2G Flexi EDGE BTS sites.

Maintenance of all types of network links i.e. SDH, PDH and OFC.

Implementation & Configuration of SDH & PDH transmission equipments (NEC, NERA, Flexi XC,

Siemens SRA4, Flexi Hybrid, FIU19E, IFUE, STM-1, FXC RRI).

GPRS and call testing for newly integrated BSC, 2G/3G BTS site.

Check the status of BTS, power calibration and optimization.

Monthly preventive maintenance of the BSC, back bone and BTS sites.

Implementation & Configuration of microwave antenna (Nokia link, NEC link, NERA link)

Measurement of VSWR, DTF, RL, Antenna sweep test result, forward & reverse power measurement and checking of alarms.

Handling Power measurement and checking of alarms, measurement of VSWR.

Conducting Acceptance test of new sites with all testing equipments.

Conducting Acceptance test (AT) for newly integrated BSC3i, 2G/3G BTS sites.

Handling all electrical work related to shelter, tower, BTS, DG, SMPS and BATTERY.

Monitoring QUALITY CONTROL during site installation.

Period June.2005 to August.2007

Organization Nokia Siemens Networks, Lucknow-India

Project NSN-Hutch (GSM)

Designation Sr. BSS Engineer (Project / O&M)

Worked with Nokia Siemens Networks, Lucknow (India) for HUTCH Project as Sr. BSS ENGINEER (Project/ O&M). Job responsibilities included Commissioning / Integration / Trouble shooting / maintenance of Nokia BSC3i, 2G Nokia BTS sites. Material Management, Telecom Implementation and Co-ordination with all the Sub Vendors and Teams.

JOB RESPONSIBILITY

New Software version up gradation for Nokia BSC 3i.

New CD implementation for Nokia BSC3i.

Software up gradation of (15 GHz / 7 GHz ) Nokia MW equipments - FXC RRI, FXC E1T1, FIU & ODU etc

BSC Operation, Maintenance & Migration of BTS Sites from One BSC to another BSC, Alarms monitoring of BSC's and their Cell Sites

Commissioning / Integration / Trouble shooting of 2G Nokia BTS (Ultra/ Metro) sites.

Maintenance of 2G Nokia BTS (Ultra/ Metro) sites.

Implementation of EDGE, MULTIDROP and MULTIBCF in Nokia BTS.

Commissioning & maintenance of ECI MUX, Micro SDM, XDM-100, XDM-500, SDH and PDH equipments.

Maintenance of all types of network links i.e. SDH, PDH and OFC.

Check the status of BTS, power calibration and optimization.

Implementation & Configuration of microwave antenna (Nokia link, NEC link, NERA link)

Measurement of VSWR, DTF, RL, Antenna sweep test result, forward & reverse power measurement and checking of alarms.

Handling Power measurement and checking of alarms, measurement of VSWR.

Conducting Acceptance test Using Power meter & Site Masters, BIRD, ANRITSU.

Handling all electrical work related to shelter, tower, BTS, DG, SMPS, BBS, and BATTERY.

Conducting Acceptance test (AT) of Tower. BTS, DG, EARTHING.

Monitoring QUALITY CONTROL during site installation.

BSS ROLES & RESPONSIBILITIES

PROJECT

Site Identification and acquisition of BTS sites.

Co-Ordination with Planning Team for RND, TND clearances.

Co-Ordination with legal, civil and Electrical Departments for further clearances.

Routing of E1s PDH Nokia, SDH & ECI MUX for new sites for integrating it with BSC.

Commissioning of Ericsson & Nokia 7, 15 & 23 GHz PDH hops.

Integration & Commissioning of Nokia Base Stations with EDGE Enhancement.

Co Ordination with NOC during site integration.

BTS External Alarm Integration in co ordination with electrical department.

Site preparations and documentation.

Quality Checking & Acceptance test for newly commissioned sites in co ordination with vendor.

Capacity Additions TRX Addition, 4th sector additions in the n/w.

Extending of A-Ters for remote BSCs from RBSC to MSC till Transcoder via SDH as per OMCR

requisitions.

Commissioning of SDH radios & multiplexes.

BTS sites expansion, Cascading & Up gradation of Multiplexes (PDH&SDH).

Migrating of sites from BSCs as per the RF requisitions.

Warehousing & Logistics in co ordination with Materials Department.

O&M BTS & PDH

Breakdown Maintenance of Nokia Mini link system.

Breakdown maintenance of BTS-Nokia.

Co-Ordination with NOC while breakdown maintenance.

Co-Ordination with VSNL while provisioning of POI streams and breakdown maintenance of POI streams.

Co ordination with other operators Tata, REL & Airtel for POI connectivity.

Monthly Preventive maintenance of PDH/BTS sites.

Clearing all Internal & External alarms in the network.

AT test with BSNL for POI streams and Co-Ordination with BSNL regarding POI streams

Spares, Tools and Test equipments management.

O&M SDH

To Maintain the SDH network microwave & OFC for minimizing the outage time.

Installation & Commissioning of Mux & Radios in Co ordination with Vendors.

Quality checking and Acceptance test in coordination with vendors.

Preparation of Installation certificates & other documents related to projects.

Preventive & Corrective maintenance of SDH equipments by clearing the Major/Minor/Critical alarms in the network with minimum outages.

Routing of E1s for new sites in SDH hops.

Expansion of Multiplexes to enhance the capacity of E1s by adding Tex 42.

Swapping of Multiplexes to upgrade the capacity of Aggregate to form ring network.

Preparations of reports for SDH network related to outages & performance on weekly and monthly basis.

MAJOR ROLLOUT ACTIVITIES

Swap Rollout Swapping of BTS from Ericsson to Nokia BTS with EDGE Enhancement in co ordination with vendor.

Implementation of SDH network in the Existing PDH & shifting of E1s from PDH hop to SDH hops.

Extension of A Ters for Remote BSCs and Migration of sites from 2 Ericsson BSCs to Nokia BSCs.

Project Rollout in the network successfully in time.

TECHNOLOGY & EQUIPMENT EXPERIENCE

NOKIA 2G - Flexi EDGE BTS, Nokia BTS (Ultra site & Metro site),

NOKIA 3G - Node-B (Supreme & Metro50), Flexi BTS.

Ericsson 2G - RBS2202, RBS2204, RBS2206

Huawei 2G - Ultra BTS 3606E, Ultra BTS3012

Huawei 3G - Ultra BTS 3812E, BBU3900

Microwave - High capacity NEC SDH & PDH, NERA SDH & PDH link, FIU19E with

Radio (7, 15, 18, 23, 38GHz), Nokia Metro Hub with PDH rings Network.

SDH, MUX - ECI Mux (Micro SDM, XDM 50, XDM 100, XDM 500) with NEC, NERA Radio.

TEST EQUIPMENT USED

BTS SITE MASTER - ANRISTU, BIRD, ALIGENT.

BER METER - BIRD, SUNNET, GN NETTEST.

GPS - GPS V, GARMIN 12XL

FREQUENCY COUNTER - PENDULUM

DIGITAL POWER METER - BIRD

STRENGTH

Proactive to challenging environment.

Ability to work in team and individually.

Self-motivating, hard working and result oriented.

Positive attitude towards life.

Ability to gain knowledge & learn.

PROFESSIONAL QUALIFICATION

B.Tech. (Electronics & Communication Engineering) passed with 70% marks in 2005.

F.E.T. Agra College, Agra.

Utter Pradesh Technical University, Lucknow-India.

PERSONAL DETAILS

NAME Dhiraj Kumar

FATHERS NAME B.S. Chahar

DATE OF BIRTH 15th.Sep.1982

SEX Male

NATIONALITY Indian

MARITAL STATUS Single

LANGUAGE English, Hindi

DECLARATION

I, hereby declare that all the details furnished above are accurate to the best of my knowledge.

DATE (Dhiraj Kumar)

PLACE DUBAI (UAE)

Employer: FCCI-LLC, Dubai-UAE

Job Title: Sr. BSS/RAN Engineer

Start Month/Year: 08/2007

End Month/Year: Current

City: Dubai

Country: United Arab Emirates

Description: Presently working with FCCI-LLC for DU, Dubai (UAE) Project as Sr. BSS/RAN ENGINEER. Job responsibilities included Commissioning / Integration / Trouble shooting / maintenance of 2G & 3G Nokia BTS sites. Material Management, New site acceptance, Monthly preventive maintenance, Telecom Implementation and Co-ordination with all the Sub Vendors and Teams.

JOB RESPONSIBILITY:

Commissioning / Integration / Trouble shooting of Nokia 3G-Node-B (Supreme / Metro-50) & 2G BTS (Ultra/ Metro)

Employer: Nokia Seimens Networks, Lucknow-India

Job Title: Sr. BSS Engineer

Start Month/Year: 06/2005

End Month/Year: 08/2007

City: Lucknow

Country: India

Description: Worked with Nokia Siemens Networks, Lucknow (India) for HUTCH Project as Sr. BSS ENGINEER (Project/ O&M). Job responsibilities included Commissioning / Integration / Trouble shooting / maintenance of Nokia BSC3i, 2G Nokia BTS sites. Material Management, Telecom Implementation and Co-ordination with all the Sub Vendors and Teams.

JOB RESPONSIBILITY:

Maintenance / Implementation / Trouble shooting of Nokia BSC 3i & TCSM.

New Software version up gradation for Nokia BSC 3i.

New CD implementation for Nokia BSC.

Software Up gradation of (15 GHz / 7 GHz ) Nokia M\W equipments - FXC RRI, FXC E1T1, FIU & ODU etc

BSC Operation, Maintenance & Migration of BTS Sites from One BSC to another BSC, Alarms monitoring of BSC's and their Cell Sites

Commissioning / Integration / Trouble shooting of 2G Nokia BTS (Ultra/ Metro) sites.

Maintenance of 2G Nokia BTS (Ultra/ Metro) sites.

Implementation of EDGE, MULTIDROP and MULTIBCF in Nokia BTS.

Commissioning & maintenance of ECI MUX, Micro SDM, XDM-100, XDM-500, SDH and PDH equipments.

Maintenance of all types of network links i.e. SDH, PDH and OFC.

Check the status of BTS, power calibration and optimization.

Implementation & Configuration of microwave antenna (Nokia link, NEC link, NERA link)

Measurement of VSWR, DTF, RL, Antenna sweep test result, forward & reverse power measurement and checking of alarms.

Handling Power measurement and checking of alarms, measurement of VSWR.

Conducting Acceptance test Using Power meter & Site Masters, BIRD, ANRITSU.

Handling all electrical work related to shelter, tower, BTS, DG, SMPS, BBS, and BATTERY.

Conducting Acceptance test (AT) of Tower. BTS, DG, EARTHING.

Monitoring QUALITY CONTROL during site installation.

Background and Experience

Education Level: Bachelor's Degree

School Name: UP. Technical University, Lucknow-India

Major: Electronics & Communication Engineering

City: Lucknow

Country: India

Graduation Date: 25/06/2005

Description: B.Tech (Electronics & Communication Engineering)passed with 70% marks in 2005.

Job Category: 3g/GSM/WCDMA/HSDPA/UMTS Job

Job Type: Any Job Type

Job Status: Start in 3 month

Desired Salary: $0 a month

Desired Location: Any

Willing to Relocate: Yes



Contact this candidate